PLAN SHIPMENT PT KAPUAS BARA UTAMA

PERIODE DESEMBER 2023


TANJUNG
VIRGO BG RIMAU HARLINA
S COAL INVENTORY EWIS 138 PUMA 5 CALVIN 82 PURA EWIS 138 SABANG 55 NAYAKA II EWIS 138 TBA TBA RIMAU 1615 TBA TBA TBA
POWER 3 2002 107
O XXVII TOTAL
TOTAL KEKURANGAN
PLAN
U HAULING
ALL SHIPMENT
BULAN
R Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed BULAN
C ISP KM 17 JETTY STOCK DESEMBER
05-Des-2023 07-Des-2023 06-Des-2023 08-Des-2023 09-Des-2023 11-Des-2023 13-Des-2023 14-Des-2023 16-Des-2023 17-Des-2023 17-Des-2023 DESEMBER
E

RAW - 745,542 745,542 7.537,642 8.424,616 7.550,588 7.500,000 7.500,000 7.500,000 7.500,000 30.000,000 (29.254,458)
CRUSHED 1.665,050 2.712,176 4.377,226 3.852,543 10.021,033 10.066,396 5.219,194 7.304,295 3.823,324 4.049,067 3.802,356 10.000,000 10.000,000 20.000,000 (15.622,774)
Total 1.665,050 3.457,718 5.122,768 3.852,543 10.021,033 7.537,642 10.066,396 8.424,616 5.219,194 7.304,295 3.823,324 4.049,067 7.550,588 3.802,356 7.500,000 7.500,000 10.000,000 7.500,000 7.500,000 10.000,000 50.000,000 (44.877,232)
Note :
- Inventori setelah barging Tb. Ewis 138 & Tb. Nayaka II

- Tb. Ewis 138 / Bg. Sinar Lancar 108 : 3.852,543 - Crushed Coal (Completed 05 Desember 2023)
- Tb. Puma 5 / Bg. Virgo Sejati 333 : 10.021,033 - Crushed Coal (Completed 07 Desember 2023)
- Tb. Calvin 82 / Bg. Ganda Sari 3002 : 7.537,642 - Raw Coal (Completed 06 Desember 2023)
- Tb. Virgo Power 3 / Bg. Virgo Sejati 332 : 10.066,396 - Crushed Coal (Completed 08 Desember 2023)
- Tb. BG Rimau 2002 / Bg. Rimau 3016 : 8.424,616 - Raw Coal (Completed 09 Desember 2023)
- Tb. Harlina 107 / Bg. Soekawati 2702 : 5.219,194 - Crushed Coal (Completed 11 Desember 2023)
- Tb. Tanjung Pura XXVII / Bg. Laskat Jaya 25 XXV : 7.304,295 - Crushed Coal (Completed 13 Desember 2023)
- Tb. Ewis 138 / Bg. Sinar Lancar 108 : 3.823,324 - Crushed Coal (Completed 14 Desember 2023)
- Tb. Sabang 55 / Bg. Sumber Jaya 89 : 4.049,067 - Crushed Coal (Completed 16 Desember 2023)
- Tb. Nayaka II / Bg. Sumanggala 2 : 7.550,588 - Raw Coal (Completed 17 Desember 2023)
- Tb. Ewis 138 / Bg. Sinar Lancar 108 : 3.802,356 - Crushed Coal (Completed 17 Desember 2023)