ij) C&W
ull SERVICES
CW Services (5) Pte Ltd
Reg No. 199805375C
Block 750A, Chal Chee Road
SR BizPark @ Chai Chee #05-01,
Singapore 469001
Telephone: +65 6876 0088
Facsimile: +65 6538 8146,
Our Ref: MHA/WCP/SCL/STEUIS/2022/APRIL/001
25" April 2022
ST Engineering Unmanned & Integrated Systems Pte Ltd
24 Ang Mo Kio, Street 65
Singapore 569061
Attention: Mr Ray Low, Manager
CONTRACT NO: MHA00004000005539
COMPREHENSIVE MAINTENANCE AND UPGRADING OF INTEGRATED SECURITY
SYSTEM FOR PROPERTIES UNDER THE MINISTRY OF HOME AFFAIRS
Re: SHOW CAUSE LETTER — FAILURE TO COMPLY WITH INSTRUCTIONS.
It has come to ICA’s attention that over the years, ST Engineering Unmanned &
Integrated Systems Pte Ltd (STEUIS) has removed 45 SAM cards from the access card
readers within ICA Woodlands Checkpoint and changing the firmware to allow the
access card readers to operate without the SAM card and without seeking official ICA
approval.
2 The removal of the SAM card has a serious breach on the security access within
Woodlands Checkpoint.
3 In accordance to Schedule IV of the Maintenance Contract
((MHA00004000005539)- Schedule of Deductions for Non-Compliance, Incomplete or
Poor Performance, Clause 1 “Without prejudice to all rights and remedies available to
the Authority or representative, the Contractor shall be liable for deductions in respect
of any breaches, failures, omissions or other acts specified therein and S/N 12 “Failure
to comply with instruction” - $1,000.00 per case. The amount of $45,000.00 will be
deducted from the next payable monthly payment
4 STEUISis to provide an explanation by 04 May 2022 on such failure. Otherwise,
deemed that STEUIS concedes to the non-compliance. You are also required to
furnish us on your immediate course of action to ensure the non-occurrence of such
failure.Yours sincerely,
le
Mr Jeffrey Lim
Area Manager
Copy to:
Ms Karen Goh
Tuas Checkpoint
501 Jalan Ahmad Ibrahim
Singapore 639937
Mdm Poh Bee Guat
Tuas Checkpoint
501 Jalan Ahmad Ibrahim
Singapore 63993
Page 20t7ACKNOWLEDGEMENT.
C & W Services (5) Ltd
c/o immigration & Checkpoints Authority
Woodlands Checkpoint
21 Woodlands Crossing
Singapore 738203
Fax: 6894 7650
Attn: Mr Jeffrey Lim
Area Manager
CONTRACT NO: MHA00004000005539
COMPREHENSIVE MAINTENANCE AND UPGRADING OF INTEGRATED SECURITY
SYSTEM FOR PROPERTIES UNDER THE MINISTRY OF HOME AFFAIRS
Re: SHOW CAUSE LETTER — FAILURE TO COMPLY WITH INSTRUCTIONS
Dear Sir,
! acknowledge the receipt of your letter Ref: MHA/WCP/SCL/STEUIS/2022/APRIL/001
dated 25" April 2022 and fully understand its contents.
Yours faithfully
Name & Signature Company Stamp
ST Engineering Unmanned & Integrated
Systems Pte Ltd
Date
Page3of7APPENDIX A
Page aot 7Caw
\
Il SERVICES
(CRW Services (5) Pte Ltd
Reg No. 199805375C
Block 750A, Chai Chee Road
SR BizPark @ Chai Chee #05-01,
Singapore 469003
Telephone: +65 6876 0088
Facsimile: +65 6538 8146
Our Ref: MHA/WCP/LDC/STEUIS/2022/APRIL/001
25th April 2022
ST Engineering Unmanned & Integrated Systems Pte Ltd
24 Ang Mo Kio, Street 65
Singapore 569061
Attention: Mr Ray Low, Manager
DEDUCTIONS CALCULATION — FAILURE TO COMPLY WITH INSTRUCTIONS
The calculation below is in relation to the failure to comply with instructions at
Woodlands Checkpoint, 21 Woodlands Crossing Singapore 738203 that was not
complied with, as per contract clauses, Schedule IV of the Maintenance Contract
(MHA00004000005539)- Schedule of Deductions for Non-Compliance, Incomplete or
Poor Performance, S/N 12 “Failure to comply with instruction”.
Attached are the following calculatior
Total SAM cards from the access card readers (per case
Total Deductions to be imposed = $1,000.00 x 45nos = $45,000.00
Please acknowledge receipt of this instruction by signing the attached letter.
Thank you.
Yours Faithfully,
Ux
Mr Jeffrey Lim
Area Manager
Page Sof 7Copy to:
Ms Karen Goh
Tuas Checkpoint
501 Jalan Ahmad Ibrahim
Singapore 639937
Mdm Poh Bee Guat
Tuas Checkpoint
501 Jalan Ahmad Ibrahim
Singapore 63993
Page Sof 7ACKNOWLEDGEMENT
C & W Services (S) Pte Ltd
c/o Immigration & Checkpoints Authority
Woodlands Checkpoint
21 Woodlands Crossing
Singapore 738203
Fax: 6894 7650
Attn: Mr Jeffrey Lim
Area Manager
CONTRACT NO: MHA00004000005539
COMPREHENSIVE MAINTENANCE AND UPGRADING OF INTEGRATED SECURITY
SYSTEM FOR PROPERTIES UNDER THE MINISTRY OF HOME AFFAIRS
Re: SHOW CAUSE LETTER — FAILURE TO COMPLY WITH INSTRUCTIONS.
Dear Sir,
‘acknowledge the receipt of your letter Ref: MHA/WCP/LDC/STEUIS/2022/APRIL/001
dated 25" April 2022 and fully understand its contents.
Yours faithfully
Name & Signature Company Stamp
ST Engineering Unmanned & Integrated
Systems Pte Ltd
Date
age 7 of 7DEDUCTIONS FOR NON-COMPLIANCE, INCOMPLETE OR POOR
PERFORMANCE
Notwithstanding the preceding clause, the Authority or his representative shall be
entitled to engage another contractor to rectify the breach, failure, omission or other
acts. All cost and expenses incurred (including any damages suffered) by the
Authority shall be recoverable from the Contractor.
If the contractor, after receiving an instruction from the Authority or his
representative, fails to comply with it in accordance with the Schedule of Response
and Down time
(a) the Authority or his representative may employ and pay other persons to do
whatever may be necessary to give effect thereto and may recover the amount of
any cost, loss, expense or damage incurred or suffered in connection therewith;
and
(b) the amount of any other loss or damage suffered or incurred by the Authority as
result of the contractor's default shall be recoverable from the contractor.
If by reason of any accident or failure or other event occurring to or in connection
with the Works, either during the execution of the Works or during the Warranty
Period, any remedial or other work shall in the opinion of the Authority or his
representative by urgently necessary and the contractor is unable or unwilling at once
to-do such remedial or other work, the Authority or his representative may authorize
the carrying out of such remedial or other work by a person other than the contractor.
If the remedial or other work so authorized by the Authority or his representative is
work which in the opinion of the Authority or his representative the contractor was
liable to do or for which he was otherwise responsible under the Contract, the amount
of any cost, loss, expense or damage incurred in carrying out the same shall be
recoverable by the Authority from the contractor.
‘The Contractor shall be given seven (7) days to explain why deductions should not be
imposed. If the explanation given is not acceptable to the Authority or his
representative, the Authority or his representative shall be entitled to impose the
deductions and recover from the Contractor.
DilDEDUCTIONS FOR NON-COMPLIANCE, INCOMPLETE OR POOR
SCHEDULE IV
PERFORMANCE
SIN_|Deseription Deductions Remarks
T,_ | Staff who fails to comply with house | $850.00 per ease.
rales.
2. | Failure to provide support for any | SS100 per case.
audits to be camied out by the
Authority/HTD User.
3. [Staff not in uniform and/or
identification passes.
‘$850.00 per case.
4 [Failure to attend an arranged
meeting at mutually agreed time.
‘$550 per case.
5S. | Failure to respond to requests, as
specified in Schedule of Response
and Down Time.
‘$850.00 per hour or any
part or unit thereof.
6. | Failure to submit monthly report on
the first week of every month.
$3850.00 per calendar day.
7. [Failure to complete the Services
within the stipulated time in the
Purchase Order.
0.1% of Purchase Order
amount per day.
Minimum of $850.00 per
Purchase Order per
calendar day.
& [Failure 0 comply with the
Specifications, Schedule of
Maintenance and achieve the desired
performance requirements or to
supply any labour, materials and
equipment to carry out the work.
‘$850.00 per calendar day.
Capped at maximum
851,500
9. | Failure to prepere the handing over
procedure and_—anecessary
documentations for the handing
‘over to the new contractor
‘55300 per case.
10. | Failure to submit SOP for work
process for approval within one (1)
month form the date of Letter of
Acceptance.
‘$350 per work process
IL. [Failure to provide adequate safety
measures and procedures when
carrying out works, failure to submit
risk assessment, safety programme,
etc.
'38300.00 per ease.
D2