You are on page 1of 2

MAALAB DESIGN & CONSTRUCTION :: December 5, 2022 ::

ST-1
MH TAP TO
AWS FUTURE PUBLIC
DRAINAGE

OWS
GRAVEL FILL
FOR FUTURE
EXPANSION

ST-2

INTERCEPTING CANAL

AL
G CAN
EPTIN
C
INTER
AREA AREA
DRAIN DRAIN
NOT FOR DEVELOPMENT

CANOPY ROOF LINE

MH TAP TO
FUTURE PUBLIC
DRAINAGE *
PREMIUM DIESEL
16KL 8KL

AGE
TANK FARM

RAIN
DIESEL
24KL

LIC D
) PUB
UNLEADED

URE
24KL

(FUT
AL
G CAN
EPTIN
C
INTER
AREA AREA AREA
DRAIN DRAIN DRAIN
FUTURE DRAINAGE ALONG COMMERCIAL BLDG. (PH. 2) MH TAP TO
FUTURE PUBLIC
DRAINAGE

PHASE 2 - NON FUEL BUSINESS (NFB)

SAN ROQUE SERVICE STATION


DRAINAGE FOR RAIN WATER
DRAINAGE FOR BLACKWATER
DRAINAGE FOR CONTAMINATED WATER
(WATER WITH PETROLEUM BASED PARTICLES)

* WHILE THERE IS NO READILY AVAILABLE PUBLIC DRAINAGE,


EXCESS DRAINAGE WATER FROM MH WILL BE SURFACE RUNOFF
GOING TO ROADSIDE

PROPOSED SITE DRAINAGE PLAN P


N T S 001

1
MAALAB DESIGN & CONSTRUCTION :: December 5, 2022 ::
AREA FOR DEVELOPMENT
FUTURE COLD STORAGE AREA +/- 1,825 SQ.M.
+/- 1,295 SQ.M.
m
+/- 49.10

PHASE 2 - NON FUEL BUSINESS (NFB)


+/- 575 SQ.M.

BOUNDARY WALL FIREWALL FOR COMMERCIAL BUILDING

+/- 75.42 m

SAN ROQUE SERVICE STATION


KEY PLAN A
N T S 004

You might also like