REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS.
REGIONAL OFFICE No. IV-A
CAVITE 3RD DISTRICT ENGINEERING OFFICE
CARMONA, CAVITE
C.Y. 2022 PROJECT
DETAILED ENGINEERING DESIGN FOR
ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD
SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/
RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS -
BACOOR BLVD. - K0018 + 698 - K0016 + 223
ROAD SECTION: BACOOR BOULEVARD
LOCATION BACOOR CITY, CAVITE
STATION LIMITS: KOQ18 + 608 KO016 + 223
NETLENGTH :1,703:5m,
ROAD SECTION 1D : S0427217
saan DagonINDEX OF DRAWING
PAGE TITLE SETNO. | SHEET NO.
| FRONT PAGE A 1
INDEX OF DRAWING 8 2
LOCATION MAP, VICINITY MAP, KEY MAP (PHILIPPINE MAP) c 3
‘GENERAL NOTES, LEGENDS & ABBREVIATIONS Da |
GENERAL NOTES, LEGENDS & ABBREVIATIONS oa 5
‘SUMMARY OF QUANTITIES E 6
| SCHEDULE OF QUANTITIES Fa 7
‘SCHEDULE OF QUANTITIES oO Fa 8
TYPICAL ROADWAY SECTIONS. ot °
STRAIGHT LINE DIAGRAM - K0018+698.00 - KO018+920 Ha 10
STRAIGHT LINE DIAGRAM - K0018#920 - KO017+000, KO017+38%.00 -KOO17+520 He "
STRAIGHT LINE DIAGRAM - KO017#520 - K0017+760 He 2
‘STRAIGHT LINE DIAGRAM - 0174760 - K0016+000 He 8
STRAIGHT LINE DIAGRAM - K0016+000 -Ko016+223 Hs 4
STRAIGHT LINE DIAGRAM - KOO19 + 606.60 -KO019 + 840.00 He 6
STRAIGHT LINE DIAGRAM - KOO19 + 40,00 -Ko0t8 + 000.00 “7 16
‘STRAIGHT LINE DIAGRAM -K0021 + 462.00 - K0021 + 628.00 He 7
TRAFFIC MANAGEMENT PLAN 1 18
DPWH STANDARD FIELD OFFICE FOR THE ENGINEER 4 |
DPWH STANDARD PROJECT BILLBOARD K 20sa.sPEcicaTion
2.0 DIMENSIONS:
|L0 STATIONINGS ANO RADIUS OF HORIZONTAL CURVE
“49 HORIZONTAL CONTROL:
‘0 VERTICAL CONTROL
‘SOELEVATIONS AND GRADES:
"TBROAD CONNECTIONS AND PRIVATE ENTRANCES.
‘Lo DRANAGE STRUCTURES.
GENERAL NOTES
|S. REMOVAL OF EXISTING STRUCTURES AND RELOCATION
‘sa ROAD SIONS:
‘110 ACCESSIBLITY LAW:
{120 DESIGN DATA REFERENCES.
‘s0constRucTION
124, SPECIFICATION
‘113, REINFORCED CONCRETE
BAR BENDING, SPLICING, AND PLACING
‘4a roRria Coven CONCRETE PAVEMENT PC)
al
asi
=LEGEND:
ABBREVIATIONS:
sa
et
a= ee =
a z
ee =
AS ES S
Bo ES =
6 =
= —— :
“Tl Co
aa
Bt leelelel algSUMMARY OF QUANTITIES
‘QUANTITY
yTEM No. DESCRIPTION unit | Koote+e88.00-Kooteez23 REMARKS:
NET LENGTH = 1,703.50 Lm.
[PART [FACILITIES FOR THE ENGINEER
‘Ait @) [Consnucton of Field Ofia for he Engnesr 1s. 100 Seo Detaled Drawing:
‘A12(6) [Operation and Maitsrance of 4x2 Pek Up Type Sonice Vice or the Engineer | mos. 7200
‘4.14(1) [Provsion of Progress Photaraahs a 740.00
‘PART 6 [OTHER GENERAL REQUIREMENTS
5 [Project Biboa! Signboard 3.00 See Detaled Drawing:
'B.7()_ [Occupational Saety and Heal Progam — (ora
2.8 (1) [Tae Management W200. See Dataied Dang:
5.8 _[Nobizaton/Demobiizaion 4.00
PART C [EARTHWORKS
101(3)63 [Removal of Actual Sructures/OBstucton -POGP (Onreniorced), 0zamthek | sam. 1703500 See Schedule of Quanties-
302.2) |urpus Common Excavation cum, 4.50045. =
705( je |Subgrade Preparation - Comion HEIST sam. 7703500 “a
PART 0 |SUBBASE AND BASE COURSE,
200(3) [Aggregate Subbase Course cum. 3407.00 ~See Schedule of Quant and Detaled Dawgs
BART E [SURFACE COURSE
302 2) [Emulsifed Asonat sam, 724000 See Sehedile of Quaniites and Detaled rawngs-
310 (fs [Btuminous Concrete Surece Weating Course, Rot-Lad GO mm TK] sam. 7121000 =o
[310 2) a[Btuminows Concrete Sursce Bot Course, Ho-Lai (30 mm th sam, 7121000 =o
311(1)6 [Portand Cement Gonrete Pavemont (Uneriorced)-.30m Nick -3. days sqm. 77,035.00 — so
PART H [MISCELLANEOUS STRUCTURES,
16121) [Refectorzed Thermopisto Pavement Merkngs Whe sm 2.00 ieSCHEDULE OF QUANTITIESSCHEDULE OF QUANTITIESTYPICAL ROADWAY CROSS SECTION
x
pomp
cosmo asus crnorggn nan ni co0ny _—
‘cee Tm Pave a recess Nanas Sena sain
umn * ‘Sem case “eas
s
won
RecA sums URGE. THK
to
DETAIL AT SECTION "A"
EXISTING OF PAVEMENT EXISTING OF PAVEMENT EXISTING OF PAVEMENT aes
oo L
aaa SOTERA
anes
aes
See pes
‘THERMOPLASTIC PAVEMENT MARKING DETAILS.
DETAIL OF CENTER LINE, BROKEN LINES & EDGE LINESTRAIGHT LINE DIAGRAM
SCALE +200
i : : : d
g 8 g g g
‘BusTING PAVEMENT EXISTING PAVEMENT NISTING PAVEMENT EST NG PAVEMENT
ImoSSet pin GHEMAY | sROPSbeD ASAT Den | PROrOSconSDALY oveRATT moroech dati ovr
‘loa, er
rere ‘ane nee
yPROroveo ROAD REST OCEING 0-ioe THe ptea
z Tn Se SORE
E = :
a 3 3 gl a 8 gl
3 g g gl gl g E
ee Ben t =a ETS UE es
|
Drstme pave Baste PAVEMENT vsti PAVEMENT jusTn@ Pavenen exec PaveMENT rst PAVEMENT
PROPOSED asi OvERLaY.| PROPOSED ASeHALT oRLAY | PRGPOSEDASIMALT OVERLAY | PEOFOSEDASrHALT OVERLAY | PROSGSED ASPA.TGvERLAY
oral Sonn ae “am ha eomnae oe ea a
Pe Pe Eee Peer EEE Ce ee Eee Tee ee pe a
=a =e Saree aaa Sane ea
ited | leis |