Base Maintenance Project – Flow Process – NRC Handling
Customer Service
Maintenance
Preliminary Defect
NO Deferred Stop
Customer Approval
(Verify By QC)
IF OVER CAPPING LIMIT
Quality Control
YES
Preliminary
A/C Preliminary
Start Defect Report VERIFY
Check
Create NRC
Form By Trax
IF BELOW
Found Finding During CAPPING LIMIT
Maintenance
Production
Start Perform NRC
Perform DMI/NSRDIL
Engineering
Production
Evaluation Of Create & Printed Instruction on NRC by
Applicable Manual For WITHIN MANUAL Trax
Repair Instruction
BEYOND MANUAL
Engineering
Create Engineering Product
SR To Manufacture
Store
Received NRC ( Pick up
Tools and Material *If PPC Collect Dirty
PPC
needed) Stop
Finger