You are on page 1of 1

INALUM DOCUMENT NO.

REVISION DATE REMARKS

UPGRADING POT TECHNOLOGY FOR 1 POT-LINE


DESIGN BY
AT INALUM REDUCTION PLANT
PT. WASKITA KARYA (Persero) Tbk
TEMPORARY WORKSHOP
SHENYANG ALUMINUM & MAGNESIUM ENGINEERING PT. WASKITA KARYA (Persero) Tbk
PROJECTION TYPE EPC DIVISION POSITION SIGNATURE DATE & RESEARCH INSTITUTE COMPANY LIMITED

A. ISSUED FOR RIVIEW/APPROVAL 07-12-2021 FRIST ANGLE PHASE


POSITION SIGNATURE DATE APP Gazali Ulfa D.D DEPT ENG
07-12-2021
R1. ISSUED FOR INTERNAL RIVIEW 09-09-2021 SIZE A3 SCALE NTS
APP Bistok Situmorang 07-12-2021 CHK A. Helmi Jaelani 07-12-2021 DRAWING LIST
R0. ISSUED FOR INTERNAL RIVIEW 24-08-2021 DRAWING NO. DRAWING TITLE DRAW TO NO REV.

ISSUED DESCRIPTION SAMI INALUM and HATCH REFERENCE DRAWING CHK Dea 07-12-2021 DES Dea 07-12-2021
REV. DATE DRAW NO WK/ENG/DED/TW/DWG/EL/00-01 A.

You might also like