Professional Documents
Culture Documents
3-1
FUEL SYSTEM
3-2
SST LIST
Illustration Part No. Part Name
09268-76007-71
Injection measuring tool set
(09268-41047)
09842-76001-71
EFI inspection wire
(09842-30070)
09813-26600-71 Gauge
09814-22000-71 Tool
09815-22000-71 Tool
09817-23600-71 Union
09819-22000-71 Gauge
09819-23600-71 Gauge
3-3
23627-22000-71 Spring
3-4
THROTTLE BODY
COMPONENTS
2103
2103-095
27
02A
GT
02
JV
27A
GT
1302-091
KZ
BV
03
KZ
1104
2103-093
28
02A
02
JV
28A
1302-091
JV
BV
1FS RM.book 5 ページ 2013年9月27日 金曜日 午後12時41分
3-5
1302
2103-094
27
02A
GT
02
JV
27A
GT
1302-091
KZ
BV
03
KZ 1302
2103-098
1701-BY
1302-091
KX
KV
75
KO
1FS RM.book 6 ページ 2013年9月27日 金曜日 午後12時41分
3-6
T = 12 to 16
T = 7 to 11
3-7
Point operation
[Point 1]
Throttle Inspection:
shaft Inspect the throttle body.
Clearance 1. Check the throttle shaft for backlash.
2. Push the throttle valve hard with a finger to open/close.
3. While the throttle valve is free, an appropriate angle to the air
horn and a clearance should be maintained.
[Reference] Throttle angle around 16°
Inspection:
Inspect the throttle motor.
Measure the resistance between terminals.
Standard: Between M(+) and M(-): 0.3 to 100 Ω
M(-) M(+)
1FS RM.book 8 ページ 2013年9月27日 金曜日 午後12時41分
3-8
GASOLINE INJECTOR
COMPONENTS
1701
54
11 BV AL
54
54
BL
BQ
54
AV
AV
AH
AG AH BQ
AH AG
24
AH
2302-02
2302-AQ
23
AH
AH
AG
2101-064
1FS RM.book 9 ページ 2013年9月27日 金曜日 午後12時41分
3-9
T = 17 to 25
Note:
Use new gaskets and O-rings for assembling.
1FS RM.book 10 ページ 2013年9月27日 金曜日 午後12時41分
3-10
Point operation
O-ring
[Point 1]
Inspection:
Inspect the injector for injection amount and leakage.
1. With the O-ring and grommet attached to the injector, install
SST as shown in the left figure and connect the fuel filter on
Grommet
the vehicle and pressure regulator.
SST SST 09268-76007-71
(09268-41047)
WARNING:
• Use a cloth or the like to prevent splashing of fuel.
• Keep the working area away from fire.
2. Disconnect the connector of C/OPN RLY in the ECU box.
3. Make the terminal 1 and 2 in the disconnected relay block
Terminal 2 short-circuited.
Terminal 1
C/OPN RLY
3-11
[Point 2]
Intake manifold
Insulator Installation:
Attach the insulators to the intake manifold.
[Point 3]
Installation:
Coat the O-ring with gasoline and insert the injector into the
delivery pipe until it is fully seated.
Note:
• Turn the injector to both sides to insert it securely into the
delivery pipe.
• Make all the four injector connectors face upward.
O-ring • After installation, check that the injector turns smoothly.
[Point 4]
FR Installation:
Install the pressure regulator to the delivery pipe in the direction
shown in the figure.
Note:
Install the pressure regulator by hand, correct the direction
and then fix it by tightening the nut.
30°
1FS RM.book 12 ページ 2013年9月27日 金曜日 午後12時41分
3-12
3-13
LPG ADAPTER
INSPECTION
Inspect the air-fuel ratio control motor (FCM).
1. Start up the engine.
2. Place a sound scope on FCM.
3. Check the FCM operating sound.
Standard: Ticking sound is produced for a few seconds.
4. Remove FCM.
Note:
Do not disconnect the connector.
5. Cover the surface that contacts the adapter with masking tape
to prevent air leakage.
A 6. Measure the length of A while the engine is stopped or idling.
Standard:
Engine stop: 3.3 to 4.3 mm (0.13 to 0.17 in.)
Engine idle: 5.9 to 6.9 mm (0.23 to 0.27 in.)
(pneumatic model)
5.7 to 6.7 mm (0.22 to 0.26 in.)
(cushion model)
Caution:
Do not apply an excessive force to the needle valve.
7. Disconnect the connector from FCM.
8. Measure resistance between FCM connector terminals.
Standard:
Measurement terminals Resistance
3 2 1 15 to 25 Ω (when cool)
2 to 1, 2 to 3
20 to 30 Ω (when warm)
6 5 4 15 to 25 Ω (when cool)
5 to 4, 5 to 6
20 to 30 Ω (when warm)
Note:
When cool:
FCM surface temperature: -10 to 50 °C (14 to 122 °F)
When warm:
FCM surface temperature: 50 to 100 °C (122 to 212 °F)
9. Inspect the FCM operation.
(1) Apply a battery positive voltage to the terminal 2 and a
negative voltage to the terminals 1, 3, 4 and 6 in this
order.
(2) Check the needle valve behavior.
Standard: The needle valve gradually moves to the
close side.
(3) Apply a battery positive voltage to the terminal 5 and a
negative voltage to the terminals 1, 3, 4 and 6 in this
order.
Close (4) Check the movement of the needle valve.
Standard: The needle valve gradually moves to the
close side.
Caution:
Do not apply an excessive force to the needle valve.
Open
1FS RM.book 14 ページ 2013年9月27日 金曜日 午後12時41分
3-14
LPG INJECTOR
INSPECTION
1. Place a sound scope on the LPG injector.
2. Check the injector operating sound while the engine cranks.
Standard: The injector produces operating sound.
<Reference>
The fuel is injected twice per engine rotation during cranking.
3. Start up the engine.
4. Hold the injector hose gently with your fingertips to check the
pulsation.
Standard: Pulsation occurs continuously.
5. Check the idling status of the engine when the injector
connector is disconnected.
Standard: The idle speed decreases when the connector
is disconnected.
6. Inspect the air tightness of LPG injector.
(1) Disconnect the LPG injector connector and then remove
the injector with the hose attached.
Note:
Do not disconnect the injector hose.
(2) Turn the ignition key switch ON and OFF to check for LPG
leakage.
Standard: No LPG leak occurs.
2 1
3-15
LPG REGULATOR
GENERAL
1FS RM.book 16 ページ 2013年9月27日 金曜日 午後12時41分
3-16
COMPONENTS
2314
01
CO
01K=(INCL. )
30L 30M
AF
BA AH
AZ
30 AT BE
AX BF
EA
DF
AV BA
30M
BL
AC BK
BB
AP
BL
BK
45
22
CO
DZ
DL 49A
24
49
30M AP
AY
21
AL
2314-068
1FS RM.book 17 ページ 2013年9月27日 金曜日 午後12時41分
3-17
3-18
Inspection 1
SST(3) 1. Remove the idling speed adjusting screw and then
install the SSTs.
SST(2) SST 80339-76026-71...(1)
SST 09817-23600-71...(2)
SST(1)
SST 09820-23600-71...(3)
Union tightening torque:
T = 0.2 to 0.3 N·m [0.14 to 0.19 ft·lbf]
2. Apply compressed air at 400 kPa [57 psi] through
the IN port and maintain the air pressure.
Compressed air
Caution:
Don't apply compressed air more than 780 kPa [110
psi].
3. Check that the gauge indicates 0.
0 NG More than 0
OK
Inspection 2
1. Apply 12 V to the slow solenoid valve.
2. Check that the gauge points a value within the
range of 24.5 to 34.3 kPa [3.6 to 5.0 psi].
Compressed air
12V
3-19
From From
NG1 NG2
Inspection 3
1. While keeping the condition for the inspection 2,
stop supplying compressed air.
2. Read the gauge value.
12V
Go to Inspection 5
Inspection 4
1. While keeping the condition for the inspection 2,
stop supplying compressed air.
2. Exhale into the inner vent port and read the gauge
value.
Air
3-20
From inspection 3
NG
Inspection 5
C Apply soapy water to the A - F areas and then check for
gas leakage while keeping the condition for the
inspection 2.
Compressed air E
D 12V
A
Air leaks from B: Retighten each part and check again. (Re-install the union A
Idling speed adjusting screw O-ring defect at the intake port since liquid packing is applied to it.)
Air leaks from F:
Regulator body defect OK No air leakage. NG Air leaks from D.
3-21
T = N·m
T = 3.5 to 4.4
6
2
T = 3.5 to 4.4
T = 3.5 to 4.4
T = 3.5 to 4.4
3 T = 3.5 to 4.4
5
Disassembly procedure
1 Remove the secondary regulator cover and secondary diaphragm. [Point 1]
2 Remove the secondary valve ASSY. [Point 2]
3 Remove the primary regulator cover, primary diaphragm, and spring. [Point 3]
4 Remove the primary valve ASSY. [Point 4]
5 Remove the slow solenoid valve.
6 Remove the idling speed adjusting screw and O-ring. [Point 5]
Reassembly procedure
The installation procedure is the reverse of the removal procedure.
1FS RM.book 22 ページ 2013年9月27日 金曜日 午後12時41分
3-22
Point operation
4 [Point 1]
2 Reassembly:
Install the diaphragm.
1. Align the pin of the diaphragm with the dent on the secondary
valve lever.
1 2. Tighten the screws in the order shown in the figure.
3 Tightening torque:
T = 3.5 to 4.4 N·m
Pin Dent
[Point 2]
Dent on lever
Reassembly:
Install the spring while supporting the lever by hand to prevent it
from moving off the dent on the lever. Be careful not to push the
Spring valve seat against the housing during work.
Seat
Reassembly:
Spring washer
Follow the procedure below to replace the secondary valve with
Snap ring new one.
1. Insert the seat.
2. Install the spring washer.
3. Install the snap ring.
4. Check the valve for air tightness. (See page 3-25)
5. Apply adhesive (Castle Super Cement) to the snap ring and
spring washer. Be careful not to apply adhesive to the valve
seat.
Seat
Inspection:
B
SST Check the secondary valve lever height.
1. Check that SST touches the lever when the A side of SST is
A passed on the lever.
2. Check that SST does not touch the lever when the B side of
SST is passed on the lever.
SST 09819-23600-71
3-23
[Point 3]
7
1 Disassembly:
Since each part is subjected to the reaction force of the spring,
3 remove the bolts slowly by loosening them evenly in several steps.
5
Tightening torque:
T = 3.5 to 4.4 N·m
Reassembly:
4 Tighten the bolts evenly in several steps to prevent the spring from
6 coming off. As a last step, tighten them in the order shown in the
2 left figure.
[Point 4]
Disassembly:
Disassemble the primary valve ASSY.
1. Remove the primary valve ASSY.
2. Disassemble the primary valve.
Reassembly:
Reassemble the primary valve ASSY.
1. Reassemble the primary valve ASSY.
Note:
Replace the O-ring with a new one.
2. Install the primary valve ASSY.
Tightening torque:
T = 3.5 to 4.4 N·m
O-ring
3-24
SST(1)
[Point 5]
Reassembly:
Idling speed
adjusting Install the idling speed adjusting screw.
screw 1. Install the idling speed adjusting screw temporarily at the
following height.
Temporary installation height: 6.2 mm (0.2441 in.)
(0.25 in)
6.2 mm
3-25
3-26
VF Voltage Check
1. If the VF voltage does not fall within the standard range, adjust
Idling speed it by slowly turning the idling speed adjusting screw.
adjusting Standard: 2.5 ± 1.25 V
screw Reference:
VF
Condition Measures
voltage
Turn the screw
0V Air fuel ratio: RICH
CLOCKWISE
Turn the screw
5V Air fuel ratio: LEAN
COUNTERCLOCKWISE
2. After racing the engine several times, check that the VF
voltage is within the specified range.
Note:
If the VF voltage dose not falll within the standard range,
disconnect the for mone than 60 second and then
connect it again/
1FS RM.book 27 ページ 2013年9月27日 金曜日 午後12時41分
3-27
INSPECTION
1. Check that the operating sound is heard when applying 12 V to
the main solenoid.
Standard: Operating sound is heard
2. Measure resistance of the main solenoid
Standard: 8.0 to 9.0 Ω (at 20 °C (68 °F))
12V
LPG PROPERTY
Name LPG
Normal Gasoline
Item Propane Propylene Isobutane
butane
Molecular formula C 3 H8 C 3 H6 C4H10 C4H10 C8H18
-42.07 -47.70 -0.50 -11.73 128
Boiling point °C(°F)
(-43.73) (-53.86) (31.10) (10.87) (262)
Steam kPa (kgf/cm2) 784 961 196 289
-
pressure 20 °C (68 °F) (8.0) (9.8) (2.0) (2.95)
15 °C
Water = 1 0.508 0.522 0.584 0.563 0.66 to 0.75
Specific (59 °F)
gravity 15 °C
Air = 1 1.548 1.453 2.071 2.067 -
(59 °F)
481 458 441 544 210 to 300
Ignition temperature °C(°F)
(898) (856) (826) (1011) (410 to 572)
Heat generation kcal / kg 12.034 11.692 11.832 11.797 11.200
Flammable range % in air 2.37 to 9.50 2.00 to 11.10 1.86 to 8.41 1.80 to 8.44 1.5 to 4.7
Maximum flaming speed 0.81 1.01 0.825 1.825 0.83
m/sec, within a pipe
Air required for
kg / kg 15.71 14.80 15.49 15.49 14.70
complete combustion
Evaporative latent heat kcal / kg 101.8 104.6 92.09 87.56
1FS RM.book 28 ページ 2013年9月27日 金曜日 午後12時41分
3-28
C3H8 • C4H10
100% • 0%
90% • 10%
80% • 20%
70% • 30%
60% • 40%
50% • 50%
40% • 60%
30% • 70%
Pressure 20% • 80%
(kgf/cm2) 10% • 90%
0% • 100%
Temperature (°C)