You are on page 1of 3

Anti-Dumping measures Subsidies and Countervailing Safeguard Measures

measures
Legislations RA 8752 RA 8751 RA 8800
Section 711 Section 713 Section 712
JAO No.1 s.2000 JAO No.2 s.2000 TC order No. 00-02
TC order No. 00-01 JAO No.3 s.2000
GATT ART. VI GATT ART. XVI GATT ART.XIX
WTO Agreement on Agriculture
Nature of Measure Address UNFAIR TRADE practices Address FAIR TRADE practices
EP>NV Subsidized production or exportation of the EP at the level of NV
foreign merchandise General Safeguard (import surge)
Special Safeguard (< base trigger level or falls
below trigger price level)
Objectives To protect and provide remedies to the To protect and provide remedies to the General Safeguard- remove serious injuries;
domestic industry against unfair trade domestic industry against subsidization structural adjustments to gain competitiveness
practice Special Safeguard- assist local farmers who
were affected by QR
Scope and Coverage Limited to like products ALL like or DIRECTLY competitive products
Country and exporter specific ALL countries exporting like or DIRECTLY
competitive products
Chapters 1-24 (Agri) General Safeguard- AGRI or Industrial
Chapters 25-97 (Industrial) Special Safeguard - (SSG applicable only)
Minimum Threshold of *MORE THAN 50% of the total production of the like products expressing their support or General Safeguard- producer of like or directly
Support for APPLICATION opposition competitive products; major proportion of the
**NO INVESTIGATION shall be initiated the support it get accounts for LESS THAN 25% total production
of the production of the like products produced by the domestic industry Special Safeguard – DA (on its own motion)
ELEMENTS Like Product Like Product General Safeguard
Price Difference/Dumping margin Subsidy Like Product or directly competitive products
Material Injury Material Injury Increased Imports
Causal Link Causal Link Serious Injury
Causality
Special Safeguard
Like Product
Imports exceeds base trigger level or falls
below trigger price level
Forms of MEASURE and Provisional Measure- *affirmative Provisional Measure- *affirmative preliminary General Safeguard
Duration preliminary determination (provisional determination (cash deposit or bond) 4 Provisional Measure (Tariff increase if not QR
duty or cash bond) 4-6 months months no sooner 60 days may apply) not exceed 200 days
Definitive Anti-Dumping Duty not more Definitive Countervailing Duty 5 years from Definitive Measure (Flexible Tariff Clause,
than 5 years from date of imposition date of imposition MAV, trade adjustment assistance) 4-8 years;
10 years for developing countries
Special Safeguard
Definitive Special Safeguard Measure-(Volume
Test, Price Test) Shall only be effect UNTIL
THE END OF THE YEAR it was imposed
Stages of INVESTIGATION
Prima Facie Determination DA or DTI-BIS DA or DTI-BIS DA or DTI-BIS
5 WORKING days 10 days from the receipt of the properly 5 calendar days upon acceptance of properly
documented application documented application
**NO PRIMA FACIE-REJECTED
Preliminary Determination Notify parties concern Notify parties concern Notify parties concern
30 WORKING days from receipt of the 20 days from receipt of the answers TO 30 CALENDAR days from receipt of the
answers TO MAKE PRELIMINARY MAKE PRELIMINARY DETERMINATION answers TO MAKE PRELIMINARY
DETERMINATION *AFFIRMATIVE- issues DO imposition of DETERMINATION
*AFFIRMATIVE- issues DO imposition of provisional measure; submit to TC *AFFIRMATIVE- issues DO imposition of
provisional measure; submit to TC **NEGATIVE- Terminates Investigation provisional measure; submit to TC
**NEGATIVE- Terminates Investigation **NEGATIVE- Terminates Investigation
Final Determination TC; 120 days from receipt to COMPLETE INVESTIGATION; TC; 120 days from receipt to COMPLETE
submit reports to DA or DTI-BIS INVESTIGATION; 60 days if urgent
submit reports to DA or DTI-BIS
Issuance of Dept. Order (DO) Within 10 days from receipt of an Within 10 days from receipt of an DA or DTI-BIS
AFFIRMATIVE AFFIRMATIVE 15 CALENDAR days from receipt of the TC
*DA or DTI-BIS; issue DO for Definitive *DA or DTI-BIS; issue DO for Definitive *DA or DTI-BIS; issue DO for imposition of
Anti-Dumping Duty unless importer Countervailing Duty unless importer secures general safeguard measure; notify Committee
secures PRICE UNDERTAKING PRICE UNDERTAKING on Safeguards of WTO
** NEGATIVE- DA or DTI-BIS issue DO ** NEGATIVE- DA or DTI-BIS issue DO ---Notify WTO Committee on Agriculture in
through DOF SEC for BOC to release cash through DOF SEC for BOC to release cash case of Special Safeguard Measure
bond bond ** NEGATIVE- DA or DTI-BIS issue DO
=importer may file for an appeal wth CTA =importer may file for an appeal wth CTA through DOF SEC for BOC to release cash
bond and termination of case

REJECTION/TERMINATION of Margin of dumping LESS THAN 2% of Developed Country TERMINATION OF DEFINITIVE Measures
Investigation EXPORT PRICE Subsidy LESS THAN 1% advalorem of EP NO ADEQUATE REPORTS; Increased import
Injury is NEGLIGIBLE(LESS THAN 3% of Volume of imports is NEGLIGIBLE(LESS competition
IMPORTS --if collectively 7%) THAN 3% of IMPORTS --if collectively 7%) CHANGE ECONOMIC circumstances
Injury is NEGLIGIBLE At least 1 year upon expiration; domestic
Developing Country industry files a petition to modify, reduce or
Subsidy LESS THAN 2% advalorem of EP terminate imposed definitive measure
3% for least developed
Volume of imports is NEGLIGIBLE(LESS
THAN 4% of IMPORTS -- if collectively 9 %)
Injury is NEGLIGIBLE
REVIEWS Expiry or Sunset Review (to continue) Expiry or Sunset Review (to continue) TC shall monitor positive adjustments to
Interim Review (motu propio of DA or Interim Review (motu propio of DA or DTI- import competition
DTI-BIS) BIS) If the action exceeds 3 years or for an
New Shipper’s Review (for new exporters) extension submits reports to DA or DTI-BIS