Progress of 23-01-2023 Reported on 24-01-2023

Progress of Lining & BLT


Tunnel Lining (Main)
Balance as Daily progress for month of Jan'23 Progress
S. Item/ during the Balance as on Cumulative No of Gantry
PSUs Agency Unit Total scope on
No. Description month date progress (Regular-Wider section)
01-01-2023 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Jan'23

1 T-1 ABCIL m 3159 700 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 700 2459.0 0

2 T-13 KRCL HCC m 9274 1242 0.0 30.0 12.0 12.0 12.0 12.0 12.0 12.0 6.0 12.0 18.0 12.0 0.0 12.0 12.0 12.0 0.0 18.0 12.0 0.0 12.0 24.0 0.0 252.0 990 8284.0 5R+1W

3 T-14 A HCC m 1815 971 0.0 12.0 0.0 0.0 0.0 12.0 0.0 0.0 0.0 12.0 0.0 0.0 0.0 0.0 0.0 12.0 0.0 0.0 12.0 0.0 0.0 0.0 12.0 72.0 899 916.0 1R

4 T-14 B AGE-Patel JV m 4469 1428 0.0 0.0 12.5 0.0 12.5 0.0 0.0 0.0 12.50 12.5 12.5 0.0 0.0 12.5 0.0 0.0 0.0 12.5 12.5 0.0 12.5 0.0 0.0 112.5 1315 3154.0 3R

5 T-15 AGE-Patel JV m 9765 185 0.0 0.0 12.5 0.0 12.5 0.0 12.5 0.0 0.0 12.5 0.0 0.0 0.0 12.5 12.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 75.0 110 9655.0 4R

6 T-48 IRCON GECPL m 10186 1036 0.0 25.0 12.5 0.0 12.5 25.0 12.5 12.5 12.5 25.0 25.0 12.5 12.5 0.0 0.0 25.0 25.0 12.5 25.0 12.5 25.0 25.0 12.5 350.0 686 9500.5 5R

HCC & 3R
7 T-49 m 12769 77 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12.5 0.0 0.0 12.5 0.0 12.5 12.5 0.0 0.0 0.0 0.0 25.0 0.0 0.0 75.0 2 12767.0
AFCONS
8 T-77D ABCI & BCC m 1911 997 0.0 20.0 12.0 24.0 12.0 24.0 12.0 12.0 12.0 0.0 12.0 12.0 12.0 0.0 12.0 16.7 0.0 12.0 12.0 0.0 23.5 0.0 12.0 252.2 744 1166.7 4R

Total KRCL m 14248 2913 0.0 42.0 12.0 12.0 12.0 24.0 12.0 12.0 6.0 24.0 18.0 12.0 0.0 12.0 12.0 24.0 0.0 18.0 24.0 0.0 12.0 24.0 12.0 324.0 2589 11659.0
Total IRCON m 39100 3723 0.0 45.0 49.5 24.0 49.5 49.0 37.0 24.5 37.0 62.5 49.5 24.5 37.0 25.0 37.0 54.2 25.0 37.0 49.5 12.5 86.0 25.0 24.5 864.7 2857 36243.2
Grand Total m 53348 6636 0.0 87.0 61.5 36.0 61.5 73.0 49.0 36.5 43.0 86.5 67.5 36.5 37.0 37.0 49.0 78.2 25.0 55.0 73.5 12.5 98.0 49.0 36.5 1188.7 5445.8 47902.2
Tunnel Lining (Escape)

Balance as Daily progress for month of Jan'23 Progress Balance as on


S. Item/ during the date Cumulative
PSUs Agency Unit Total scope on No of Gantry
No. Description month (For below progress
01-01-2023 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Jan'23 tunnels)

1 T-13 HCC m 9109 4193.0 0.0 12.0 12.0 12.0 12.0 12.0 12.0 0.0 12.0 0.0 12.0 12.0 12.0 0.0 12.0 0.0 36.0 0.0 12.0 24.0 12.0 0.0 0.0 216.0 3977 5132.0 3
KRCL
2 T-14 A HCC m 1815 1795.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1815 0.0 0

3 T-14 B AGE-Patel JV m 4469 2448.7 0.0 6.8 0.0 12.5 0.0 12.5 12.5 12.5 0.0 0.0 0.0 25.0 0.0 0.0 12.5 12.5 12.5 0.0 0.0 12.5 0.0 12.5 12.5 156.8 2272 2197.1 2

4 T-15 AGE-Patel JV m 9878 1430.9 0.0 0.0 0.0 0.0 0.0 12.5 0.0 12.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12.5 0.0 0.0 37.5 1393 8484.6 4

5 T-48 IRCON GECPL m 9788 658.5 0.0 12.0 18.0 0.0 0.0 6.0 0.0 0.0 12.0 0.0 0.0 12.0 0.0 0.0 0.0 12.0 0.0 0.0 0.0 12.0 0.0 0.0 0.0 84.0 575 9213.5 2
HCC & 2
6 T-49 m 12898 1050.0 0.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 3.0 3.0 3.0 0.0 0.0 0.0 3.0 0.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0 21.0 1029 11869.0
AFCONS
7 T-74R ABCI m 7412 187.0 6.0 0.0 6.0 0.0 6.0 0.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.0 0.0 0.0 6.0 6.0 0.0 42.0 145 7267.0 2

Total KRCL m 10924 5988 0.0 12.0 12.0 12.0 12.0 12.0 12.0 0.0 12.0 0.0 12.0 12.0 12.0 0.0 12.0 0.0 36.0 0.0 12.0 24.0 12.0 0.0 0.0 216.0 5792 5132.0
Total IRCON m 44445 5775 6.0 18.8 27.0 12.5 6.0 31.0 12.5 31.0 15.0 3.0 3.0 37.0 0.0 0.0 15.5 24.5 12.5 12.0 0.0 24.5 18.5 18.5 12.5 341.3 5414 39031.2
Grand Total m 55369 11763 6.0 30.8 39.0 24.5 18.0 43.0 24.5 31.0 27.0 3.0 15.0 49.0 12.0 0.0 27.5 24.5 48.5 12.0 12.0 48.5 30.5 18.5 12.5 557.3 11205.8 44163.2
BLT
Balance as on Daily progress for month of Jan'23 Progress Balance as on Date of Gang Length of
S. Item/ 01-01-2023 during the date Comulative Available at Location of Track ready
PSUs Agency Unit Total scope
No. Description (For below month (For below progress site Gang for trolley
tunnels) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Jan'23 tunnels) (DD/MM/YY) inspection

1 Katra Yard-T8&T9 Rahee m 798 666 12.0 0.0 0.0 36.0 0.0 0.0 0.0 0.0 36 0.0 0.0 36.0 0.0 0.0 0.0 36.0 0.0 0.0 0.0 36.0 0.0 0.0 0.0 192.0 474 324.0 11-Dec-22 324
1
2 T-8/9 Rahee m 1486 1303 0.0 0.0 66.0 0.0 0.0 68 0.0 0.0 0.0 76.0 0.0 0.0 0.0 74.0 0.0 0.0 80.0 0.0 0.0 81 0.0 0.0 0.0 445.0 858 628.0 21-Dec-22
KRCL
3 T-10 (NR) Rahee m 970 98 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 98 872.0 1-Sep-22 1 872
4 T-2 Rahee m 5093 4741 0.0 0.0 73.0 0.0 78.0 0.0 70.0 0.0 0.0 74.0 0.0 72.0 0.0 0.0 74.0 0.0 73.0 70.0 72.0 0.0 72.0 72.0 0.0 800.0 3941 1152.0 19-Dec-22 2
5 T-3 Rahee m 3009 715 0.0 0.0 0.0 0.0 73.0 0.0 0.0 0.0 0.0 0.0 65.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 138.0 577 2432.0 16-Sep-22 2432
KRCL RAHEE Total 11356 7523 12 0 139 36 151 68 70 0 36 150 65 108 0 74 74 36 153 70 72 117 72 72 0 1575 5948 5408
T-5(Including Wider Paras-POSVL
6 m 5959 3601 0.0 57.5 57.5 57.5 57.5 57.5 0.0 115.0 0.0 57.5 57.5 57.5 0.0 57.5 57.5 57.5 0.0 57.5 0.0 115.0 0.0 0.0 57.5 977.5 2624 3335.5 23-Sep-22 2 3335
Section) (JV)

Paras-POSVL 3401 (Except


7 T-6 m 3493 270 0.0 60.0 0.0 0.0 0.0 60.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 57.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 177.5 92 3401.0 Completed
(JV) Transition)

Paras-POSVL 601 (Except


8 T-9 m 688 87 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 87 601.0 Completed
(JV) Transition)
1
Paras-POSVL 920 (Except
9 T-10 m 1010 90 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 90 920.5 Completed
(JV) Transition)
KRCL Paras-POSVL
10 T-11 m 830 82 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 82 748.0 9-Oct-22 748
(JV)
Paras-POSVL 1782 (Except
11 T-12 m 2123 341 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 341 1782.5 Completed
(JV) Transition)
Paras-POSVL
12 T-42/43 m 2732 164 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 164 2568.0 30-Dec-21 2568
(JV)
Paras-POSVL 1218 (Except
13 T-44/45 m 1483 265 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 265 1218.0 Completed 1
(JV) Transition)
Paras-POSVL 562 (Except
14 T-46 m 654 192 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 92 562.0 Completed
(JV) Transition)
Paras-POSVL
15 T-47 m 2230 377 0.0 63.0 0.0 63.0 0.0 59.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 59.0 0.0 0.0 0.0 0.0 244.0 133 2097.0 15-Sep-22 1 2097
(JV)
KRCL Paras-POSVL (JV) 21202 5468 0 181 58 121 58 177 0 115 0 58 58 58 0 58 115 58 100 58 59 115 0 0 58 1499 3969 17234

16 T-15 Rahee m 9765 9699 0.0 0.0 0.0 0.0 72.0 0.0 0.0 0 0.0 64.0 0.0 72.0 0.0 0.0 64.0 0.0 72.0 64 0.0 72 72 0 0 552.0 9147 618.0 26-Dec-22 2

17 T-48 IRCON Rahee m 10186 8167 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 72.0 0 0.0 0.0 65.0 0.0 0.0 137.0 8030 2156.0 10-Sep-22 1 2019

18 T-49 A Rahee m 5100 4099 0.0 0.0 72.0 0.0 0.0 72.0 0.0 72.0 0.0 0.0 72.0 72.0 0.0 0.0 72.0 0.0 0.0 0 72.0 0.0 0.0 72.0 72.0 648.0 3451 1649.0 5-Dec-22 2

IRCON RAHEE 25051 21965 0 0 72 0 72 72 0 72 0 64 72 144 0 0 136 0 144 64 72 72 137 72 72 1337 20628 4423

PPMPPL-
19 T-50 m 570 15 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15 555.0 10-Jul-22
AVADH
1
PPMPPL-
20 Arpinchala Yard m 1070 482 0.0 0.0 0.0 0.0 36.0 0.0 24.0 0.0 0.0 24.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 84.0 398 672.0 10-Jul-22
AVADH
PPMPPL-
21 T-74R IRCON m 8600 1891 0.0 0.0 45.0 45.0 0.0 0.0 0.0 90.0 0.0 0.0 0.0 0.0 90.0 0.0 0.0 0.0 0.0 30.0 60.0 0.0 0.0 0.0 0.0 360.0 1531 7069.0 20-Jun-22 1
AVADH
PPMPPL-
22 T-144 A/B/C/D m 750 10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 10 740.0 Completed
AVADH
PPMPPL-
23 Open Space m 200 106 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 106 94.0 Completed
AVADH
IRCON PPMPPL-AVADH 11190 2504 0 0 45 45 36 0 24 90 0 24 0 0 90 0 0 0 0 30 60 0 0 0 0 444 2060 9130

Total KRCL m 32558.0 12990.5 12.0 180.5 196.5 156.5 208.5 244.5 70.0 115.0 36.0 207.5 122.5 165.5 0.0 131.5 189.0 93.5 253.0 127.5 131.0 232.0 72.0 72.0 57.5 3074.0 9916.5 22641.5
Total IRCON m 36241.0 24469.0 0.0 0.0 117.0 45.0 108.0 72.0 24.0 162.0 0.0 88.0 72.0 144.0 90.0 0.0 136.0 0.0 144.0 94.0 132.0 72.0 137.0 72.0 72.0 1781.0 22688.0 13553.0
Grand Total m 68799.0 37459.5 12.0 180.5 313.5 201.5 316.5 316.5 94.0 277.0 36.0 295.5 194.5 309.5 90.0 131.5 325.0 93.5 397.0 221.5 263.0 304.0 209.0 144.0 129.5 4855.0 32604.5 36194.5