Professional Documents
Culture Documents
the SDLC which forms the core of Wipro's Reviews and Testing Process is called the :
Peer Review
Verification and Validation Techniques
ETVX Model
All of the above
2) ________ techniques examine input and output of test data and derive test cases based
on an analysis of the input and output domains.
Flow/ Coverage - Based testing
System Based testing
Domain-Based testing
None of the above
9) ________ is used to test operation of the software and input-output data to ensure that
the software is performing well.
Review Techniques
Verification
Software Testing
All of the above
13) __________ is used to test system data and examine system output.
Software Analysing
Software Review
Software Testing
Software Inspection
15) Which of the following is the most important criteria to start review of a work item.
Check for completeness of the work item to be reviewed (?)
Approved by the Project Manager
Sign off by the customer
Check whether estimations of review is available
16) ___________ stage ensures that review comments have been incorporated during
rework
Review
Rework
Causal Analysis
Follow up
17) A visual examination of a software product to detect and identify software anomalies
or defects including errors and deviations from standards is
Walkthrough
Inspection
Testing
None of the above
18) ________ helps analyze the required efforts for validating the acceptability of a
software product.
Test Case
Test Plan
Test Script
All of the above
19) Which of the following review types is used for building code or documents by
discussing with the members of the development team and improving the work item .
Table Review
Walk throughs
Inspection
Peer Review
20) __________ implies testing the system with the intent of confirming the readiness of
the product and customer acceptance of the product.
Load testing
System testing
Acceptance Testing
Integration testing
21) If the cost of fixing a defect in the requirements phase is 1, what is the relative cost
of fixing a defect in the Testing Phase
15-40
10
10 to 15
>100
22) Tools commonly used for causal analysis are
Pareto Analysis
Root cause analysis
Both (1) and (2)
None of the above
Section A: Multiple Choices 1) Which of the following are broad types of efficiency
techniques in testing :
Flow/ Coverage - Based testing
Domain Based testing
System Based testing
Both (a) and (b)
2) ______ provides a measure of the conditions which could ensure that a branch is
executed.
Condition coverage
Condition operand coverage
Decision coverage
Both (a) and (b)
3) __________ testing shall be carried out if there are multiple modules in the project.
Unit
Module/ Feature
Build
System
5) _____________ is a way of proving that your system does what is intended and also
meets all requirements.
Verification
Validation
Verification and Validation
None of the above
8) Which of the following review types is used for building code or documents by
discussing with the members of the development team and improving the work item .
Table Review
Walk throughs
Inspection
Peer Review
9) The purpose of _________ is to assure that the product or product components fulfill
their intended use when placed in their intented environment
Validation
Verification
User Acceptance Testing
Product Testing
19) Review is a formal evaluation technique in which software requirements, design and
code is examined in detail by groups of persons other than the author to detect
faults,violations of development standards and other problems. This definition of reviews
is by
SEI
IEEE
Roger Pressmen
None of the Above
22) Which of the following testing is recommended in order to keep company data and
resources secure from mistaken or accidental users, hackers, and other malevolent
attackers.
Safety testing
Security testing
Mutation testing
Both (a) and (b)
25) A ________ is an imitation of a unit, used in place of the real unit to facilitate
testing.
Test driver
Test bed
Test stub
Test build
____________________________________________________________--
4) Which of the following review types is used for building code or documents by
discussing with the members of the development team and improving the work item .
Table Review
Walk throughs
Inspection
Peer Review
5) _________ can be done with checklists, issues lists, walkthroughs, and inspection
meetings.
Verification
Validation
Inspection
Testing
10) _______ is used to determine whether other system software components such as
browsers utilities and competing software will conflict with the software being tested
Mutation Testing
Browser Testing
Real Time testing
Compatibility Testing
13) Verification and Validation utilizes ________ to analyse and check system
representations.
Review Techniques (?)
Validation Techniques
Testing Techniques
All of the above
16) Which of the following criteria serve as basis for taking decision to stop testing :
Stop testing when all test cases execute without producing any error
Stop testing when the specified test coverage is completed without finding errors
Stop testing when it becomes unproductive
All of the above
17) As the project moves from requirements stage to completion stage, the cost of fixing
defects .
Increases
Decreases
Remains the same
is unaffected by reviews
21) ________ techniques examine input and output of test data and derive test cases
based on an analysis of the input and output domains.
Flow/ Coverage - Based testing
System Based testing
Domain-Based testing
None of the above
24) __________ is used to test system data and examine system output.
Software Analysing
Software Review
Software Testing
Software Inspection
25) The purpose of _________ is to assure that the product or product components fulfill
their intended use when placed in their intented environment
Validation
Verification
User Acceptance Testing
Product Testing
Reviews and Testing
5) The basic building block of any activity in any phase of the SDLC which forms the
core of Wipro's Reviews and Testing Process is called the :
Peer Review
Verification and Validation Techniques
ETVX Model
All of the above
6) The ___________ based testing is a systematic, statistical way of testing the software.
Orthogonal Array
User interface
Functionality
None of the above
7) ________ is a method for determining if a set of test data or test cases is useful.
Automated testing
Mutation testing
Module testing
Functional testing
10) ______ demonstrates satisfactory suitability for use in the intended operating
environment.
Inspection
Verification
Validation
Review
12) ________ involves checking that each feature specified in the component design has
been implemented in the component.
Unit testing
Integration testing
Interface testing
System testing
13) JTest, Jprobe, Purify are some of the __________ used in projects.
Verification tools
Testing tools
Validation tools
All of the above
14) ________ involves testing two or more modules together with the intent of finding
defects between the modules.
Unit testing
Integration or interface testing
System testing
Feature testing
16) ________ techniques examine input and output of test data and derive test cases
based on an analysis of the input and output domains.
Flow/ Coverage - Based testing
System Based testing
Domain-Based testing
None of the above
18) A ____ provides a framework for setting the input parameters, executing the unit and
reading the output parameter.
Test bed
Test driver
Test stub
All of the above
22) _________ determines how well a product performs when a load is placed on the
system resources that nears and then exceeds the system capacity.
Stress testing
Capacity testing
Load testing
Compatibility Testing
23) A group of test scripts which when taken together test all functions of an entire
system is called the __________.
Test Suite
Test Bed
Test Product
All of the above
7) ________ involves testing two or more modules together with the intent of finding
defects between the modules.
Unit testing
Integration or interface testing
System testing
Feature testing
8) A ____ provides a framework for setting the input parameters, executing the unit and
reading the output parameter.
Test bed
Test driver
Test stub
All of the above
9) Sometimes a need may arise for an external review of the software product. Which of
the following needs will prompt you to go for an ERT?
Domain Content
Technical Content
Cosmetic Content
All of the above
11) Which of the following are broad types of efficiency techniques in testing :
Flow/ Coverage - Based testing
Domain Based testing
System Based testing
Both (a) and (b)
13) Table review process is followed mostly for reviewing documents. What is the other
name of Table Review Process?
PEST Analysis
Brainstorming
Fagan's Review Process
SWOT Analysis
15) Which of the following are Code Complexity measures used as basis for testing :
McCabe measures
Halstead measures
Combination measures
All of the above
16) __________ is a formal evaluation technique in which software requirements,
design, or code are examined to detect faults.
System Testing (?)
Validation
Review
All of the above
17) ______ demonstrates satisfactory suitability for use in the intended operating
environment.
Inspection
Verification
Validation
Review
19) _________ is a document that defines the input, action and the corresponding
expected output, to determine if a certain feature of an application is working correctly.
Test Plan
Test Script
Test Case
Test Bed
20) ________ determines if a new software version is performing well enough to accept
it for a major testing effort.
Mutation testing
Load testing
Smoke testing
Release testing
21) ________ is a process of executing a program with the intent of finding errors.
Review
Testing
Peer review
Verification
software config
1) A set of patches applied to system releases like mainframe operating systems updates
is an example of model.
Check-in, Check-out
Composition
Long Transaction
Change set
7) If you have two sets of changes to a single file and you need to reflect both the
changes, the task to be performed is
Merging
Rollback
Branching
Labeling
9) In the composition model, the two step process of composition and selection can be
graphically visualized as ____________ graph
AND-NOR
AND-XOR
AND-OR
XOR-AND
10) An aggregation of CI(s) that has been formally reviewed and agreed upon and taken
into control at single point in time can be defined by……………. and using and SCM
tool it is identified by ……………. (Fill in the blank from respective comma separated
words)
Project, Pinning
Baseline, Label
Branch, Trigger
Keyword, Pinning
11) “SCM is the art of identifying, organizing and controlling modifications to the
software being built by programming team. It maximizes productivity by minimizing
mistakes.” It is SCM’s definition by:
SEI
IEEE
Roger Pressmen
Wayne Babich
13) In a project to identify the baseline artifacts which of the following techniques can be
adopted?
Keywords
Merging
Trigger
Labeling
15) Which of the following should be considered as Configuration Items for any project:
Project plan, Requirement specification, Class diagrams
Design specification, Design tools, Activity diagrams
Source Code, Test plan, test Script, Test tools, Test results
All of the above
16) Management issues that need be considered for SCM tool evaluation are
License Cost
After sales support
Availability of upgrades
All of the above
20) Which of the following needs to be taken into consideration for SCM tool selection
OS Support
Development Environment
Hardware Requirements
All of the above
22) Defining rights of individuals for accessing the project repository is defined at which
of the following stage of SCM:
SCM Planning
SCM Control
SCM status accounting
SCM Audit
23) _______represent the system structure and provide a list of components or groups in
a hierarchical structure.
Check-in, Check-out
Composition
System Model
Change set
software config
1) ______ are conducted to find and eliminate errors/defects in the early stages of
product development.
Reviews and Testing
Reviews
Validation
All of the above
3) A ______ is a document which describes the objective, scope , approach and focus of
a software testing effort
Test Strategy
Test Script
Test Case
Test Plan
8) Table review process is followed mostly for reviewing documents. What is the other
name of Table Review Process?
PEST Analysis
Brainstorming
Fagan's Review Process
SWOT Analysis
9) ___________ stage ensures that review comments have been incorporated during
rework
Review
Rework
Causal Analysis
Follow up
10) ________ helps analyze the required efforts for validating the acceptability of a
software product.
Test Case
Test Plan
Test Script
All of the above
11) If the cost of fixing a defect in the requirements phase is 1, what is the relative cost
of fixing a defect in the Testing Phase
15-40
10
10 to 15
>100
13) Mike Fagan of IBM published a paper in 1976, describing a method called
__________ which formalised the software review process.
Peer review
Online review
Pair review
Table review
14) ______ provides a measure of the conditions which could ensure that a branch is
executed.
Condition coverage
Condition operand coverage
Decision coverage
Both (a) and (b)
16) _____________ is a way of proving that your system does what is intended and also
meets all requirements.
Verification
Validation
Verification and Validation
None of the above
19) Which of the following are the commonly accepted levels of testing in the Software
Development Life Cycle ?
Unit or Component testing
Integration testing
System testing
All of the above
20) __________ refers to testing the features/ navigation/ expected expectations, when
more than one users from different machines operate on same Objects.
Concurrent testing
Functional testing
Module testing
All of the above
21) Sometimes a need may arise for an external review of the software product. Which
of the following needs will prompt you to go for an ERT?
Domain Content
Technical Content
Cosmetic Content
All of the above
22) __________ implies testing the system with the intent of confirming the readiness of
the product and customer acceptance of the product.
Load testing
System testing
Acceptance Testing
Integration testing
23) The basic building block of any activity in any phase of the SDLC which forms the
core of Wipro's Reviews and Testing Process is called the :
Peer Review
Verification and Validation Techniques
ETVX Model
All of the above
25) JTest, Jprobe, Purify are some of the __________ used in projects.
Verification tools
Testing tools
Validation tools
All of the above
vel q
3) All Configuration Audit issues are recorded in -------------- and tracked to closure:
Software Configuration Audit Report (SCAR)
Software Configuration Order Form (SCOF)
Baseline Record
PMR
4) The set of actions to be taken when the perceived risk becomes a reality is
documented as part of
Contingency plan
Mitigation Plan
Defect Prevention Report
Risk Tracker
8) Group that focus on the tools used by projects and the impact of using tools is
Tools group
SQA
SEPG
All of the above
10) Look ahead meetings and root cause analysis are examples of
Defect prevention activities
Error capture activities
Appraisal activities
None of the above
14) In the execution of maintenance projects each trigger from the customer is recorded
in a:
Change Request
MR
PMR
Change control Register
19) Each phase /activity of a life cycle model is represented in veloci-Q by the
____________ Criteria
WBS
DMADV
ETVX
SDLC
20) Process artifacts that help to perform project activities in a standard manner are
Policies
Procedures
Checklists and Templates
All of the above
21) The threshold value of Risk Score beyond which the Mitigation and contingency
plans need to be documented is
18
100
27
45
23) Six sigma methodology that is used for reduction of cycle time is
Cross Functional Process Map
DMAIC
DSSS
Six steps
vel q
1) Configuration audits are verification mechanisms used to ensure that deliverables are:
Defect free
On schedule
Consistent with requirements
None of the above
6) What is the monthly mechanism to record and track metrics of the project?
PDMR
Work Plans
PMR
ASR
7) For a project that involves resolving incidents, job cycle monitoring and software
upgrades, the process model to be chosen is
V-Process model
Iterative Process model
Production Support process model
None of the above
9) This is the testing procedure according to which modules, sub modules are tested and
test case verification is done
Functional testing
Module testing
Unit testing
System testing
12) ________ are mistakes / faults caught during the same phase of SDLC
Defects
Bugs
Errors
All of the above
13) You are a Project Engineer who has just joined Wipro. You want to know all your
responsibilities as defined by veloci-Q for your role. Where would you go?
PDB
Treasure House
Guidelines
Navigator
15) The process model suited for projects with dissimilar service requests is
Service Process model
Rational Unified Process Model
V-Process Model
None of the above
16) The process followed in the software development project should be:
Client specified processes
Processes as described in velociQ.
Tailored ODC specific processes
Any One of the above
21) Choose the odd one: One of the process models NOT suitable for Development
Iterative model
Waterfall Development model
V-Process model
Conversion/ Porting Process Model
25) The quality group responsible for process definition, metrics analysis and quality
assurance activities at vertical/group vertical level is
SEPG
SQA
Tools Group
None of the above