Professional Documents
Culture Documents
Highlights FY 93-94
• EP3 two-phase field activities began in late 1993 and are currently underway in Latin
America, Asia, and Africa.
• As ofJanuary 1995, the project had worked with more than 25 pro bono consultants in
approximately 15 missions.
• Since 1993, the EP3 central clearinghouse has compiled 1,000 in-house references and
responded to some 800 requests for information on industrial and urban pol/ution. EP3 is
also organizing local clearinghouses in participating countries.
• EP3 's diagnostic assessments have already
produced practical results; for example, water
conservation and annual savings of$/OO,OOO
thanks to a $1,500 process modification in a Project at a Glance
Chilean dyeing plant.
• EP3 's activities led to the development ofa new Funding: Life-of-Project $20,000,000
vehicle for sustainable energy production, the
Greenhouse Gas EmissionslEnvironmental
Projeet Duration: FY 1992-99
Pollution Prevention project.
• Training activities include afIVe-day trainer Implementors:
workshop in Washington, DC, a week-long U.S. Environmental Protection Agency
orientation for host-country clearinghouse
RCGlHagler, Bailly Inc.
employees, in-plant assessment strategies, and a
pollution prevention workshop for 62 project Water Environment Federation
volunteer candidates.
USAID Project Officer:
Jim Gallup I Washington, DC
Tel: 703-875-4518 Fax: 703-875-4384
out seven technical training sessions processing, metal finishing, and Gas EmissionslEnvironmental
and nine pollution prevention assess- metallurgy. The project will initially Pollution Prevention (GEEP) project.
ments in the following industrial work with Egyptian industry, associa- GEEP provides technical assistance
sectors: leather tanning, textile dyeing, tions, and research centers in the and institutional development for clean,
edible oil extraction, battery manufac- greater Cairo area and will provide renewable energy sources. USAIDI
ture, printing, hotels, and metal technical assistance, training, and India supports this project through
finishing. Project suggestions for information to local industries and parallel funding for the Global Envi-
processing changes at a battery plant urban enterprises. Project funding will ronment Facility.
will not only reduce production costs, also support demonstration activities
but also reduce pollution from lead dust for clean technologies in several Training. EP3 aims to increase local
inhalation and groundwater contamina- industrial sectors. Environmental capacity to address environmental
tion. Plant managers are presently assessment training began in November pollution and protection issues through
implementing these changes. 1994. seminars, train-the-trainer events, and
workshops. The project's industry
Chile. In November 1993, an EP3 Indonesia. EP3's initial activities in assessment component provides on-
team conducted diagnostic assessments Indonesia will begin in early 1995. The the-job training and increases local
at two leather tanneries and two textile project is working with the Environ- participation, thereby increasing project
dyeing plants in Santiago. Chilean mental Improvement Project to sustainability. Typically, an EP3
consultants who had cooperated with establish the Indonesia Clean Industri- assessment team includes a staff
the initial assessments then conducted al Production program. This program's member, a pollution prevention
16 more assessments in a variety of technology transfer and technical consultant, a pro bono consultant
industries, including textiles, slaughter- assistance will benefit Indonesian i (usually with industry-specific exper-
houses, tanning, paint manufacture, and industries and will help Indonesia's tise), and local consultants familiar
printing. In one tannery, a $5,000 Ministry of Environment to develop with the nature of area industries and
process modification is expected to and implement comprehensive policy their prevailing problems. These
save more than $60,000. In one of the and legislation supporting pollution consultants participate in facility
dyeing plants, a $1,500 modification prevention and clean technology. interventions from assessments through
will greatly reduce the volume of water follow-up phases. Over time, EP3 aims
used in the final washing-out process, Zambra. In September 1994, EP3 to build a network of local experts
saving about $100,000 annually. conducted pollution prevention whose continuing learning and commit-
assessments at a textile facility and a ment will form the cornerstone of
Ecuador. A kickoff meeting in nitrogen fertilizer plant in Zambia. The sustainable pollution prevention
November 1994, attended by more than project worked with USAID's Regional programs beyond the life of the EP3
120 representatives from government, Economic Development Services project.
industry, NGOs, and academia, Offices in Nairobi and used the In May 1994, the project put on a
officially launched Ecuador's EP3 assessments performed to provide five-day train-the-trainer workshop in
activities. Local engineers and U.S. technical assistance to the Zambia Washington, DC for pollution preven-
experts have conducted an assessment Privatization Agency. These activities tion trainers in developing countries.
at a leather tannery and plan to perform will establish the basis for integrating The workshop included sessions on
assessments at automobile assembly, pollution prevention into the Zambian types of pollution prevention measures,
tile, and fiberboard manufacturing privatization process. pollution assessments, data collection,
plants in early 1995. The project is and international pollution prevention
housed within Corporaci6n OIKOS, a India. In January 1994, EP3 helped resources. The 20 participants included
local NGO specifically organized to draft a strategic approach for environ- consultants, government representa-
provide environmental technical mental protection for India. This effort tives, and university professors from
assistance to Ecuadorian industries. to focus India's resources for maxi- Chile, Egypt, Ecuador, and Tunisia, as
mum environmental impact outlines a well as representatives from Argentina,
Egypt. EP3's Egypt office officially broad-based approach to pollution India, Zambia, the World Bank, and the
began its activities in October 1994 prevention. EP3's involvement ended United Nations. Participants developed
with fmancial support from USAID's with the completion ofthe strategy, but and practiced training programs for use
Energy Conservation and Environ- project assistance led to the develop- in their own countries. Follow-up
ment Project (ECEP). EP3 focuses on ment of a new vehicle for sustainable surveys will determine the course's
four priority industries: textiles, food energy production: the Greenhouse effectiveness.
In November 1994, EP3 held training session focused on the electro- 1994, the project conducted a work-
additional training programs, including plating and textile dyeing industries. shop on pollution prevention for 62
a week-long orientation for host- EP3 is also supporting or participat- project volunteer candidates at a
country clearinghouse employees. ing in a number of international conference held by the Water Environ-
Personnel from three of the fIrst EP3 conferences, congresses, and ment Federation.
clearinghouses attended. The project roundtables on environmental technol- -Stephanie Joyce, Datex
also began in-plant assessment training ogy transfer. For example, in October 2/13/95
for Egypt's EP3 staff. This two-week