THIS DOCUMENT HAS BEEN HANDOVERED FROM AKER SOLUTIONS TO PTSC M&C AFTER
DETAILED DESIGN
D4 29.10.19 RE-ISSUED FOR CONSTRUCTION APP/ NTT NCH DNL SAO VANG (SV) CENTRAL PROCESSING PLATFORM
D3 05.09.19 RE-ISSUED FOR CONSTRUCTION APP NCH DNL PROCESS EMERGENCY SHUTDOWN LOGIC DIAGRAM/ HIERARCHY
D2 11.04.19 RE-ISSUED FOR CONSTRUCTION APP NCH DNL
D1 25.10.18 APPROVED FOR CONSTRUCTION YZU TPH TR PROJECT TITLE:
05-1_EPC
C1 13.02.18 ISSUED FOR APPROVAL YZU TPH TR CONTRACTOR DETAIL ENGINEERING
COPYRIGHT © B1 25.08.17 ISSUED FOR REVIEW WYS / YZU TPH TR SAO VANG AND DAI NGUYET DEVELOPMENT PROJECT
THIS DRAWING REMAINS THE PROPERTY OF IGP AND MAY NOT BE COPIED IN ANY WAY - - A1 06.07.17 ISSUED FOR INTER-DISCIPLINE CHECK WYS / YZU TPH - - - SCALE DRAWING NO. SHEET REV
EXCEPT FOR FULLFILING THE SPECIFIC PURPOSE FOR WHICH IT IS ISSUED.
BY CHK'D APPR CONTRACTOR COMPANY A1
DRAWING NUMBER REFERENCE DRAWINGS REV DATE DESCRIPTION
DETAIL ENGINEERING CONSULTANT APP APP N.T.S 05-1_EPC-GE-AEI-P-XR-00001 1 OF 2 D4
D:\Dai Nguyet WHP Detailed Engineering\SV DD\SHUTDOWN HIERARCHY\D4\[05-1_EPC-GE-AEI-P-XR-00001_Rev D4_Process Emergency Shutdown Logic Diagram, Hierarchy-issue.xlsx]Content
Activation of APS
P.B. (via F&G)
LEVEL 4
ABANDONMENT
Permissive
(WHCP), or HP (via F&G)
NOTE 12 NOTE 4 NOTE 4 NOTE 12
Subsurface DRILLING RIG Gas in the Gas in the TR Pressurization GTC DRILLING RIG Fire/Gas Fire in the Fire in the Fire in the Fire in the Smoke in the
Fire in the Fire in the Fire in the Gas in the Gas in the ESD P.B. FIELD ESD Smoke in the
Shutdown PB ESD P.B. or PROCESS or TECH BLDG P.B in CCR or Enclosure Confirmed in TU TECH BLDG TECH BLDG LQ LQ TECH BLDG
WELL BAY PROCESS AREA UTILITIES AREA UTILITIES AREA LQ HVAC Intakes CCR P.B. LQ HVAC Intakes
(NOTE 13) Confirmed Fire WELL BAY HVAC Intakes Dining Room Fire Gas Riser Zone Switchrooms (excl. SwRm) Switchroom (exclud SwRm) HVAC Intakes
LEVEL 3
ESD
LEVEL 1
USD NOTE 10
19. If both lean TEG pumps are not running for more than 15 minutes, then PSD will be initiated on CPP‐SV.
20. Time delay (15 minutes ‐ adjustable) to be provided. The time delay gives operator enough response time to choke down production and safely control CPP‐SV to avoid PSD.
COMPANY
THIS DOCUMENT HAS BEEN HANDOVERED FROM AKER SOLUTIONS TO PTSC M&C AFTER DETAILED DESIGN SAO VANG (SV) CENTRAL PROCESSING PLATFORM COMPANY PROJECT
NO.
PROCESS EMERGENCY SHUTDOWN LOGIC DIAGRAM/ HIERARCHY
PROJECT TITLE:
CONTRACTOR DETAIL ENGINEERING
05-1_EPC
COPYRIGHT © SAO VANG AND DAI NGUYET DEVELOPMENT PROJECT
THIS DRAWING REMAINS THE PROPERTY OF IGP AND MAY NOT BE COPIED IN ANY - - SCALE DRAWING NO. SHEET REV
WAY EXCEPT FOR FULLFILING THE SPECIFIC PURPOSE FOR WHICH IT IS ISSUED.
A1
DRAWING NUMBER REFERENCE DRAWINGS N.T.S 05-1_EPC-GE-AEI-P-XR-00001 2 OF 2 D4
D:\Dai Nguyet WHP Detailed Engineering\SV DD\SHUTDOWN HIERARCHY\D4\[05-1_EPC-GE-AEI-P-XR-00001_Rev D4_Process Emergency Shutdown Logic Diagram, Hierarchy-issue.xlsx]Content