Professional Documents
Culture Documents
KETERANGAN
REMARKS
P+650 P+650
35°
NO REVISI TGL PARAF
NU REVISION DATE SIGN
P+420 27 27 P+420
P+405
35
35
CONWOOD TOPPING
20
20
65 CONWOOD 65
P+385 P+385
10
14 14 14 14 14 14
30 27 P+365
PEMILIK
OWNER
90
POSISI
LAMPU LED
14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14
10
TOPPING
P+275
12 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14
15
15
P+260 17 17 30 27 P+260
PROYEK
TALI AIR PROJECT
0.5
0.5 0.5
0.5
0.5
TALI AIR
CONWOOD
ANDESIT 0.5
0.5 0.5
0.5
PROJECT
RUMAH TIPE 30/60
P+20 0.5 0.5 P+20
20
BATU ALAM TERAS DEPAN
JUDUL GAMBAR
P±0.00 -0.05
P±0.00
40
A D F H LUKMAN
ARSITEK TANGGAL
ARCHITECT DATE
10/08/2022
KETERANGAN
BATU ALAM
ANDESIT BAKAR