Professional Documents
Culture Documents
JSA GC-3 Electric Welder-1
JSA GC-3 Electric Welder-1
Time: Revised
JSEA developed by
(participants)
Reviewed by:
Superintendent (Sign Name & Position): HSE Professional (Sign Name & Position):
H = High risk Immediate action required, activity must not start or be stopped if started. Highest level of Management needs to be involved.
M = Medium risk Monitoring controls are required. Management responsibility must be specified.
L = Low risk. Identify hazards and implement controls. Manage by routine processes. Ie inspections / observations