You are on page 1of 19
REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS. REGIONAL OFFICE No. IV-A CAVITE 3RD DISTRICT ENGINEERING OFFICE CARMONA, CAVITE C.Y. 2022 PROJECT DETAILED ENGINEERING DESIGN FOR ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - BACOOR BLVD. - K0018 + 698 - K0016 + 223 ROAD SECTION: BACOOR BOULEVARD LOCATION BACOOR CITY, CAVITE STATION LIMITS: KOQ18 + 608 KO016 + 223 NETLENGTH :1,703:5m, ROAD SECTION 1D : S0427217 saan Dagon INDEX OF DRAWING PAGE TITLE SETNO. | SHEET NO. | FRONT PAGE A 1 INDEX OF DRAWING 8 2 LOCATION MAP, VICINITY MAP, KEY MAP (PHILIPPINE MAP) c 3 ‘GENERAL NOTES, LEGENDS & ABBREVIATIONS Da | GENERAL NOTES, LEGENDS & ABBREVIATIONS oa 5 ‘SUMMARY OF QUANTITIES E 6 | SCHEDULE OF QUANTITIES Fa 7 ‘SCHEDULE OF QUANTITIES oO Fa 8 TYPICAL ROADWAY SECTIONS. ot ° STRAIGHT LINE DIAGRAM - K0018+698.00 - KO018+920 Ha 10 STRAIGHT LINE DIAGRAM - K0018#920 - KO017+000, KO017+38%.00 -KOO17+520 He " STRAIGHT LINE DIAGRAM - KO017#520 - K0017+760 He 2 ‘STRAIGHT LINE DIAGRAM - 0174760 - K0016+000 He 8 STRAIGHT LINE DIAGRAM - K0016+000 -Ko016+223 Hs 4 STRAIGHT LINE DIAGRAM - KOO19 + 606.60 -KO019 + 840.00 He 6 STRAIGHT LINE DIAGRAM - KOO19 + 40,00 -Ko0t8 + 000.00 “7 16 ‘STRAIGHT LINE DIAGRAM -K0021 + 462.00 - K0021 + 628.00 He 7 TRAFFIC MANAGEMENT PLAN 1 18 DPWH STANDARD FIELD OFFICE FOR THE ENGINEER 4 | DPWH STANDARD PROJECT BILLBOARD K 20 sa.sPEcicaTion 2.0 DIMENSIONS: |L0 STATIONINGS ANO RADIUS OF HORIZONTAL CURVE “49 HORIZONTAL CONTROL: ‘0 VERTICAL CONTROL ‘SOELEVATIONS AND GRADES: "TBROAD CONNECTIONS AND PRIVATE ENTRANCES. ‘Lo DRANAGE STRUCTURES. GENERAL NOTES |S. REMOVAL OF EXISTING STRUCTURES AND RELOCATION ‘sa ROAD SIONS: ‘110 ACCESSIBLITY LAW: {120 DESIGN DATA REFERENCES. ‘s0constRucTION 124, SPECIFICATION ‘113, REINFORCED CONCRETE BAR BENDING, SPLICING, AND PLACING ‘4a roRria Coven CONCRETE PAVEMENT PC) al asi = LEGEND: ABBREVIATIONS: sa et a= ee = a z ee = AS ES S Bo ES = 6 = = —— : “Tl Co aa Bt leelelel alg SUMMARY OF QUANTITIES ‘QUANTITY yTEM No. DESCRIPTION unit | Koote+e88.00-Kooteez23 REMARKS: NET LENGTH = 1,703.50 Lm. [PART [FACILITIES FOR THE ENGINEER ‘Ait @) [Consnucton of Field Ofia for he Engnesr 1s. 100 Seo Detaled Drawing: ‘A12(6) [Operation and Maitsrance of 4x2 Pek Up Type Sonice Vice or the Engineer | mos. 7200 ‘4.14(1) [Provsion of Progress Photaraahs a 740.00 ‘PART 6 [OTHER GENERAL REQUIREMENTS 5 [Project Biboa! Signboard 3.00 See Detaled Drawing: 'B.7()_ [Occupational Saety and Heal Progam — (ora 2.8 (1) [Tae Management W200. See Dataied Dang: 5.8 _[Nobizaton/Demobiizaion 4.00 PART C [EARTHWORKS 101(3)63 [Removal of Actual Sructures/OBstucton -POGP (Onreniorced), 0zamthek | sam. 1703500 See Schedule of Quanties- 302.2) |urpus Common Excavation cum, 4.50045. = 705( je |Subgrade Preparation - Comion HEIST sam. 7703500 “a PART 0 |SUBBASE AND BASE COURSE, 200(3) [Aggregate Subbase Course cum. 3407.00 ~See Schedule of Quant and Detaled Dawgs BART E [SURFACE COURSE 302 2) [Emulsifed Asonat sam, 724000 See Sehedile of Quaniites and Detaled rawngs- 310 (fs [Btuminous Concrete Surece Weating Course, Rot-Lad GO mm TK] sam. 7121000 =o [310 2) a[Btuminows Concrete Sursce Bot Course, Ho-Lai (30 mm th sam, 7121000 =o 311(1)6 [Portand Cement Gonrete Pavemont (Uneriorced)-.30m Nick -3. days sqm. 77,035.00 — so PART H [MISCELLANEOUS STRUCTURES, 16121) [Refectorzed Thermopisto Pavement Merkngs Whe sm 2.00 ie SCHEDULE OF QUANTITIES SCHEDULE OF QUANTITIES TYPICAL ROADWAY CROSS SECTION x pomp cosmo asus crnorggn nan ni co0ny _— ‘cee Tm Pave a recess Nanas Sena sain umn * ‘Sem case “eas s won RecA sums URGE. THK to DETAIL AT SECTION "A" EXISTING OF PAVEMENT EXISTING OF PAVEMENT EXISTING OF PAVEMENT aes oo L aaa SOTERA anes aes See pes ‘THERMOPLASTIC PAVEMENT MARKING DETAILS. DETAIL OF CENTER LINE, BROKEN LINES & EDGE LINE STRAIGHT LINE DIAGRAM SCALE +200 i : : : d g 8 g g g ‘BusTING PAVEMENT EXISTING PAVEMENT NISTING PAVEMENT EST NG PAVEMENT ImoSSet pin GHEMAY | sROPSbeD ASAT Den | PROrOSconSDALY oveRATT moroech dati ovr ‘loa, er rere ‘ane nee yPROroveo ROAD REST OCEING 0-ioe THe ptea z Tn Se SORE E = : a 3 3 gl a 8 gl 3 g g gl gl g E ee Ben t =a ETS UE es | Drstme pave Baste PAVEMENT vsti PAVEMENT jusTn@ Pavenen exec PaveMENT rst PAVEMENT PROPOSED asi OvERLaY.| PROPOSED ASeHALT oRLAY | PRGPOSEDASIMALT OVERLAY | PEOFOSEDASrHALT OVERLAY | PROSGSED ASPA.TGvERLAY oral Sonn ae “am ha eomnae oe ea a Pe Pe Eee Peer EEE Ce ee Eee Tee ee pe a =a =e Saree aaa Sane ea ited | leis |

You might also like