(4) KPI - AC MOTOR LOW VOLTAGE RECONDITIONING + REWINDING WORKS

PAINTING/PACKING
JOURNAL BEARING
DELIVERY

ESTIMATION FOR
REPLACING NEW
REASSEMBLING
(EXCLUDE

PRE TEST /PRE

METAL SPRAY
DISMANTLING
D FOR

REBUSHING
REWINDING
CLEANNING

BALANCING

FINAL TEST
NO POWER ROTOR
SHAFT

WORKS

SHAFT
REPLACEM

INSP
ENT)

(HP) (day) (day) (day) (day) (day) (day) (day) (day) (day) (day) (day) (day)
1 >0,5 - 1 0.5 1 1 7 2 2 0.5 0.5 0.25 0.2 15 5
2 >1 - 3 0.5 1 1 7 2 2 0.5 0.5 0.25 0.2 15 5
3 >3 - 5 0.5 1 1 7 2 2 0.5 0.5 0.25 0.2 15 5
4 >5 - 10 0.5 1 1 7 2 2 0.5 0.5 0.25 0.2 15 5
5 >10 - 15 0.5 1 1 10 2 2 0.5 1 0.25 0.2 18 7
6 >15 - 25 1 1 1 10 2 2 0.5 1 0.25 0.5 19 7
7 >25 - 40 1 1 1 12 2 2 0.5 1 0.5 0.5 22 12
8 >40 - 60 1 1 1 12 3 2 0.5 1 0.5 0.5 23 12
9 >60 - 100 1 1 1 14 3 2 1 1 0.5 0.5 25 12
10 >100 - 150 1 1 1 14 4 2 1 1 0.5 0.5 26 15
11 >150 - 200 1 1 1 14 4 2 1 1 0.5 0.5 26 15
12 >200 - 300 1 1 2 16 5 3 1 1 1 1 32 15
13 >300 - 400 1 1 2 20 5 3 1 2 1 1 37 21
14 >400 - 500 1 1 2 20 6 3 1 2 1 1 38 21
15 >500 - 600 1 1 2 20 6 3 1 2 1 1 38 21
NO Job Description Progress Bobot
1 2 3 4
1 Inspection 10%
1 - BDV 0.50 1.00 0.5 1
1 - TTR 0.50 1.00 0.5 1
1 - Insulation Resistance 0.50 1.00 0.5 1
1 - Leak test 5.49 3.00 1.83 1 1 1
2 - Main Tank 1.50 3.00 0.5 1 1 1
2 - Coil Fin 1.50 3.00 0.50 1 1 1
2 Report Inspection 2.00 1.00 2 1
3 Drain Oil 2.00 1.00 2
4 Dismantle 5 1.00
4 - Winding & Tap Changer 1.00 1.00 1
4 - Base Plate 2
4 - Coil Fin 2
5 Fabrication 15
5 - Rewinding
5 - Replace Base Plate 5
5 - Repair/Replace Coil Fin 5
5 - Repair/Replace Junction Box 5
6 Welding 20
7 Chipping/Sand Blasting 10
8 Painting 10
9 FAT 10
9 - BDV 1
9 - TTR 1
9 - Insulation Resistance 1
9 - Leak test 4
### - Main Tank 1.5
### - Coil Fin 1.5
10 Energize 5
79.1 9.33
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

1
1
1

1
1
1
1 1 1
1 1 1
1 1 1
DAY
28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
51 52 53 54 55 56 57 58 59 60