PROJECT

Pembangunan 6 (enam) Ruas Jalan Tol Dalam Kota Jakarta


Tahap I Ruas Semanan - Sunter Pulo Gebang
SEKSI A1 Kelapa Gading - Pulo Gebang
STA. 21+881 - STA. 31+168
SHOP DRAWING
GAMBAR DENAH HALTE TRANSJAKARTA
PASAR TIPAR
ARTERI ROAD

OWNER

KNOWN BY

C B

A A DATE
PULOGADUNG
SUPERVISI

250.0 500.0 500.0 500.0 500.0 500.0 500.0 500.0 300.0

500.0 500.0 250.0 250.0

OFFICE VM KSO. PT JAYA CM - VIRAMA KARYA - CIPTA STRADA


125.0 SERVER
TANGGA

Entrance
PASSENGER AREA
P09.61 P09.60
T

340.0
ILE

APPROVED BY
TO

RAMP IN
GATE ENTRY

BARNARD SAHAT HUTAPEA


Team Leader
1 2 3 4 5 6 7 8 9 10 11
DATE
C B CONTRACTOR
CAKUNG
DENAH HALTE TRANSJAKARTA
Skala 1 : 100

PT TEKWILKA JAKINDO

PURPOSED BY
CHECKED BY CHECKED BY DRAWN BY
KONTRAKTOR

Rommy Mars, ST Mulyo, ST Danang


Project Manager Technical Mng. Danang
Drafter
Drafter
DATE :
REVISION DATE NOTE

SKALA 1 : 100 REV.


REV.
DRAWING NUMBER PAGE

GBR/SD/38-39/1