You are on page 1of 12

DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA

MINISTRY OF IRRIGATION
MAHAWELI WATER SECURITY INVESTMENT PROGRAM

CONSTRUCTION OF UPPER ELAHERA CANAL


FROM 27+509KM TO 55+600KM INCLUDING 27.7KM LONG TUNNELS
CONTRACT NO. MWSIP / MMDE / ADB / UECP / ICB-2A / P47381-005-SRI / ICB / 2017 / 006
CONTRACT PACKAGE UECP-ICB-2A

3m x 2.5m TRIPLE CELL BOX CULVERT DESIGN OF


SOUTHERN ACCESS ROAD (SA5)

PROGRAM MANAGMENT DESIGN & SUPERVISION CONSULTANT CHINA STATE CONSTRUCTION ENGINEERING CORPORATION.LTD

(PMDSC) (CSCEC)

DOCUMENT CONTROL NUMBER:ICB2A‐CSC‐TECH-SPA-DD‐STC‐001-01


CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD.
CONSTRUCTION OF UPPER ELAHERA CANAL FROM 27+509KM TO 55+600KM INCLUDING 27.7KM LONG TUNNELS

00 16/09/2021 K.T C.J

Checked by Approved by
Revision # Date prepared by
Team Leader Chief Engineer

DOCUMENT CONTROL NUMBER: ICB2A‐CSC‐TECH-SPA-DD‐STC-001‐01 1 OF 1 PAGE


2+2
90

DO EAM
ST
R
WN
SOFT SHOULDER

CARRIAGE
SOUTHERN PORTAL WAY

2+
30
0 CARRIAGE
KONDURUWAWA
WAY

SOFT SHOULDER

PROPOSED BOX
CULVERT

ST
UP AM
RE
2+310

2+350
2+320

2+330

2+340
KEY PLAN
SCALE 1:100

NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS


EXCEPT FOR STATION IN METERS.

EMPLOYER CONSULTANT CONTRACTOR Scale As shown Project Title UPPER ELAHERA CANAL PROJECT UECP-ICB-2A
Designed K.T. FROM 27+509KM TO 55+600KM INCLUDING 27.7KM LONG TUNNELS
Drawn A.D.J Drawing Title
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA 3m X 2.5m TRIPLE CELL BOX CULVERT @ CH 02+323.920
Checked C.J. 01 2021-09-16 SECOND SUBMISSION
MINISTRY OF IRRIGATION Sheet No. REV
CHINA STATE CONSTRUCTION ENGINEERING CORPORATIONApproved
PROGRAM MANAGEMENT,DESIGN AND SUPERVISION CONSULTANT LTD. Y.C.Z. 00 2021-08-19 FIRST SUBMISSION Drawing No. ICB2A-CSC-TECH-SPA-DD-STC-001-01
MAHAWELI WATER SECURITY INVENSTMENT PROGRAM 01 OF 10
(PMDSC) (CSCEC) Date 2021.09.16 REV DATE DESCRIPTION
P-19
WING WALL

0
60
10
00 WING WALL
0
P-18
P-20

60
DO EAM
ST

0
R
WN
0 0
50

GUARD
STONE P-17

Y
11416

P-02 P-03 P-04


P-01 P-05

CURVE
WIDENING

P-21

1000
1000 x 6780 x 200 Tk. SOFT
APPROACH SLAB SHOULDER

10

3500
50
27° 27° 27°

0
CARRIAGE

2500
SOUTHERN PORTAL WAY KONDURUWAWA

X X

CH

CH

CH
10
P-06 P-07 P-08

02+
50

02+

7000
02+
0
300 300

320
300

323

327
.

.92
227

.61
0

2500
CARRIAGE
0 0
1000 x 6780 x 200 Tk. 300 300 30
00 WAY

3500
APPROACH SLAB P-16

300 300 300

1000
SOFT
SHOULDER

P-09 P-13
P-10 P-11 P-12
1200 1200 1200 1200 1200 1200 1200 1200 1200
P-22
GUARD

Y
STONE

00
50
60

ST
0

UP AM
RE
P-23 10
WING WALL 00 P-15
0
2+310

WING WALL
2+320

0
60
2+330
P-14

2+340
PLAN VIEW NOTES:

SCALE 1:100 1. ALL DIMENSIONS ARE IN MILLIMETERS


EXCEPT FOR STATION IN METERS.
2. MCR WALL LENGTH SHALL BE ADJUSTED
TO SUIT THE SITE CONDITION.

EMPLOYER CONSULTANT CONTRACTOR Scale As shown Project Title UPPER ELAHERA CANAL PROJECT UECP-ICB-2A
Designed K.T. FROM 27+509KM TO 55+600KM INCLUDING 27.7KM LONG TUNNELS
Drawn A.D.J Drawing Title
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA 3m X 2.5m TRIPLE CELL BOX CULVERT @ CH 02+323.920
Checked C.J. 01 2021-09-16 SECOND SUBMISSION
MINISTRY OF IRRIGATION Sheet No. REV
CHINA STATE CONSTRUCTION ENGINEERING CORPORATIONApproved
PROGRAM MANAGEMENT,DESIGN AND SUPERVISION CONSULTANT LTD. Y.C.Z. 00 2021-08-19 FIRST SUBMISSION Drawing No. ICB2A-CSC-TECH-SPA-DD-STC-001-01
MAHAWELI WATER SECURITY INVENSTMENT PROGRAM 02 OF 10
(PMDSC) (CSCEC) Date 2021.09.16 REV DATE DESCRIPTION
128

FINISHED GROUND GUARD STONE


LEVEL
127
WING WALL 125.615 WING WALL
125.915
125.876 125.876
126

125

2500

2500

2500
EXISTING GROUND
LEVEL
124
122.815
123.115
123
122.276 122.276
75mm Tk.
121.876 SCREED CONCRETE 121.876
122

121

DATUM ELEV
120.000
Ch2+310

Ch2+320

Ch2+330

Ch2+340
CHAINAGE
126.026

126.026

126.026

126.026
FINISHED
GROUND LEVEL

123.571
126.176

123.048

125.038
EXISTING
GROUND LEVEL

SECTION X-X
SCALE-1:100

CH 02+323.920
SOFT CL SOFT
2330 SHOULDER CARRIAGE WAY CARRIAGE WAY SHOULDER
1119 2798 2798 1119

GUARD STONE
GUARD STONE
WING WALL

-4.46% -2.68% 126.026 -0.89% -4.46% 125.958 125.958


125.856 125.856
125.615 125.658
125.553

WING WALL

2500
-1.00% 123.115 -1.00%
123.158
123.053

122.006 122.104 122.358


600

122.256 COMPACTED SAND FILL


121.958
121.856
75mm Tk.
SCREED CONCRETE
SECTION Y-Y CUTOFF WALL
CUTOFF WALL SCALE-1:75 NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS


EXCEPT FOR STATION IN METERS.
2. BOX CONCRETE SHALL BE G:C25/30.

EMPLOYER CONSULTANT CONTRACTOR Scale As shown Project Title UPPER ELAHERA CANAL PROJECT UECP-ICB-2A
Designed K.T. FROM 27+509KM TO 55+600KM INCLUDING 27.7KM LONG TUNNELS
Drawn A.D.J Drawing Title
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA 3m X 2.5m TRIPLE CELL BOX CULVERT @ CH 02+323.920
Checked C.J. 01 2021-09-16 SECOND SUBMISSION
MINISTRY OF IRRIGATION Sheet No. REV
CHINA STATE CONSTRUCTION ENGINEERING CORPORATIONApproved
PROGRAM MANAGEMENT,DESIGN AND SUPERVISION CONSULTANT LTD. Y.C.Z. 00 2021-08-19 FIRST SUBMISSION Drawing No. ICB2A-CSC-TECH-SPA-DD-STC-001-01
MAHAWELI WATER SECURITY INVENSTMENT PROGRAM 03 OF 10
(PMDSC) (CSCEC) Date 2021.09.16 REV DATE DESCRIPTION
GUARD STONE
SOUTHERN PORTAL CULVERT KONDURUWAWA
FINISHED GROUND CL
LEVEL WING WALL
WING WALL
125.658
125.958
125.958 125.958

EXISTING
GROUND
LEVEL

4000
2500

2500

2500
4000
123.158 123.158 123.158

122.358 122.104 122.358

121.958 121.958

75mm Tk.
SCREED CONCRETE

ELEVATION OF UP STREAM
SCALE-1:75

GUARD STONE
KONDURUWAWA SOUTHERN PORTAL
CULVERT
FINISHED GROUND CL
LEVEL
WING WALL WING WALL
125.553
125.856 125.856
125.856

EXISTING GROUND
LEVEL
2500

2500

2500
4000

4000
123.053 123.053 123.053

122.256 122.006 122.256

121.856 121.856

75mm Tk.
SCREED CONCRETE

ELEVATION OF DOWN STREAM


SCALE-1:75

NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS


EXCEPT FOR STATION IN METERS.
2. BOX CONCRETE SHALL BE G:C25/30.

EMPLOYER CONSULTANT CONTRACTOR Scale As shown Project Title UPPER ELAHERA CANAL PROJECT UECP-ICB-2A
Designed K.T. FROM 27+509KM TO 55+600KM INCLUDING 27.7KM LONG TUNNELS
Drawn A.D.J Drawing Title
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA 3m X 2.5m TRIPLE CELL BOX CULVERT @ CH 02+323.920
Checked C.J. 01 2021-09-16 SECOND SUBMISSION
MINISTRY OF IRRIGATION Sheet No. REV
CHINA STATE CONSTRUCTION ENGINEERING CORPORATIONApproved
PROGRAM MANAGEMENT,DESIGN AND SUPERVISION CONSULTANT LTD. Y.C.Z. 00 2021-08-19 FIRST SUBMISSION Drawing No. ICB2A-CSC-TECH-SPA-DD-STC-001-01
MAHAWELI WATER SECURITY INVENSTMENT PROGRAM 04 OF 10
(PMDSC) (CSCEC) Date 2021.09.16 REV DATE DESCRIPTION
NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


10200 2. THE CONCRETE SHALL BE G:C25/30.
3. ALL BARS MARKED "T" SHALL BE HIGH YIELD
300 3000 300 3000 300 3000 300 DEFORMED BARS OF YIELD STRENGTH NOT
TO LESS THAN 460N/mm² .
4. ALL BARS MARKED "R" SHALL BE HOT
ROLLED MILD STEEL PLAIN BARS OF YIELD

300
STRENGTH NOT LESS THAN 250N/mm2.
5. BARS OF CUT LENGTH LARGER THAN THE

250

250

250

250

250

250
SUPPLIED LENGTH TO BE LAPPED WITH
MINIMUM LENGTH OF 50Ø, WHERE Ø IS THE
250 250 250 250 250 250 DIAMETER.
6. CONCRETE COVER FOR REINFORCEMENT
SHALL BE 60 mm.
* BAR NOTATIONS
5 T 10 - 06 - 150 T
2500

2500

2500

2500
3100

BAR LOCATION
3000 3000 3000
BAR SPACING

BAR MARK
250 250 250 250 250 250
BAR DIAMETER
250

250

250

250

250

250
BAR TYPE 'T' OR 'R'

NUMBER OF BARS
300

ELEVATION OF DOWN STREAM


SCALE-1:75

7T10-37-(150 x 300)
800 (SHEAR HOOKS) 68T12-10-150-T2 36T20-01-150-T1 800
07 07
1T10-38-(150 x 300) 05 01 06 37 38 07 37 37 07 38 37 37 06 01 05 38
(SHEAR HOOKS)
02

02
53T12-09-200 09 36T16-02-150-B1 09
09 09 09
1200 1200 1200
1200 1200 1200
66T20-06-150 51T12-11-150-B2 06

70T16-07-150 07 05
08

08
07 07

30T12-14-200 07

30T12-15-200 30T12-17-200
06

06
70T16-05-150 30T12-16-200

450 450 450 450 450 450


09 09 36T16-04-150-T1 09 09 09
09
64T20-08-150 36T20-03-150-B1 08
51T12-13-150-T2
04

04
38 38
05 37 03 08 37 38 07 37 37 38 07 37 08 03 05
37
68T12-12-150-B2
800 07 07 800

REINFORCEMENT DETAIL OF BOX CULVERT - (SECTION Z-Z)


SCALE : - 1:30

EMPLOYER CONSULTANT CONTRACTOR Scale As shown Project Title UPPER ELAHERA CANAL PROJECT UECP-ICB-2A
Designed K.T. FROM 27+509KM TO 55+600KM INCLUDING 27.7KM LONG TUNNELS
Drawn A.D.J Drawing Title
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA 3m X 2.5m TRIPLE CELL BOX CULVERT @ CH 02+323.920
Checked C.J. 01 2021-09-16 SECOND SUBMISSION
MINISTRY OF IRRIGATION Sheet No. REV
CHINA STATE CONSTRUCTION ENGINEERING CORPORATIONApproved
PROGRAM MANAGEMENT,DESIGN AND SUPERVISION CONSULTANT LTD. Y.C.Z. 00 2021-08-19 FIRST SUBMISSION Drawing No. ICB2A-CSC-TECH-SPA-DD-STC-001-01
MAHAWELI WATER SECURITY INVENSTMENT PROGRAM 05 OF 10
(PMDSC) (CSCEC) Date 2021.09.16 REV DATE DESCRIPTION
ST
30T16-19-150-B1

UP AM
RE
4T16-21-150-B1 30T20-18-150-T1
06 02 25b
01
4T20-20-150-T1 25a 06

170
0
800

ROAD C
L

800

11

10
1

17
00

12T20-25a-150-T3 19 20

DO EAM
ST
21
12T16-25b-150-B3 1 18

R
WN
TOP SLAB TOP VIEW
SCALE-1:75 NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. THE CONCRETE SHALL BE G:C25/30.
3. ALL BARS MARKED "T" SHALL BE HIGH YIELD
480 DEFORMED BARS OF YIELD STRENGTH NOT
480 TO LESS THAN 460N/mm² .
480
480 4. ALL BARS MARKED "R" SHALL BE HOT
ROLLED MILD STEEL PLAIN BARS OF YIELD
STRENGTH NOT LESS THAN 250N/mm2.
5. BARS OF CUT LENGTH LARGER THAN THE
SUPPLIED LENGTH TO BE LAPPED WITH
57T12-35a-200 MINIMUM LENGTH OF 50Ø, WHERE Ø IS THE
REFER BOX CULVERT DIAMETER.

1053
1053

57T12-35-200 6. CONCRETE COVER FOR REINFORCEMENT


R/F DETAIL REFER BOX CULVERT
SHALL BE 60 mm.

750
R/F DETAIL
750

7. SKEW REINFORCEMENT IS PROVIDED AT


9T12-34-200 NEAR TO ALL VERTICAL WALL (AT TOP SLAB
57T12-36a-150 9T12-34a-200
& BOTTOM SLAB AS SHOWN IN THE
57T12-36-150 DRAWINGS.
75mm Tk. CUTOFF WALL 75mm Tk. * BAR NOTATIONS
SCREED CONCRETE SCREED CONCRETE 5 T 10 - 06 - 150 T
300 CUTOFF WALL 300

BAR LOCATION
DETAILS OF CUTOFF WALL R/F DETAILS OF CUTOFF WALL R/F DETAILS OF CUTOFF WALL DETAILS OF CUTOFF WALL BAR SPACING

(UP STREAM) (UP STREAM) (DOWN STREAM) (DOWN STREAM) BAR MARK
SCALE : - 1:30 SCALE : - 1:30 SCALE : - 1:30
SCALE : - 1:30 BAR DIAMETER

BAR TYPE 'T' OR 'R'

NUMBER OF BARS

EMPLOYER CONSULTANT CONTRACTOR Scale As shown Project Title UPPER ELAHERA CANAL PROJECT UECP-ICB-2A
Designed K.T. FROM 27+509KM TO 55+600KM INCLUDING 27.7KM LONG TUNNELS
Drawn A.D.J Drawing Title
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA 3m X 2.5m TRIPLE CELL BOX CULVERT @ CH 02+323.920
Checked C.J. 01 2021-09-16 SECOND SUBMISSION
MINISTRY OF IRRIGATION Sheet No. REV
CHINA STATE CONSTRUCTION ENGINEERING CORPORATIONApproved
PROGRAM MANAGEMENT,DESIGN AND SUPERVISION CONSULTANT LTD. Y.C.Z. 00 2021-08-19 FIRST SUBMISSION Drawing No. ICB2A-CSC-TECH-SPA-DD-STC-001-01
MAHAWELI WATER SECURITY INVENSTMENT PROGRAM 06 OF 10
(PMDSC) (CSCEC) Date 2021.09.16 REV DATE DESCRIPTION
ST
28T16-23-150-T1

UP AM
RE
6T16-25-150-T1 28T20-22-150-B1
08 04 26b
03
6T20-24-150-B1 26a 08
Z

17
00
800

ROAD C
L

800

13

12
2
170
0

24
12T20-26a-150-B3

DO EAM
ST
23 25
12T16-26b-150-T3 2 22 NOTES:

R
WN
1. ALL DIMENSIONS ARE IN MILLIMETERS.
2. THE CONCRETE SHALL BE G:C25/30.
BOTTOM SLAB BOTTOM VIEW 3. ALL BARS MARKED "T" SHALL BE HIGH YIELD
SCALE-1:75 DEFORMED BARS OF YIELD STRENGTH NOT
TO LESS THAN 460N/mm² .
4. ALL BARS MARKED "R" SHALL BE HOT
ROLLED MILD STEEL PLAIN BARS OF YIELD
STRENGTH NOT LESS THAN 250N/mm2.
5. BARS OF CUT LENGTH LARGER THAN THE
SUPPLIED LENGTH TO BE LAPPED WITH
MINIMUM LENGTH OF 50Ø, WHERE Ø IS THE
DIAMETER.
6. CONCRETE COVER FOR REINFORCEMENT
SHALL BE 60 mm.
7. SKEW REINFORCEMENT IS PROVIDED AT
NEAR TO ALL VERTICAL WALL (AT TOP SLAB
& BOTTOM SLAB AS SHOWN IN THE
DRAWINGS.
* BAR NOTATIONS
5 T 10 - 06 - 150 T

BAR LOCATION
BAR SPACING

BAR MARK

BAR DIAMETER

BAR TYPE 'T' OR 'R'

NUMBER OF BARS

EMPLOYER CONSULTANT CONTRACTOR Scale As shown Project Title UPPER ELAHERA CANAL PROJECT UECP-ICB-2A
Designed K.T. FROM 27+509KM TO 55+600KM INCLUDING 27.7KM LONG TUNNELS
Drawn A.D.J Drawing Title
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA 3m X 2.5m TRIPLE CELL BOX CULVERT @ CH 02+323.920
Checked C.J. 01 2021-09-16 SECOND SUBMISSION
MINISTRY OF IRRIGATION Sheet No. REV
CHINA STATE CONSTRUCTION ENGINEERING CORPORATIONApproved
PROGRAM MANAGEMENT,DESIGN AND SUPERVISION CONSULTANT LTD. Y.C.Z. 00 2021-08-19 FIRST SUBMISSION Drawing No. ICB2A-CSC-TECH-SPA-DD-STC-001-01
MAHAWELI WATER SECURITY INVENSTMENT PROGRAM 07 OF 10
(PMDSC) (CSCEC) Date 2021.09.16 REV DATE DESCRIPTION
25mm EXPANSION SPACE.
FILLED WITH APPROVED JOINT FILLER
600 600 1000 400
310 25mm Tk. CUSHION LAYER
75 x 12mm Tk. HARD RUBBER 230 32Ø PVC PIPE WITH END CAP
BEARING PAD

VARY AS SITE
250

200
CONDITION
500 (MAX)
CONC. GR. 20(40)

12
38

100 100
75 mm thk. STONE FILTER
LAYER BEHIND 300
STONE LINING 1000 x 10000 x 200 Tk.

200
APPROACH SLAB
MINIMUM 600mm thk.
50-200 DRY STONE LINING

100
200mm LONG 20mmØ
MS DOWELS AT 400c/c

1000
DETAIL OF APPROACH SLAB
SCALE 1:20
Ø 75mm PVC PIPE DETAIL OF CORBEL FOR APPROACH SLAB
WEEP HOLES SCALE 1:20
@ 1500 CRS. STAGGERED

300

3000
REFER R/F DETAIL
44T12-33-200 OF BOX CULVERT
6T12-31-200

1000
6T12-28-200

300 59T12-32-150
2R8-30-150

440
45T16-29-150
300x600mm

440
CLAY PUDDLE
OR APPROVED
POLYTHENE

600 G.L R/F DETAIL OF APPROACH SLAB


SCALE 1:20

1100
R/F DETAIL OF CORBEL
SCALE 1:20

MINIMUM
1000
300 1500 400

REINFORCED CONCRETE
400

CLASS C25/30 1700

26a 12 26a
75mmTHICK BLINDING

22
22
75

CONCRETE CLASS C12/15


2200

12
10T10-26-200 25T12-27-200 1700

13
10T10-26a-200 25T12-27a-200

23
23
TYPICAL SECTION OF WING WALL 25a 10 25a

18
18

26b
(TYPE M.C.R. - 5)
SCALE-1:25 13 26b
11
10

19
NOTES:
19

25b
1. ALL DIMENSIONS ARE IN MILLIMETERS. * BAR NOTATIONS
REFER CUTOFF WALL
2. THE CONCRETE SHALL BE G:C25/30. 5 T 10 - 06 - 150 T 11 25b
REINFORCEMENT
3. ALL BARS MARKED "T" SHALL BE HIGH YIELD
DEFORMED BARS OF YIELD STRENGTH NOT
TO LESS THAN 460N/mm² . BAR LOCATION
4. ALL BARS MARKED "R" SHALL BE HOT BAR SPACING SECTION - 1-1
ROLLED MILD STEEL PLAIN BARS OF YIELD SCALE 1:20
STRENGTH NOT LESS THAN 250N/mm2. BAR MARK
5. BARS OF CUT LENGTH LARGER THAN THE SECTION - 2-2
SUPPLIED LENGTH TO BE LAPPED WITH BAR DIAMETER SCALE 1:20
MINIMUM LENGTH OF 50Ø, WHERE Ø IS THE BAR TYPE 'T' OR 'R'
DIAMETER.
6. CONCRETE COVER FOR REINFORCEMENT NUMBER OF BARS
SHALL BE 60 mm.

EMPLOYER CONSULTANT CONTRACTOR Scale As shown Project Title UPPER ELAHERA CANAL PROJECT UECP-ICB-2A
Designed K.T. FROM 27+509KM TO 55+600KM INCLUDING 27.7KM LONG TUNNELS
Drawn A.D.J Drawing Title
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA 3m X 2.5m TRIPLE CELL BOX CULVERT @ CH 02+323.920
Checked C.J. 01 2021-09-16 SECOND SUBMISSION
MINISTRY OF IRRIGATION Sheet No. REV
CHINA STATE CONSTRUCTION ENGINEERING CORPORATIONApproved
PROGRAM MANAGEMENT,DESIGN AND SUPERVISION CONSULTANT LTD. Y.C.Z. 00 2021-08-19 FIRST SUBMISSION Drawing No. ICB2A-CSC-TECH-SPA-DD-STC-001-01
MAHAWELI WATER SECURITY INVENSTMENT PROGRAM 08 OF 10
(PMDSC) (CSCEC) Date 2021.09.16 REV DATE DESCRIPTION
LENGTH OF LENGTH OF
NO. OF NO. OF
BAR TYPE AND NO. OF TOTAL EACH SHAPE A* B* C* D* E* F/R* BAR TYPE AND NO. OF TOTAL EACH SHAPE A* B* C* D* E* F/R*
MEMBER
MARK SIZE
BARS IN
MBRS NO. BAR † CODE mm mm
BAR SHAPE MEMBER
MARK SIZE
BARS IN
MBRS NO. BAR † CODE mm mm
BAR SHAPE
EACH mm mm mm mm EACH mm mm mm mm
mm mm

A
01 T 20 36 01 36 9000 00 9000 A 16 T 12 30 01 30 10750 99 200 10380 200 100

C
B

A
A

C
02 T 16 36 01 36 10375 21 180 10080 180 17 T 12 30 01 30 10750 99 200 10380 200 100

C
B B

18 670 ~

A
03 T 20 36 01 36 8000 00 8000 A T 20 30 X 2 01 60 800 ~ 9450 11 180
(VERY) 9320 B

19 1210 ~

A
C

C
04 T 16 36 01 36 10375 21 180 10080 180 (VERY) T 16 30 X 2 01 60 1500 ~ 10150 21 180 180
B 9860 B

20 320 ~

A
BOX SECTION
C

C
05 T 16 70 X 02 01 140 3275 21 180 2980 180 (VERY) T 20 04 X 2 01 08 2450 ~ 3025 21 2050 180
B 900 B

21 320 ~

C
06 T 20 66 X 02 01 132 3325 11 1340 2050 (VERY) T 16 04 X 2 01 08 625 ~ 1200 21 180 180
B
900 B

22 1065 ~

A
A

C
07 T 16 70 x 4 01 280 3275 21 180 2980 180 (VERY) T 20 28 X 2 01 56 1190 ~ 8950 11 180
B 8820 B
BOX SECTION

23 2100 ~

C
08 T 20 64 x 2 01 128 3825 11 1840 2050 (VERY) T 16 28 X 2 01 56 2400 ~ 10150 21 180 180
B
9860 B

C
24 320 ~

C
09 T 12 53 x 12 01 636 1420 24 300 820 300 580 T 20 6X2 01 12 2450 ~ 3925 21 2050 180

D
B (VERY) 1810 B
A

25 320 ~

A
C

C
10 T 12 68 01 68 10700 21 180 10380 180 (VERY) T 16 6X2 01 12 600 ~ 2100 21 180 180
B 1810 B

C
11 T 12 51 01 51 10700 21 180 10380 180 NOTES:
B
1. ALL DIMENSIONS ARE IN MILLIMETERS.
2. THE CONCRETE SHALL BE G:C25/30.
3. ALL BARS MARKED "T" SHALL BE HIGH YIELD
DEFORMED BARS OF YIELD STRENGTH NOT
A

C
12 T 12 68 01 68 10700 21 180 10380 180 TO LESS THAN 460N/mm² .
B 4. ALL BARS MARKED "R" SHALL BE HOT
ROLLED MILD STEEL PLAIN BARS OF YIELD
STRENGTH NOT LESS THAN 250N/mm2.
5. BARS OF CUT LENGTH LARGER THAN THE
A

SUPPLIED LENGTH TO BE LAPPED WITH


C

13 T 12 51 01 51 10700 21 180 10380 180


B MINIMUM LENGTH OF 50Ø, WHERE Ø IS THE
DIAMETER.
6. CONCRETE COVER FOR REINFORCEMENT
D SHALL BE 60 mm.
A

14 T 12 30 01 30 10750 99 200 10380 200 100 * BAR NOTATIONS


C

B 5 T 10 - 06 - 150 T

D BAR LOCATION
A

BAR SPACING
15 T 12 30 01 30 10750 99 200 10380 200 100
C

B BAR MARK

BAR DIAMETER

BAR TYPE 'T' OR 'R'

NUMBER OF BARS

EMPLOYER CONSULTANT CONTRACTOR Scale As shown Project Title UPPER ELAHERA CANAL PROJECT UECP-ICB-2A
Designed K.T. FROM 27+509KM TO 55+600KM INCLUDING 27.7KM LONG TUNNELS
Drawn A.D.J Drawing Title
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA 3m X 2.5m TRIPLE CELL BOX CULVERT @ CH 02+323.920
Checked C.J. 01 2021-09-16 SECOND SUBMISSION
MINISTRY OF IRRIGATION Sheet No. REV
CHINA STATE CONSTRUCTION ENGINEERING CORPORATIONApproved
PROGRAM MANAGEMENT,DESIGN AND SUPERVISION CONSULTANT LTD. Y.C.Z. 00 2021-08-19 FIRST SUBMISSION Drawing No. ICB2A-CSC-TECH-SPA-DD-STC-001-01
MAHAWELI WATER SECURITY INVENSTMENT PROGRAM 09 OF 10
(PMDSC) (CSCEC) Date 2021.09.16 REV DATE DESCRIPTION
LENGTH OF LENGTH OF
NO. OF NO. OF
BAR TYPE AND NO. OF TOTAL EACH SHAPE A* B* C* D* E* F/R* BAR TYPE AND NO. OF TOTAL EACH SHAPE A* B* C* D* E* F/R*
MEMBER
MARK SIZE
BARS IN
MBRS NO. BAR † CODE mm mm
BAR SHAPE MEMBER
MARK SIZE
BARS IN
MBRS NO. BAR † CODE mm mm
BAR SHAPE
EACH mm mm mm mm EACH mm mm mm mm
mm mm

STREAM)
CUTOFF

(DOWN
WALL

A
A

C
25a T 20 12 x 02 01 24 11500 21 150 11300 150 36 T 12 57 01 57 1575 21 480 950 200

C
B B

A
BOX SECTION

C
25b T 16 12 x 02 01 24 11525 21 150 11300 150 34a T 12 09 01 09 11625 99 180 11300 180 80

C
B B

CUTOFF WALL
(UP STREAM)
A

A
C

C
26a T 20 12 x 02 01 24 11500 21 150 11300 150 35a T 12 57 01 57 1575 21 480 950 200
B B

A
A

C
26b T 16 12 x 02 01 24 11525 21 150 11300 150 36a T 12 57 01 57 1575 21 480 950 200

C
B B

A E
(5000m LENGTH)

(7x36x6)+

SHEAR HOOKS
R R

C
26 T 10 10 02 20 5425 21 280 4900 280 37 T 10 01 1944 375 99 50 50 180 50 50 32

B
WING WALL

D
B (2x36x6) C

A E
1 X 36 X R R

C
27 T 12 25 02 50 2650 21 300 2100 300 38 T 10 01 432 480 99 50 50 325 50 50 32

D
B 12 C
(10000m LENGTH)

C
26a T 10 10 02 20 10425 21 280 9900 280
WING WALL

C
27a T 12 50 02 100 2650 21 300 2100 300
B

28 T 12 06 02 12 6800 00 6800 A

D
CORBEL

E
29 T 16 45 02 90 2125 99 440 600 110 590 440 145

F
B

A
B

30 R 8 90 02 180 825 22 115 605 50 115


A

C
D NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. THE CONCRETE SHALL BE G:C25/30.
A

C
31 T 12 06 x 2 02 24 8825 00 100 8685 100 3. ALL BARS MARKED "T" SHALL BE HIGH YIELD
B
APPROACH SLAB

DEFORMED BARS OF YIELD STRENGTH NOT


TO LESS THAN 460N/mm² .
4. ALL BARS MARKED "R" SHALL BE HOT
ROLLED MILD STEEL PLAIN BARS OF YIELD
A

32 T 12 59 02 118 1050 21 100 910 100 STRENGTH NOT LESS THAN 250N/mm2.
B 5. BARS OF CUT LENGTH LARGER THAN THE
SUPPLIED LENGTH TO BE LAPPED WITH
MINIMUM LENGTH OF 50Ø, WHERE Ø IS THE
DIAMETER.
A

6. CONCRETE COVER FOR REINFORCEMENT


C

33 T 12 44 02 88 1050 21 100 910 100


B SHALL BE 60 mm.
* BAR NOTATIONS
D 5 T 10 - 06 - 150 T
(DOWN STREAM)

A
CUTOFF WALL

34 T 12 09 01 09 11625 99 180 11300 180 80


C

B BAR LOCATION
BAR SPACING

BAR MARK
A

35 T 12 57 01 57 1575 21 480 950 200 BAR DIAMETER


B
BAR TYPE 'T' OR 'R'

NUMBER OF BARS

EMPLOYER CONSULTANT CONTRACTOR Scale As shown Project Title UPPER ELAHERA CANAL PROJECT UECP-ICB-2A
Designed K.T. FROM 27+509KM TO 55+600KM INCLUDING 27.7KM LONG TUNNELS
Drawn A.D.J Drawing Title
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA 3m X 2.5m TRIPLE CELL BOX CULVERT @ CH 02+323.920
Checked C.J. 01 2021-09-16 SECOND SUBMISSION
MINISTRY OF IRRIGATION Sheet No. REV
CHINA STATE CONSTRUCTION ENGINEERING CORPORATIONApproved
PROGRAM MANAGEMENT,DESIGN AND SUPERVISION CONSULTANT LTD. Y.C.Z. 00 2021-08-19 FIRST SUBMISSION Drawing No. ICB2A-CSC-TECH-SPA-DD-STC-001-01
MAHAWELI WATER SECURITY INVENSTMENT PROGRAM 10 OF 10
(PMDSC) (CSCEC) Date 2021.09.16 REV DATE DESCRIPTION

You might also like