You are on page 1of 12

Daelim Industrial Co.

, Ltd Tel : +65 6595 1300


102A Eu Tong Sen Street #01-01 Fax : +65 6342 1360
Singapore 059820

TRANSMITTAL SHEET

Transmittal No.: T222/DES/4328- No. of Sheets 1 of 1

To : Land Transport Authority Project : Contract T222,


Thomson-East Coast Line(C4)-T222 Construction of Outram Park Station and
102A Eu Tong Sen Street Tunnels for Thomson-East Coast Line
#01-02, Singapore 059820

Attn: Mr. Tay Sze Beng


Engineer's Representative

We issue the following drawings / documents :

Subject SHOP DRAWINGS FOR CATLADDER 50A,50B, 51 & 52 & ROOF ACCESS HATCH DETAIL

Purpose: Acceptance/Approval √ Review Information Others

Response Required by : Engineer's Representative (T222)


Contractor's Transmittal
Reference NO: T222/TELC4/D19.005.000 ( )
Issued by Name Kim, Min Soo / Project Director SUBMISSION DATE:
Sign Info Act Reply Info Act Reply

DIC - Kim 디지털 서명자DIC - Kim Min Soo


DN: cn=DIC - Kim Min Soo, o=DIC -
T222, ou=Project Director,
D[C4]TEL
DD
E&M
SURVEY

Min Soo
email=mskim@daelim.co.kr, c=SG
날짜: 2020.04.22 09:45:16 +08'00' SPM DM
Date PM ARUP
SPE ARCHI
Received by Name EPE CD (ARIEL)
POIC (HANIE) ENGINEERS
Sign SAFETY File

Date
Drawings / Documents :
Drawing/Document No Rev Title Qty Size / Media
BASEMENT ROOF LEVEL 50A & 50B CATLADDER SETTING-
M/T222/OTP/ADMS/7931 _ 1 (A1) Soft Copy
OUT PLAN
BASEMENT ROOF LEVEL 51 & 52 CATLADDER SETTING-OUT
M/T222/OTP/ADMS/7932 _ 1 (A1) Soft Copy
PLAN

M/T222/OTP/ADMS/7933 _ ROOF LEVEL DETAILED CATLADDER SETTING-OUT PLAN 1 (A1) Soft Copy

M/T222/OTP/ADMS/7934 _ ROOF LEVEL DETAILED CATLADDER SETTING-OUT PLAN 1 (A1) Soft Copy
BASEMENT ROOF LEVEL CATLADDER 50A SETTING-OUT
M/T222/OTP/ADMS/7935 _ 1 (A1) Soft Copy
BLOW-UP PLAN & DETAIL SECTION
BASEMENT ROOF LEVEL CATLADDER 50A SETTING-OUT
M/T222/OTP/ADMS/7953 _ 1 (A1) Soft Copy
BLOW-UP PLAN & DETAIL SECTION
BASEMENT ROOF LEVEL CATLADDER 50B SETTING-OUT
M/T222/OTP/ADMS/7954 _ 1 (A1) Soft Copy
BLOW-UP PLAN & DETAIL SECTION
BASEMENT ROOF LEVEL CATLADDER 51 SETTING-OUT
M/T222/OTP/ADMS/7955 _ 1 (A1) Soft Copy
BLOW-UP PLAN & DETAIL SECTION
BASEMENT ROOF LEVEL CATLADDER 52 SETTING-OUT
M/T222/OTP/ADMS/7956 _ 1 (A1) Soft Copy
BLOW-UP PLAN & DETAIL SECTION

M/T222/OTP/ADMS/7958 _ ROOF ACCESS HATCH DETAILED SECTION 1 (A1) Soft Copy

1 EMAIL

Cc: 1 QP(S), 1 Arup


Contract T222, DOC. NO. : T222/DES/4328
Construction of Outram Park Station & Tunnels for Thomson East REV. NO. : -
Coast Line

SHOP DRAWINGS FOR CATLADDER 50A, 50B, 51, 52 & ROOF ACCESS HATCH DETAILS

CONTRACT T222,
CONSTRUCTION OF OUTRAM PARK STATION & TUNNELS
FOR THOMSON EAST COAST LINE

SHOP DRAWINGS FOR


CATLADDER 50A, 50B, 51, 52 &
ROOF ACCESS HATCH DETAILS

Prepared by Checked by Confirmed by

DIC-Ariel
Digitally signed by HWANG CHI
Digitally signed by DIC-Ariel
Tolentino
DN: c=SG, cn=DIC-Ariel Tolentino,
HWANG HOON
DN: cn=HWANG CHI HOON,
o=DAELIM, ou,
DIC - Kim 디지털 서명자DIC - Kim Min Soo
DN: cn=DIC - Kim Min Soo, o=DIC -
T222, ou=Project Director,

Tolentino CHI HOON Min Soo


email=ariel.tolentino@daelim.co.kr email=mskim@daelim.co.kr, c=SG
email=chhwang@daelim.co.kr,
날짜: 2020.04.22 09:45:36 +08'00'
Date: 2020.04.21 11:25:42 +08'00' c=SG
Date: 2020.04.21 13:37:31 +08'00'

Ariel Tolentino Hwang, Chi Hoon Kim, Min Soo


Project Coordinator
Archi Engineer(Archi) Design Manager Project Director
DOC. NO. : T222/DES/4328
Contract T222, REV. NO. : -
Construction of Outram Park Station & Tunnels for Thomson East
Coast Line

SHOP DRAWINGS FOR CATLADDER 50A, 50B, 51, 52 & ROOF ACCESS HATCH DETAILS

DOCUMENT REVISION LOG

Rev No Date Description of Revision

- 2020.15.04 First Issue


2

SHOP DRAWING SUBMISSION


CONTRACTOR'S DECLARATION:

THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).

AEDAS'S REVIEW

THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.

ARUP'S REVIEW

THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.

FOR ACCEPTANCE

SHANGHAI
DAELIM
CHONG KEE

TE17 OUTRAM PARK STATION

M/T222/OTP/ADMS/7131 -
SHOP DRAWING SUBMISSION
CONTRACTOR'S DECLARATION:

THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).

AEDAS'S REVIEW

THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.

ARUP'S REVIEW

THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.

FOR ACCEPTANCE

SHANGHAI
DAELIM
CHONG KEE

TE17 OUTRAM PARK STATION

M/T222/OTP/ADMS/7932 -
SHOP DRAWING SUBMISSION
CONTRACTOR'S DECLARATION:

THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).

AEDAS'S REVIEW

THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.

ARUP'S REVIEW

THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.

FOR ACCEPTANCE

SHANGHAI
DAELIM
CHONG KEE

TE17 OUTRAM PARK STATION

M/T222/OTP/ADMS7133- -
SHOP DRAWING SUBMISSION
CONTRACTOR'S DECLARATION:

THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).

AEDAS'S REVIEW

THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.

ARUP'S REVIEW

THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.

FOR ACCEPTANCE

SHANGHAI
DAELIM
CHONG KEE

TE17 OUTRAM PARK STATION

M/T222/OTP/ADMS7934- -
SHOP DRAWING SUBMISSION
CONTRACTOR'S DECLARATION:

THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).

AEDAS'S REVIEW

THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.

ARUP'S REVIEW

THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.

FOR ACCEPTANCE

SHANGHAI
DAELIM
CHONG KEE

TE17 OUTRAM PARK STATION

M/T222/OTP/ADMS/7953 -
SHOP DRAWING SUBMISSION
CONTRACTOR'S DECLARATION:

THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).

AEDAS'S REVIEW

THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.

ARUP'S REVIEW

THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.

FOR ACCEPTANCE

SHANGHAI
DAELIM
CHONG KEE

TE17 OUTRAM PARK STATION

M/T222/OTP/ADMS/7954 -
SHOP DRAWING SUBMISSION
CONTRACTOR'S DECLARATION:

THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).

AEDAS'S REVIEW

THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.

ARUP'S REVIEW

THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.

FOR ACCEPTANCE

SHANGHAI
DAELIM
CHONG KEE

TE17 OUTRAM PARK STATION

M/T222/OTP/ADMS/7955 -
SHOP DRAWING SUBMISSION
CONTRACTOR'S DECLARATION:

THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).

AEDAS'S REVIEW

THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.

ARUP'S REVIEW

THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.

FOR ACCEPTANCE

SHANGHAI
DAELIM
CHONG KEE

TE17 OUTRAM PARK STATION

M/T222/OTP/ADMS/7956 -
4

6
5

SHOP DRAWING SUBMISSION


CONTRACTOR'S DECLARATION:

THE CONTENTS IN THIS SUBMISSION HAVE BEEN PREPARED ACCORDING TO THE LATEST
WORKING AND APPROVED DRAWINGS. COORDINATION WITH ALL RELEVANT DISCIPLINES
AND PARTIES (ARCH, C&S, E&M SWC, ETC) HAVE BEEN CARRIED OUT AND ALL THEIR
REQUIREMENTS HAVE BEEN INCORPORATED INCLUDING ALSO RELATED INFORMATION
AND RESPONSES PROVIDED IN OTHER FORUMS (EG, RFI, DCR, EMAILS, MEETINGS ETC).

AEDAS'S REVIEW

THIS REVIEW IS FOR GENERAL COMPLIANCE WITH THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECTNESS OF
DIMENSIONS, QUANTITIES AND DETAILS, CORRECTNESS AND COMPATIBILITY OF
11 MATERIALS, METHOD OF MANUFACTURER AND EQUIPMENT USED IN THE INSTALLATION.
COMMENTS/CORRECTIONS WHERE MADE IN THIS REVIEW DO NOT RELIEVE CONTRACTOR
OF THE RESPONSIBILITY TO COMPLY WITH THE SPECIFICATIONS. THE ENDORSEMENT OF
THIS DRAWING DOES NOT IN ANY WAY CONSTITUTE AN ARCHITECT'S INSTRUCTION UNDER
THE CONTRACT NOR DOES IT AFFECT THE RESPONSIBILITY OF THE CONTRACTOR UNDER
THE CONTRACT. WHEN COMPLETED, THE SYSTEM SHALL OPERATE AS AN INTEGRAL
WHOLE AND SHALL PERFORM IN ACCORDANCE WITH THE SPEIFICATIONS.

ARUP'S REVIEW

THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E & M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING
WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING REVIEW.

FOR ACCEPTANCE

SHANGHAI
DAELIM
CHONG KEE

TE17 OUTRAM PARK STATION

M/T222/OTP/ADMS/7958 -

You might also like