Professional Documents
Culture Documents
TRANSMITTAL SHEET
Subject SHOP DRAWINGS FOR CATLADDER 50A,50B, 51 & 52 & ROOF ACCESS HATCH DETAIL
DIC-Kim
Hyun
DN: cn=DIC-Kim Hyun, D[C4]TEL E&M
o=DIC-T222, ou=Project
Manager,
Hyun email=kimhyun@daelim.co.
DD SURVEY
kr, c=SG
Date: 2020.10.12 18:47:42 SPM DM
+08'00'
Date PM ARUP
SPE ARCHI
Received by Name EPE CD (ARIEL)
POIC (HANIE) ENGINEERS
Sign SAFETY File
Date
Drawings / Documents :
Drawing/Document No Rev Title Qty Size / Media
BASEMENT ROOF LEVEL 50A & 50B CATLADDER SETTING-
M/T222/OTP/ADMS/7931 A 1 (A1) Soft Copy
OUT PLAN
BASEMENT ROOF LEVEL 51 & 52 CATLADDER SETTING-OUT
M/T222/OTP/ADMS/7932 A 1 (A1) Soft Copy
PLAN
M/T222/OTP/ADMS/7933 A ROOF LEVEL DETAILED CATLADDER SETTING-OUT PLAN 1 (A1) Soft Copy
M/T222/OTP/ADMS/7934 A ROOF LEVEL DETAILED CATLADDER SETTING-OUT PLAN 1 (A1) Soft Copy
BASEMENT ROOF LEVEL CATLADDER 50A SETTING-OUT
M/T222/OTP/ADMS/7935 A 1 (A1) Soft Copy
BLOW-UP PLAN & DETAIL SECTION
BASEMENT ROOF LEVEL CATLADDER 50A SETTING-OUT
M/T222/OTP/ADMS/7953 A 1 (A1) Soft Copy
BLOW-UP PLAN & DETAIL SECTION
BASEMENT ROOF LEVEL CATLADDER 50B SETTING-OUT
M/T222/OTP/ADMS/7954 A 1 (A1) Soft Copy
BLOW-UP PLAN & DETAIL SECTION
BASEMENT ROOF LEVEL CATLADDER 51 SETTING-OUT
M/T222/OTP/ADMS/7955 A 1 (A1) Soft Copy
BLOW-UP PLAN & DETAIL SECTION
BASEMENT ROOF LEVEL CATLADDER 52 SETTING-OUT
M/T222/OTP/ADMS/7956 A 1 (A1) Soft Copy
BLOW-UP PLAN & DETAIL SECTION
BASEMENT ROOF LEVEL CATLADDER 47SETTING-OUT BLOW-
M/T222/OTP/ADMS/7957 _
UP PLAN & DETAIL SECTION
M/T222/OTP/ADMS/7958 A ROOF ACCESS HATCH DETAILED SECTION 1 (A1) Soft Copy
BASEMENT ROOF LEVEL CATLADDER SETTING-OUT
INTERMEDIATE LANDING BLOW-UP PLAN, ELEVATIONS &
M/T222/OTP/ADMS/7960 _ 1 EMAIL
DETAIL SECTIONS
SHOP DRAWINGS FOR CATLADDER 50A, 50B, 51, 52 & ROOF ACCESS HATCH DETAILS
CONTRACT T222,
CONSTRUCTION OF OUTRAM PARK STATION & TUNNELS
FOR THOMSON EAST COAST LINE
DIC-
Digitally signed by DIC-Ariel Digitally signed by
DIC-Ariel Tolentino
DN: c=SG, cn=DIC-Ariel HWAN Digitally signed by
HWANG CHI HOON
DIC-Kim Hyun
DN: cn=DIC-Kim
Kim
Tolentino, DN: cn=HWANG CHI Hyun, o=DIC-T222,
Tolentino
email=ariel.tolentino@daelim.c
o.kr G CHI HOON, o=DAELIM, ou,
email=chhwang@daeli
m.co.kr, c=SG
ou=Project Manager,
email=kimhyun@daeli
m.co.kr, c=SG
Hyun
Date: 2020.10.09 09:19:32
+08'00'
Ariel Tolentino HOON Date: 2020.10.12
18:48:17 +08'00'
Hwang, Chi Hoon
Date: 2020.10.12
18:47:57 +08'00'
Kim, Hyun
Project Coordinator (Archi) Design Manager Project manager
DOC. NO. : T222/DES/4328
Contract T222, REV. NO. : A
Construction of Outram Park Station & Tunnels for Thomson East
Coast Line
SHOP DRAWINGS FOR CATLADDER 50A, 50B, 51, 52 & ROOF ACCESS HATCH DETAILS
DAR Title: Shop drawing Submission for CATLADDER 50A,50B,51 & 52 ROOF ACCESS HATCH DETAIL
Reviewed by:
Comments
S/N Dwg/Doc No No. Contractor’s Reply Code
LTA Comment’s
1 General Comments 1.1 1. Please comment from QPS & QPD Drawing revised as per 2
comment
1.2 -1. Please submit PE endorsement for each drawing. Please refer to the drawing nos. 1
M/T222/OTP/ADMS/7931/A
M/T222/OTP/ADMS/7932/A
M/T222/OTP/ADMS/7933/A
M/T222/OTP/ADMS/7934/A
M/T222/OTP/ADMS/7953/A
M/T222/OTP/ADMS/7954/A
M/T222/OTP/ADMS/7955/A
M/T222/OTP/ADMS/7956/A
M/T222/OTP/ADMS/7957/
M/T222/OTP/ADMS/7958/A
M/T222/OTP/ADMS/7960/-
2 Shop Drawing for Catladder 2.1 - Please submit DGN file as per LTA cad standard requirements. Please note the DGN file is too 2
50A, 50B, 51, 52 and Roof big unable to send via EMAIL.
Access hatch Details We can send via
WETRANSFER but LTA not
allowed. That’s why we just
submitted the PDF.
REPLY TO COMMENT SHEET
DAR Title: Shop drawing Submission for CATLADDER 50A,50B,51 & 52 ROOF ACCESS HATCH DETAIL
Reviewed by:
Comments
S/N Dwg/Doc No No. Contractor’s Reply Code
-Please ensure to comply with cat ladder requirements. As per requirements we will
comply.
-All cat ladder ensure to comply with CDC requirements. Yes, Please refer to the
drawing
-Refer to attached mark-up with comments and please revise & re-submit. We will submit accordingly.
QP(S)
1. T222/DES/4328A -Please submit AEDAS and QPD) Arup comments ( if any) for our records. Ok, Noted Please refer to 2
drawing submission
-Please submit endorse by PE drawings. As per agreed by AE and LTA 2
during Archi-meeting, we will
re-submit the drawings with PE
endorsement once we clear
the approval.
-Please submit material 70x12mm SS bar support bracket 70x70x8mm SS Please refer to Material
mounting bracket, 150x150x10mm thk, base plate, FBN II M12 bolts, M16 submission MAT-4028 for
bolts, washer and nuts. Anchorage Bolt.
REPLY TO COMMENT SHEET
DAR Title: Shop drawing Submission for CATLADDER 50A,50B,51 & 52 ROOF ACCESS HATCH DETAIL
Reviewed by:
Comments
S/N Dwg/Doc No No. Contractor’s Reply Code
-Welding and mechanical anchorage bolt systems are required to be tested Noted
and to conform with LTA M&W specification.
AE Comments
Comment Code :
THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).
AEDAS'S REVIEW
THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.
ARUP'S REVIEW
THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.
FOR ACCEPTANCE
SHANGHAI
DAELIM
CHONG KEE
M/T222/OTP/ADMS/7931 A
SHOP DRAWING SUBMISSION
CONTRACTOR'S DECLARATION:
THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).
AEDAS'S REVIEW
THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.
ARUP'S REVIEW
THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.
FOR ACCEPTANCE
SHANGHAI
DAELIM
CHONG KEE
M/T222/OTP/ADMS/7932 A
SHOP DRAWING SUBMISSION
CONTRACTOR'S DECLARATION:
THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).
AEDAS'S REVIEW
THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.
ARUP'S REVIEW
THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.
FOR ACCEPTANCE
SHANGHAI
DAELIM
CHONG KEE
M/T222/OTP/ADMS7933 A
SHOP DRAWING SUBMISSION
CONTRACTOR'S DECLARATION:
THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).
AEDAS'S REVIEW
THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.
ARUP'S REVIEW
THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.
FOR ACCEPTANCE
SHANGHAI
DAELIM
CHONG KEE
M/T222/OTP/ADMS7934 A
A A
THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).
AEDAS'S REVIEW
THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.
A ARUP'S REVIEW
THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
A PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.
FOR ACCEPTANCE
SHANGHAI
DAELIM
CHONG KEE
M/T222/OTP/ADMS/7953 A
A
THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).
AEDAS'S REVIEW
THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.
ARUP'S REVIEW
THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.
FOR ACCEPTANCE
SHANGHAI
DAELIM
CHONG KEE
M/T222/OTP/ADMS/7954 A
A
A
THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).
AEDAS'S REVIEW
THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.
ARUP'S REVIEW
A
A
THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.
FOR ACCEPTANCE
SHANGHAI
DAELIM
CHONG KEE
M/T222/OTP/ADMS/7955 A
A
THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).
AEDAS'S REVIEW
THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.
ARUP'S REVIEW
A A
THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.
FOR ACCEPTANCE
SHANGHAI
DAELIM
CHONG KEE
M/T222/OTP/ADMS/7956 A
SHOP DRAWING SUBMISSION
CONTRACTOR'S DECLARATION:
THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).
ARUP'S REVIEW
THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.
FOR ACCEPTANCE
SHANGHAI
DAELIM
CHONG KEE
M/T222/OTP/ADMS/7957 -
8
4 5
ADMS7958A ADMS7958A
10
10
7
3
9
ADMS7958A
THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).
AEDAS'S REVIEW
THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
11
6 ARUP'S REVIEW
11
ADMS7958A
THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.
FOR ACCEPTANCE
SHANGHAI
DAELIM
CHONG KEE
M/T222/OTP/ADMS/7958 A
SHOP DRAWING SUBMISSION
CONTRACTOR'S DECLARATION:
THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).
AEDAS'S REVIEW
THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.
ARUP'S REVIEW
THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.
FOR ACCEPTANCE
SHANGHAI
DAELIM
CHONG KEE
M/T222/OTP/ADMS/7960 -