You are on page 1of 8
a QO ff PERTAMINA Pertamina Hulu Energi ONWJ SKKMIQAS ME Tove, 78. Simatpang Kew 80, Release Order for Services 3700041440 xeeued to 141144 PP. CATUR ELANG PERKASA peliver te skt_oFPICE BARATA JAYA TV NO.74 KT OFFICE SURABAYA 00000, Ju, TB, SINATUPANG KAY. 99 indonesia 12520 - SAKARTA SELATAN panke Account + -MDR-ID-JKT-4636-1270005196512 sales Person: ME Requestor ANDRIAS ATWOKO Phone No a Purchasing Group + 374-CNWJ-PROD MAINTNCE Fax No contract Ref, No + 4720002212 Quotation Ref No. currency 2 DR MATERIAL FOR INSTALLATION DUCTING OF HVAC FOXTROT Page 1 of 2 start Date 04 Feb 2020 Bad Date 05 mar 2020 SERVICE TO BE PROVIDED No. Deseription ‘TOTAL PRICE 10 Material for Installation ducting of HVA 1a 3.834.320 1450009402 / 00030 consist of: 1 88 Steel Rod MB for beam Clomp Quantity 9: 2A unit Price : 412.058 Sub Total + 825.716 2 5 Bolt & Mut MB ¢/u Washer Plate Quantity | 40 BR Unit Price : 55.715 ‘Sub Total + 2.228.600 2 ig Sav Blade Quantity: 2 EA unit Price + 175.715 Sub Total; 351.430 4 Drill bit eize M4 Machi or Baual created by: ANDRIAS ATHOKO = QO 7 PERTAMINA Pertamina Hulu Energi ONWJ PRE Tower T8.Simetvpang Kev 98 skkmigas Fra Release Order for Services 3700041440 Page 2 of 2 Start Date 04 Feb 2020 znd Date 05 Mar 2020 SERVICE 70 BE PROVIDED No. Description Quantity =: 4 BA Unit Price + 107,143 Sub total + 428.572 ‘roma, PRICE Total 3.934.318 i ‘Tax! 383.432 fey fe sors (R LLIN RGHED GREEDY IGG FRY NED FPF ‘Grand Total 4.217.750 [SHES ORIGINAL MOST BE RETURNED WITH YOUR INVOICE TO ENSURE PAYMENT BY FINANCE DEPARTMENT = ror a Service Order created with reference to a Contract, the terns and conditions (including pricing / schedule of rates) stipulated in the Contract shall apply. For Service Order created without reference to a Contract, the attached Service order General Terms and Conditions apply. wot Intended Us! Material for Installation ducting of HVA Acknowledged & Agreed on behalf of LANG PERKASA 141144 - Pr. Name : Moctis eve Title 1 VIPERA inn ‘STAMP DUTY (SIGNATURE) Requestor's name : ANDRIAS ATMOKO Date (a8/me/yyyy) A / 1/220" Approved By + pate (aa/mn/yyyy): OY/oL-/ Zo Ts a AV PERTAMINA COST ESTIMATE PHE ONWJ a ay ete oe = Sees ate eden | ee pesca ieee lla = en ; amare ——— j ae oe : ee os te Ht a st eat ee == a Hib Luctey 7: il ‘Grease ata ang Pei nance Enger SAP Crete s< "TECIMCAL SERVICE CONTRACTOR ELETUCAL MAINTENANCE AND REPAIR SERVICE x 7s ‘CONTRACT NO. 4710002312 (A PERTAMINA sansa PT. PERTAMINA HULU ELERGI OFFSHORE NORTH WESTJAVA REQUEST FOR QUOTATION sakara,4Febuan 2020, Nomar osrfcer/Pnetetica 20 epada yi, 7. eran Hla Enery Ofshore Nex Westsau8 Pureantoonts}u Arad, TowsrF 1.8 Smatpargion 88 basa 1520 ‘va. andi umko ‘Dengan oa, Bern nmin senewara ara unk peceean Supt Mate fr hstallon Ducting ot HVAC at FPO FER Sabagainana lan yong ees dengan data Conret No (7100002112 eit |Sipiy ater for instalation Ducting of HVAC st FBRO PER 55 Stee fod Mi for beam Comp 5 Bot & Nut chv Washer sig Saw Blade (elit sine NW Nahi or Eel ‘Gursisafwont 78 ay category Supply DerkanPenaaran yang tampa, la prhaan sea herasamens tr eaplantorina kash Propaseaby, sooroeedy, x PT. Pertarsing Hulu Energi Ofishore North West av “hin S nur wardens sos aemao Project Manse ‘SeetealMainarance Tem Lander No Deskripsi Meterial vom] Bees S_| Ol Emkorate RB OST CAN | 6428,572.00 '36_| Fist Duet (Ductal) 1.2 x2 meier tor_|10.252,000.00 37_[ Armollex for Ducting tor_|— 4,000,000.00 38_| Armolex for Piping Lor_|4,000,000.00 39_| Glue for Armafiex -Superion TOT [_2,142,858.00 40_[ Epoxy Piste Steel tor | 2571,429.00 1_| Duct Tope 1OT_| —2,392,858.00 @2_| Aluminium Tope tor [_2571,429.00 43_| Double Nipple 1/4 Brass er Copper fA 642,858.00 44 | Double Nipple 1/2°- Bross or Copper EA 714,286.00 45_| Double Nipple 3/4". Bross or Copper fA 1,071 429.00, 46_| Double Nipple 3/8" Brass or Copper EA 1.178,572.00 47_| Double Nipple 5/8 Brass er Copper EA 1,357,143.00 48_| Double Nipple 7/8" Bross or Copper EA_|___1,392,858.00 49 _| Double Nipple |" - Bross or Copper fA 1,392,858.00 30 Bross or Copoee EA 1,785,715.00 31 Brass o- Copper EA 1,857,143.00 52 Bross o¢ Copper EA 2,000,000.00 53_| Double Nipple 1 1/2". Bross oc Copper A 2,07 1,429.00 '54_| Double Nipple 2 - Brass or Copper EA 2, 142,858.00 '55_| Pillow Block Bearing EA 6,428,572.00 '56__| Adopior for Plow Block Beoring FA 000,000.00 57 | Regulator Nirogent (N2) fA_[33,214,286.00 4.7 Consumable Materials for Contruction Activity No | Deshipsi Material vom OR 1_| Goble Giend Size 1 Inch chw Cold shvink tor 385,715.00 2__| Coble Glond Size 11/4 Inch c/w Cold shrink tor 535,715.00 3 | Coble Glond Size_1 1/2 Inch c/w Cold shrink tor 568,572.00 4_| Coble Glond Size 2 Inch c/w Cold shrink Lor (642,858.00 '5_| Myer Hub 1", Crouse Hinds Aluminium A 392,858.00 6 _| Myer Hub 1 1/4, Crouse Hinds Aluminium fA '500,000.00 7_| Myer Hub 11/2", Crouse Hinds Aluminium A 642,858.00 8_| Myer Hub 2%, Crouse Hinds Aluminium mA 785,715.00 9 | Holesaw for glond 1 inchi fA 111,429.00 10 | Holesaw for glond 2 inchi A 222,858.00 11_| Holesaw for gland 2-1/2 inchi EA 270,000.00 V2 | Reducer 1/2 - 1/4 inchi fA 17,858.00, 13 | Reducer 172-1 inchi fA 28,572.00 14 | Redueer 3/4 = 1 inchi fA '50,000.00 15 | Reducer 1 «1 1/4 inehi A 64,286.00 16 | Redueer |= 11/2 inchi FA 97,143.00 17_| Reducer 1-2 inchi EA 127,143.00 Te i ESE ep 19. | GUAT 1/2" Cross Hind or Equal EA 714,286.00 20_| GUAT 3/4" Cross Hind or Equol fA 857,143.00 Temeien & Bhi C Korte / Contot No. 4710002112 No Deskripst Meterial vom Swat 21_| GUAT" Grass Hind or Equal A 77000,000:00 22_| GUAT 1 1/4" Cross Hind or Equal FA 1,142,858.00 [723 [ GUAT 1/2" Cross Hind or Equal fA 1,357,143.00 24 | GUAT 2° Cross Hind or Equal FA 1,714,286.00 25 | GUAL 1/2" Cross Hind or Equal fA 571 429.00 26 | GUAL 3/4" Cross Hind or Equal EA 642,858.00 27 _| GUAL 1* Cross Hind or Equal cA 785,715.00 28 | GUAL1 1/4" Cros Hind or Equal fA 7,000,000.00 29 | GUAL1 1/2" Cross Hind or Equal ”A T.142,858.00 30_| GUAL 2° Cross Hind or Equal FA 1,428,572.00 31_| GUAX 1/2" Cross Hind or Equal cA 785,715.00 32 | GUAK3/4" Cross Hind or Equal fA 928,572.00 33. | GUAX1: Gross Hind or Equol tA 7,071 429.00 34_[ GUAK11/4° Gross Hind or Equal fA 1,214,286.00 35_[ GUAK1 1/2° Cross Hind or Equal A 1,571 429.00 36 | GUAX 2 Cross Hind o- Equal fA 1,785,715.00 37_| Beam Clamp EA 5,714,286.00 [38 | iz '39_| SS Stee Rod M10 for beam Clamp tA 431,429.00 40_| SS Stel Rod M1? for beam Clamp mA 540,000.00) “41_[ MCT Module RM20 Rosect tA 1,639,962.00 | 742. [ MCT Modole RM-30 Roxtect tA 1,810,811.00 23_[ MCT Modble RM.40 Rowect EN 2,114, 865,00 44 [MCT Module RM-60 Rowect EA 2,400,579.00 45_| MCT Modula RM90 Roxiect cs 2,686,293.00 46_| MCT Module RM-120 Roxie fA 2,829,151.00 47_| Wedge for MCT Modivle fA 3,876 479.00 “48_| Wedge Clip for MCT Modula eA 144,643.00 49 | Stoyplote for MCT Module FA 260,358.00 '50_[ Lubricont for MCT Medtule fA 731,429.00 51_[ MCT Frome Module FA 1,533,215.00 '52_| Cable 1C x 16 AWG (1.5 mm] - SIS Coble or Equal ROUAOOMTR 872,143.00 53_| Coble 1Cx 14 AWG (2.5 mm] - SIS Coble or Equal ROL/SOOMTR | —_1,427,143.00 34_| Cable 1C x 12, AWG (4 mmd}- SIS Cable or Equal ROLS0OMTR | _2,259,643.00 55_| Cable 1C x 10 AWG (6 mma) - SIS Cable or Equal ROU/300MTR '3,330,000.00 56 | Tie Mount for wir ightening PACK 334,786.00 57_| Plastic Spiral A 228,572.00 58_| PVC Wire Dut FA 64,286.00, 59 [DIN Rail FA 42,858.00 60_| Cable ug 16 AWG (1.5 mm, TAB or Panduit PACK 50,000.00 1_| Cable Lug 18 AWG (0.75 mm), TAB or Pondut PACK 35,715.00 62. | Cable lig 12 AWG (4 mm), TAB or Panduit PACK 64,265,00 43_| Coble Lug 10 AWG (6 mm), TAB or Panduit PACK 78,572.00 Konak Convct Ne. 4710002312 alamen /2oge 6 don / of 10 Tompron 6 Shure No Deskripsi Maer! uoM Hea 64 _| Cable Lug BAWG (10 mm, T8B or Panduit PACK 972,858.00 65_| Cable lug 6 AWG (14 mm], T&B or Panduit PACK 707,143.00 56 | Coble Lug 4 AWG (25 mm), T&B or Panduit EA 121,429.00 ‘67 | Coble Lug 2 AWG (35 mm), T88 or Panduit EN 135,715.00 68_| Coble Lug 1 AWG (35 mm), T&B or Panduit EN 150,000.00 69 | Coble Lug 1/0 AWG (50 mm), T88 or Ponduit BA 164,286.00 70_| Coble Lug 2/0 AWG {70 mm), 188 or Ponduit EN 178,572.00) 71_| Coble Lug 4/0 AWG {120 mm), T&B or Ponduit EA 192,858.00 72 | Coble Lug 250 MCM/AWG (120 mm), T&B 0 Pand EN 207,143.00 73 | Coble lug 350 MCM/AWG (185 mm), T&B or Panduit FA 221,429.00 74_| Coble Lug 500 MCWAWG_(240 mm), T&B or Panduit EA 235,715.00 75 76 | SS Cable Ties PACK 1,428,572.00 77 | Plostic/Vynil Cable Ties PACK 100,000.00 78_| Scoth 23 - 3M, Rubber FA 100,841.00 79 | Scoth 33 - 3M, Vinyl FA 78,992.00 80_| Scoth 34 - 3M, Vinyl FA 90,757.00 81_| Scoth 35 - 3M, Vinyl fA 119,328.00) 82 | Scoth 70. 3M, Rubber [High Volioge) FA 647,059.00 '83_| Sond Poper fA 10,000.00 '84_| Electrical Cleoner- Chesterton or Equal fA 512,606.00) 85 | Insvletion Vernish FA 258,572.00 86 | Nylon Rope for Heoterinicllction fA 7,008,404.00 87_| Round Belt Healer 120 V, 500 W FA 1,251,429.00 ‘86 | Round Belt Heater 120V, 300 W fA 1,771 429.00 89 | Multipurpose Grease fA 201,681.00 90 | Wire Rope Grease, Chesierion or Equal fA 292,437.00 91_| RIV Seolent FA 50,421.00 92 | Ani Seize EA 3.109,244.00 93_| Pen Marker FA 672,269.00 94 | Seol Tape fA 78,992.00 95 | Poper tokban EA 33,614.00 96 | Plosiic Lokbon fA 57,143.00 97_| Lock Tight 565 fA 478,992.00 98 _| Electrical Lubricant WO-40 or equal FA 216,807.00) 99 | Electrical Contact Greose fA 1,176,303.00 100 | Wire Morker 16 AWG (1.5 m2) PACK 707,143.00 101 | Wire Worker 14 AWG [2.5 m2) PACK 764,286.00 102 | Wire Morksr 12 AWG (4 mm2) PACK 702,858.00 | 103 | Wire Marker 10 AWG [6 mm2) PACK 614,286.00) 104 | Wire Morker 8 AWG (10 mm2) PACK 785,715.00) 105 | Wire Marker 6 AWG (16 mm PACK 892,858.00 106 | Wire Morker 4 AWG (25 mm PACK 7,000,000.00 Toraver Bhi Kenrat / Cnet. 4710002112 Halaman Poge 7 dart / of 10 No. Deskrips! Material UOM Ee 150 | Bok & Nut M12 c/w Washer Plate 38,572.00 151 | Bolt & Nut M14 c/w Washer Plate 42,858.00 152 | SS Bolt & Nut Md c/w Wesher Fle 47,143.00 153 | SS Bolt & Nu! Mé c/w Washer Plate ‘51,429.00 154 155 | $5 Bolt & Nut MIO c/w Wosher Plate fA 0,000.00 156 | SS Bolt & Nut MI2 c/w Wesher Plote FA 64,286.00 157 | S$ Boll & Nut M4 c/w Wosher Plote EN 68,572.00 158 | Topping Screw M4 EA 21,429.00 159 | Tapping Screw M6 FA 25,715.00 140 | Tapping Screw MB. EA 30,000.00 161 | Topping Serow M10 EA 34,286.00 142 | Topping Screw M2 FA 38,572.00 163 | Fisher M6 FA 21,429.00 164 | Fisher MB EA 25,715.00 165 | Fisher M10 EA 30,000.00 166 | Fisher M12 fA 34,286.00 167 | Dynabolt M6 EA 38,572.00 168 | Dynabott M8. EA 42,858.00 169 | Dynabolt M10, fA 47,143.00 170 | Dynobalt M12 BA 51,429.00 171 | Unistrut Chonsel fA 128,000.00 172 | Spring Nut e/w Bolt Ma EA 10,715.00 173 | Spring Nut c/w Bolt M& fA 121,429.00) 174 | Spring Nut e/w Bolt MB EN 15,715.00 175 | Spring Nut e/w Bolt M10 fA 21,429.00 176 | Spring Nut c/w Bolt MI2 FA "30,000.00 177 | Cooper Free Aumurivm Cable Trey 100 mm EA 621,429.00) 178 | Cooper Free Alumurium Cable Trey 150 mm EA 871,429.00 179 | Cooper Free Alumunivm Cable Trey 200 mm EA 1,177,143.00 180 | Cooper Free Alumunium Cable Ledder 100 mm FA 900,000.00 181 | Cooper Free Alumunium Coble Lodder 150 mm EN 928,572.00 182 | Cooper Free Alumunium Cable Ledder 200 mm fA 957,143.00) 183 | SS Bolt for Jointing Cable Ladder / Tra FA 10,000.00 184 | Aluminium Splice Plate for Cable Ladder /Troy A 37,143.00 Horge di clos honyo digunckon untuk kebutuhon The above rotes shall only be used for urgent and mendesok dan dorurot untuk suku codang kelistikan penting uniuk mendukung fosiites produksi_ dalam ‘mencegeh Shutdown don kehilongon predulsi, juge dolom mendukung kebutuhon bahon tambahon selamo ‘odifikasi perololan kelisikon yang sudah urong, Kendisi borikut beriaky untuk horgo dislos ‘emergency material requirement of electrical eral part To support production faciliies in preventing shut down and loose production, oso in supporting odditional —moteviols requirement during ‘modification of obsolete electrical equipment The following condilions sholl apply for the above Temiron 6 Bite Konak f Conrct No. 4710002112 Holomon / Page 9 don / of 10

You might also like