Item BLOCK NO. Content VS
1 3 4 5 13

Planned
Tracker SCADA system
Actual
Opertation system, programme Planned
update, graphics and parameter Actual
Planned
Dubugging of first block
Actual
Planned
Communication Dubugging
Block 34 Actual
Planned
Block34 data connection
Actual
Planned
Data verification
Actual
Planned
Remote control test
Actual
Dubugging completion and Planned
acceptance of block34 Actual
Normal data access,data
Planned
communication BLOCK10-14 verification,remote control test
Actual
Normal BLOCK7,8,10 data access,data
Planned
communication ,11,12,13,14, verification,remote control test
BLOCK7,8,11 data verification,remote control t Actual
BLOCK16-
20,BLOCK23-
Normal
28,BLOCK41,BLO data access,Ping failure Planned
communication
CK42,BLOCK21-
22,
Ring2,ring3 no ping Actual
BLOCK16-
20,BLOCK23-
Normal
28,BLOCK41,BLO data access,data verification Planned
communication
CK42,BLOCK21-
22,
说明:1、BLOCK16,24,25的图
BLOCK19,20,BLO
和参数在制作中。
CK26- Actual
2、BLOCK17-18前面已经接入。
28,BLOCK41,42
3、BLOCK21-23没通。
Block29-
abnormal 40,BLOCK43- data access,data verification
Planned
communication 46,Block47-
54,BLOCK57-61
今天计划接入的BLOCK实际通信没通 Actual
,无法接入。
BLOCK16-
20,BLOCK23-
Normal data verification,remote control
28,BLOCK41,BLO Planned
communication test
CK42,BLOCK21-
22,
Actual
SCADATraining Tracker SCADA Tracker SCADA system Planned
Actual
Block29-
Abnormal 40,BLOCK43- data verification,remote control
Planned
communication 46,Block47- test
54,BLOCK57-61
Actual
Robot system,
Firewall Debugging of firewall Planned
main SCADA
Actual
GPS attenna and installation and commissiong of Planned
SCADATraining GPS attenna,SCADATraining Actual
Hand over Tracker SCADA Tracker SCADA system Planned
Actual
Tracker Scada Schedule
2022.11 2022.12

15 18 20 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Nation
al day
2022.12

16 17 18 19 20 21 22 23 24 25 26 27 28 29