PROJECT

KKB BUILDING A
RENOVATION
CLIENT

SEC
PT. BALI TURTLE ISLAND
DEVELOPMENT
CONTRACTOR

Jl. Mudutaki, no. 88, Badung, Bali - Indonesia. 80325

CONSULTANTS

FOR APPROVAL
STATUS SIGN

REV. DATE DESCRIPTION

1. 7 October 2022 Menambahkan Grase Trap di bawah sink

2. 14 October 2022 Menambahkan spesifikasi Grase Trap

3. 2 November 2022

3. 10 November 2022

DET

ISSUED FOR

SHOP DRAWING

SECTION A SECTION B DRAWN BY CHECKED BY

DEDY NALA

DATE REVISION

10/22/2022 3

SHEET TITLE

PANTRY DETAILS
PT. KURA KURA BALI DEVELOPMENT
DATE PARAF CM/OWNER

SCALE PAPER SIZE

1 : 20 A3

SHOP DRAWING

PROJECT CODE

05 PANTRY DETAILS DETAIL A APPROVED

APPROVED WITH COMMENT


KKB - EOA - 2022
REVISE AND RESUBMIT
COMPONENT SHEET NO
REJECTED

MO HKB. MEP. 0.05


THIS DRAWING IS COPYRIGHT. CONTRACTORS SHALL WORK FROM FIGURED DIMENSIONS ONLY. CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO ARCHITECTS.