You are on page 1of 11

SYDNEY METRO - WESTERN SYDNEY AIRPORT

STATION BOXES AND TUNNELLING WORKS


ORCHARD HILLS STATION
STRUCTURES
SBTTW0708
ORCHARD HILLS STATION - GENERAL ARRANGEMENT,
SPACE PROOFING, RUNNING SLAB AND THRUST
FOUNDATION

DRAWING LIST
DRAWING NUMBER DESCRIPTION
SMWSASBT-CPG-SWD-TU000-MS-DRG-070801 COVER SHEET
SMWSASBT-CPG-SWD-TU000-MS-DRG-070802 GENERAL ARRANGEMENT PLAN

File Path: Autodesk Docs://CPB_SM-WSA-SBT Delivery/SMWSASBT-CPG-SWD-TU000-MS-M3D-070801.rvt


SMWSASBT-CPG-SWD-TU000-MS-DRG-070803 GENERAL ARRANGEMENT SECTION
SMWSASBT-CPG-SWD-TU000-MS-DRG-070804 SLAB MAPPING AND CROSS SECTIONS
SMWSASBT-CPG-SWD-TU000-MS-DRG-070805 PERSPECTIVE
SMWSASBT-CPG-SWD-TU000-MS-DRG-070851 SLIDING SLAB CONSTRUCTION PHASE SHEET 1
SMWSASBT-CPG-SWD-TU000-MS-DRG-070852 SLIDING SLAB CONSTRUCTION PHASE SHEET 2
SMWSASBT-CPG-SWD-TU000-MS-DRG-070853 SLIDING SLAB CONSTRUCTION PHASE SHEET 3
SMWSASBT-CPG-SWD-TU000-MS-DRG-070854 CONCRETE AND DETAIL DRAWING
SMWSASBT-CPG-SWD-TU000-MS-DRG-070855 ALTERNATE STEEL SLIDING PLATFORM DRAWING SHEET 1
SMWSASBT-CPG-SWD-TU000-MS-DRG-070856 ALTERNATE STEEL SLIDING PLATFORM DRAWING SHEET 2
100mm AT FULL SIZE Plot Date & Time: 13/04/2023 3:09:45 pm

THIS PACKAGE IS TO BE READ IN CONJUNCTION WITH THE BELOW DRAWINGS IN PACKAGE SBTTW0701 FOR
COMPLETE DETAILS OF THE CONCRETE CONSTRUCTION WORKS.

DRAWING LIST
DRAWING NUMBER DESCRIPTION
SMWSASBT-CPG-SWD-TU000-MS-DRG-070190 TYPICAL CONCRETE AND REINFORCEMENT NOTES
SMWSASBT-CPG-SWD-TU000-MS-DRG-070191 TYPICAL SLAB REINFORCEMENT DETAILS

Title block Revision: v6.1


FOR CONSTRUCTION
SYDNEY METRO - WESTERN SYDNEY AIRPORT - STATION BOXES AND TUNNELLING WORKS
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: NOT TO SCALE other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN HARLYSON RAMOS 28 FEB 2023 STRUCTURES
DESIGNED LIAM FRASER 28 FEB 2023
01 TITLE BLOCK UPDATED LF SKB JR 11.04.23 COVER SHEET
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMWSASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 1 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone56 Height Datum: A.H.D This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. APPROVED JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070801 01
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING

N
SMWSASBT-CPG-SWD-TU000-MS-DRG-070302
2. GEOMETRY OF RL'S AND TUNNEL AXIS LINE
01
BASED ON REFERENCE SMWSASBT-CPG-SWD-
TU000-TU-M3D-010110 BY ARCADIS UPDATED
01/11/2022
3. ALL DIMENSION IN MILLIMETERS (mm)
REFER TO PART PLAN UNLESS NOTED OTHERWISE
4. ALL MEMBER CONCRETE SIZE OF SLAB AND
TENSION STRAP MCO LINE FOUNDATION DETAILS ARE BASED ON
PREVIOUS PROJECTS AND EXPERIENCE. ALL
SIZES AND DETAILING SUBJECT TO CHANGE
TUNNEL AXIS LINE THROUGHOUT DETAILED DESIGN PHASE.

5300
5. MCO MODEL BASED ON REFERENCE BIM360
BY ARC SMWSASBT-CPG-OHE-SN150-MS-
M3D-010103.rvt DATED 23/05/2022
6. TEMPORARY DRAINAGE BY OTHERS
7. TBM MUST BE VERIFIED FOR THE SUITABILITY
OF THE LATERAL SHIFT.

5300
TUNNEL AXIS LINE

*FOR STEEL WORK DETAILS,


REFER TO PACKAGE
SBTTW0701 & SBTTW0702
GENERAL ARRANGEMENT PLAN
SCALE 1 : 500

37700

STEEL THRUST RING


SLIDING STEEL PLATFORM REFER TO START OF BLINDING SUPPORT - 300mm TO MCO LAUNCH FRAME
SMWSASBT-CPG-SWD-TU000-MS-DRG-070855
BLIND RINGS SUPPORT STEELWORK HIGH STRENGTH MODULE 2
CRADLE FOR PARALLEL TO TANGENT OF
MCO LINE ST1 SEGMENT FEEDER TUNNEL TERMINATION

2-A 3-A
4-A

1850
1987

1568
4-B

275
1000 12000
1400

1m MODULE 1 2 - 6m MODULE 1 S.O.P.


(EDGE OF THRUST RING & MCO LEVEL) TUNNEL AXIS LINE 275
5026

5300

File Path: Autodesk Docs://CPB_SM-WSA-SBT Delivery/SMWSASBT-CPG-SWD-TU000-MS-M3D-070801.rvt


9268
1400

REFER PACKAGE 1 (SBTTW0701) FOR DETAILED


SET OUT OF LAUNCH FRAME FROM S.O.P.
275

2400
1187
2-B 3-B 4-C
21474

2374
100mm AT FULL SIZE Plot Date & Time: 13/04/2023 3:10:21 pm

8561

1187
2400
275 275
1400

9268
275

5300
SLAB THK: 510mm SLAB THK: 235mm TUNNEL AXIS LINE
3913

1400

275 275

1568
1987

1850
LEGEND:
MCO MINIMUM CLEAR OPENING
2-C 3-C TUNNEL AXIS LINE
MCO LINE
MODULE 2 - HIGH STRENGTH
19791 13207

Title block Revision: v6.1


PART PLAN
SCALE 1 : 100
FOR CONSTRUCTION
SYDNEY METRO - WESTERN SYDNEY AIRPORT - STATION BOXES AND TUNNELLING WORKS
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: As indicated other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN HARLYSON RAMOS 28 FEB 2023 STRUCTURES
01 REVISED TO ALIGN THE TUNNEL AXIS LINE AS PER CONTRACTOR'S LF SKB JR 11.04.23 LIAM FRASER 28 FEB 2023
DESIGNED
DRAWING/MODEL REFERENCES GENERAL ARRANGEMENT PLANS
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMWSASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 2 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone56 Height Datum: A.H.D This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. APPROVED JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070802 01
NOTES:
LOADING NOTES: 1. FOR GENERAL NOTES, REFER TO DRAWING
SMWSASBT-CPG-SWD-TU000-MS-DRG-070302
1. REFER TO SMWSASBT-CPG-SWD-TU000-MS-DRG-070203 BLIND RINGS
2. GEOMETRY OF RL'S AND TUNNEL AXIS LINE
TEMPORARY SUPPORT LOADS. 01
BASED ON REFERENCE SMWSASBT-CPG-SWD-
2. REFER TO SMWSASBT-CPG-SWD-TU000-MS-DRG-070106 MODULE 1
TU000-TU-M3D-010110 BY ARCADIS UPDATED
LOADS AT LAUNCH AREA FROM TBM SHIELD.
01/11/2022
3. REFER TO SMWSASBT-CPG-SWD-TU000-MS-DRG-070106 MODULE 1
3. ALL DIMENSION IN MILLIMETERS (mm)
LOADS FROM BACKUP GANTRY.
UNLESS NOTED OTHERWISE
4. REFER TO SMWSASBT-CPG-SWD-TU000-MS-DRG-070105 FOR MODULE
4. ALL MEMBER CONCRETE SIZE OF SLAB AND
1 LOADS BEHIND LAUNCH FRAME.
FOUNDATION DETAILS ARE BASED ON
5. REFER TO SMWSASBT-CPG-SWD-TU000-MS-DRG-070104 FOR LAUNCH
PREVIOUS PROJECTS AND EXPERIENCE. ALL
FRAME LOADS.
SIZES AND DETAILING SUBJECT TO CHANGE
6. REFER TO SMWSASBT-CPG-SWD-TU000-MS-DRG-070170 FOR
THROUGHOUT DETAILED DESIGN PHASE.
SEGMENT FEEDER RAIL LOADS.
5. MCO MODEL BASED ON REFERENCE BIM360
BY ARC SMWSASBT-CPG-OHE-SN150-MS-
M3D-010103.rvt DATED 23/05/2022
6. TEMPORARY DRAINAGE BY OTHERS
7. TBM MUST BE VERIFIED FOR THE SUITABILITY
OF THE LATERAL SHIFT.

PARALLEL TO TANGENT
A MCO LINE
37700 OF TUNNEL TERMINATION
070803
18000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000
18000
CAPPING BEAM LEVEL 3 - 6m MODULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MODULE
SSL 39.235
3 - 6m MODULE
TOCB
TANGENT LINE
37.050 m
TUNNEL AXIS LINE

BASE SLAB LEVEL


SSL 27.270

T.O.C 28.400 T.O.C 28.504 T.O.C 28.553 T.O.C 28.687 T.O.C 28.731 T.O.C 28.776 T.O.C 28.820 T.O.C 28.865 T.O.C 28.910 T.O.C 28.912 T.O.C 28.913 T.O.C 28.914
T.O.C 28.086 T.O.C 28.191 T.O.C 28.296 T.O.C 28.597 T.O.C 28.642
T.O.C 27.877 T.O.C 27.982
T.O.C 27.773
01 T.O.C 27.526 T.O.C 27.668

SECTION 1
SCALE 1 : 250 070806

37700
AXIS
SLAB PARALLEL TO TANGENT OF TUNNEL 24000 PARALLEL TO TANGENT OF
13400 4 - 6m MODULE 1 TUNNEL LINE TERMINATION
300
23800
CAPPING BEAM LEVEL 13600 6000
SSL 39.235 6000
6000 1 - 6m MODULE 1
6000 1 - 6m MODULE 1
MCO LINE 1 - 6m MODULE 1

File Path: Autodesk Docs://CPB_SM-WSA-SBT Delivery/SMWSASBT-CPG-SWD-TU000-MS-M3D-070801.rvt


1 - 6m MODULE 1
CL CL
TOCB
37.050 m UST RING
200mm - START OF MODULE 1 BEFORE THR 900 900 1055 1092

THRUST RING
CONCRETE SEGMENT RING (BLIND RING) LAUNCH FRAME
HEAD WALL PROJECTION
BLIND RINGS SUPPORT STEELWORK
MCO LINE PROJECTION
100mm AT FULL SIZE Plot Date & Time: 13/04/2023 3:10:26 pm

ST1

TUNNEL AXIS LINE

MODULE 2 ON MODULE 1
EL 27.400 01 01
T.O.C 27.065 01
EDGE OF THRUST RING & T.O.C 26.879
MCO LEVEL
01
BASE SLAB LEVEL T.O.C 26.357
903 36
SSL 27.270
36

T.O.C 27.527
CL 01
01
T.O.C 25.867 13310 T.O.C 26.788
13324 T.O.C 26.279 LEGEND:
01 T.O.C. TOP OF CONCRETE
510mm INFILL SLAB / STEEL SLIDING PLATFORM STRUT FOUNDATION BY OTHER.
INDICATIVELY SHOWN ONLY. MCO MINIMUM CLEAR OPENING
TUNNEL AXIS LINE
SLAB BY OTHERS NOTE: AFTER SLIDING STEEL PLATFORM IS IN ITS FINAL POSITION, MCO LINE
INDICATIVELY SHOWN ONLY THE GAP IS TO BE FILLED USING STEEL PACKING PLATES. TANGENT LINE
510mm THK INFILL SLAB BY EIC
CONCRETE SLAB BY OTHERS

DETAIL A

Title block Revision: v6.1


SCALE 1 : 100 070803

FOR CONSTRUCTION
SYDNEY METRO - WESTERN SYDNEY AIRPORT - STATION BOXES AND TUNNELLING WORKS
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: As indicated other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN HARLYSON RAMOS 28 FEB 2023 STRUCTURES
01 REVISED TO ALIGN THE TUNNEL AXIS LINE AS PER CONTRACTOR'S LF SKB JR 11.04.23 LIAM FRASER 28 FEB 2023
DESIGNED
DRAWING/MODEL REFERENCES GENERAL ARRANGEMENT SECTION
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMSWASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 3 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone56 Height Datum: A.H.D This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. APPROVED JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070803 01
4 2 3
- - - NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
SMWSASBT-CPG-SWD-TU000-MS-DRG-070302

N
2. GEOMETRY OF RL'S AND TUNNEL AXIS LINE
01
BASED ON REFERENCE SMWSASBT-CPG-SWD-
TU000-TU-M3D-010110 BY ARCADIS UPDATED
01/11/2022
3. ALL DIMENSION IN MILLIMETERS (mm)
UNLESS NOTED OTHERWISE
4. ALL MEMBER CONCRETE SIZE OF SLAB AND
FOUNDATION DETAILS ARE BASED ON
PREVIOUS PROJECTS AND EXPERIENCE. ALL
SIZES AND DETAILING SUBJECT TO CHANGE
THROUGHOUT DETAILED DESIGN PHASE.
5. MCO MODEL BASED ON REFERENCE BIM360
BY ARC SMWSASBT-CPG-OHE-SN150-MS-
M3D-010103.rvt DATED 23/05/2022
6. TEMPORARY DRAINAGE BY OTHERS
7. TBM MUST BE VERIFIED FOR THE SUITABILITY
OF THE LATERAL SHIFT.
SLAB MAPPING
SCALE 1 : 500

CAPPING BEAM LEVEL CAPPING BEAM LEVEL


SSL 39.235 SSL 39.235

TOCB TOCB
37.050 m 37.050 m
TBM SHIELD OUTLINE

MCO LINE
BLIND RING SUPPORT MCO LINE
STEELWORK
CL CL CL CL

4500 6237 6237 4500

6237 6237

m
80
3.4
MODULE 2 TUNNEL AXIS LEVEL TUNNEL AXIS LEVEL

2-C
2-A

2-B

TUNNEL AXIS LINE TUNNEL AXIS LINE


MODULE 1

3-C
BLIND RING TEMPORARY

3-A

3-B
SUPPORT FRAME

MODULE 1 ST1

BASE SLAB LEVEL BASE SLAB LEVEL


SSL 27.270 SSL 27.270

01
475

510
T.O.C 26.767
CRADLE FOR SEGMENT
SLIDING STEEL PLATFORM FEEDER
510mm THK INFILL SLAB
01 T.O.C 26.429 SLAB FOUNDATION BY
REFER TO SHEET SMWSASBT- 1216 1752 1216 4145 4145 1216 1752 1216
SLAB FOUNDATION BY OTHER. OTHER. INDICATIVELY
CPG-SWD-TU000-MS-DRG-070855 1280 5651 1280 2131 2131 1280 5651 1280 INDICATIVELY SHOWN ONLY SHOWN ONLY

File Path: Autodesk Docs://CPB_SM-WSA-SBT Delivery/SMWSASBT-CPG-SWD-TU000-MS-M3D-070801.rvt


REINFORCEMENT DETAILS FOR
SECTION 4 THE INFILL SLAB REFER TO SHEET
SMWSASBT-CPG-SWD-TU000-MS-DRG-070854
SECTION 2
SCALE 1 : 10 SCALE 1 : 10

CAPPING BEAM LEVEL


SSL 39.235
100mm AT FULL SIZE Plot Date & Time: 13/04/2023 3:10:34 pm

TOCB
37.050 m
MCO LINE

CL CL

6237 6237

TUNNEL AXIS LEVEL TUNNEL AXIS LEVEL


4-C
4-A

4-B

TENSION STRAP LEGEND:


MODULE 1 01
T.O.C. TOP OF CONCRETE
MCO MINIMUM CLEAR OPENING
T.O.C 27.309
TUNNEL AXIS LINE
MCO LINE
BASE SLAB LEVEL
SSL 27.270
STEEL SLIDING PLATFORM
510mm THK INFILL SLAB BY EIC
CONCRETE SLAB BY OTHERS
SLAB FOUNDATION BY OTHER.
2100 2100 4137 4137 2100 2100 INDICATIVELY SHOWN ONLY.

Title block Revision: v6.1


SECTION 3
SCALE 1 : 10

FOR CONSTRUCTION
SYDNEY METRO-WESTERN SYDNEY AIRPORT-STATION BOXES AND TUNNELLING WORKS
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: As indicated other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN HARLYSON RAMOS 28 FEB 2023 STRUCTURES
01 REVISED TO ALIGN THE TUNNEL AXIS LINE AS PER CONTRACTOR'S LF SKB JR 11.04.23 LIAM FRASER 28 FEB 2023
DESIGNED
DRAWING/MODEL REFERENCES SLAB MAPPING
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMWSASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 4 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone56 Height Datum: A.H.D. This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. APPROVED JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070804 01
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING

ORCHARD HILLS STATION PERSPECTIVE


SMWSASBT-CPG-SWD-TU000-MS-DRG-070302
2. GEOMETRY OF RL'S AND TUNNEL AXIS LINE
01 BASED ON REFERENCE SMWSASBT-CPG-SWD-
TU000-TU-M3D-010110 BY ARCADIS UPDATED
01/11/2022
3. ALL DIMENSION IN MILLIMETERS (mm)
UNLESS NOTED OTHERWISE
4. ALL MEMBER CONCRETE SIZE OF SLAB AND
FOUNDATION DETAILS ARE BASED ON
PREVIOUS PROJECTS AND EXPERIENCE. ALL
SIZES AND DETAILING SUBJECT TO CHANGE
THROUGHOUT DETAILED DESIGN PHASE.
5. MCO MODEL BASED ON REFERENCE BIM360
BY ARC SMWSASBT-CPG-OHE-SN150-MS-
M3D-010103.rvt DATED 23/05/2022
6. TEMPORARY DRAINAGE BY OTHERS
7. TBM MUST BE VERIFIED FOR THE SUITABILITY
OF THE LATERAL SHIFT.
PROJECT WIDE LAUNCHING AND TRAVERSING
PROJECT WIDE - THRUST RING, THRUST FRAME, MODULES, SEGMENT FEEDER, STEEL DOLLY

TEMPORARY SHORING WALL BY OTHER

RUNNING SLAB BY OTHERS

File Path: Autodesk Docs://CPB_SM-WSA-SBT Delivery/SMWSASBT-CPG-SWD-TU000-MS-M3D-070801.rvt


100mm AT FULL SIZE Plot Date & Time: 13/04/2023 3:10:36 pm

STEEL SLIDING SLAB

Title block Revision: v6.1


FOR CONSTRUCTION
SYDNEY METRO - WESTERN SYDNEY AIRPORT - STATION BOXES AND TUNNELLING
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: NOT TO SCALE other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN HARLYSON RAMOS 28 FEB 2023 STRUCTURES
01 REVISED TO ALIGN THE TUNNEL AXIS LINE AS PER CONTRACTOR'S LF SKB JR 11.04.23 LIAM FRASER 28 FEB 2023
DESIGNED
DRAWING/MODEL REFERENCES PERSPECTIVE
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMWSASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 5 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone56 Height Datum: A.H.D This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. APPROVED JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070805 01
NOTES:
1. TBM MUST BE VERIFIED FOR THE SUITABILITY OF THE LATERAL SHIFT.
2. ALL BUTT WELDED SPLICES ON THE SLIDING PLATE ARE TO BE GRINDED FLUSH.
GREASED CONTACT FACE 3. PRIOR TO THE INSTALLATION OF THE SLIDING PLATE, THE SURFACE OF THE
5 6 7
N
(ASSUMED LUBRICATED STEEL TO STEEL CONCRETE IS TO BE SURVEYED AND LEVEL.
- FRICTION COEFFICIENT = 0.25)
- -
20mm THK STEEL SLIDE PLATE

300 300 150 5mm THK GROUT

4 ALLFASTENERS EF500R+ & THREADED

510
ROD GALV 8.8 M24 INJECTION EPOXY ANCHOR.

ㅤ90
MIN
MINIMUM EMBEDMENT DEPTH OF ANCHORS TO
BE MINIMUM 175mm

12mm POWERS COUNTERSUNK


BLUE-TIP SCREW BOLT
@300mm c/c STAGGERED
(MIN 90mm EMBEDMENT DEPTH)
DETAIL B
SCALE 1 : 10 -

510

PLAN - PRE STAGE 1-1 PLAN - PRE STAGE 1-2


SCALE 1 : 200 SCALE 1 : 200

10.6

2
75.55°

20
15

9.4
C 500 20mm THK STEEL SLIDE PLATE
20mm THK STEEL PLATE @ EQ c/c (APPROX. 2662mm) L CL

100
WITH 12mm POWERS COUNTERSUNK BLUE-TIP SCREW 300
5mm THK LEVELLING GROUT
BOLT @ 300mm c/c STAGGERED CL CL
(MIN 90mm EMBEDMENT DEPTH)
B 12mm POWERS COUNTERSUNK STEEL SLIDING PLATFORM

25
BLUE-TIP SCREW BOLT
-
@300mm c/c STAGGERED
1987 12000 5500 1987 (MIN 90mm EMBEDMENT DEPTH)
12
MIN MIN 1987 12000 5500 1987
2513 2513

SECTION 6
SECTION 5 SCALE 1 : 10 -
SECTION 7
SCALE 1 : 100 - SLIDER PLATE FULL PENETRATION BUTT WELD. SCALE 1 : 100 -
SURFACE TO BE GRINDED FLUSH

File Path: Autodesk Docs://CPB_SM-WSA-SBT Delivery/SMWSASBT-CPG-SWD-TU000-MS-M3D-070801.rvt


150 150 20mm STEEL SLIDING PLATE


45.0

20
GAP 3mm 12mm POWERS COUNTERSUNK
BLUE-TIP SCREW BOLT
@300mm c/c STAGGERED
(MIN 90mm EMBEDMENT DEPTH)
100mm AT FULL SIZE Plot Date & Time: 13/04/2023 3:10:44 pm

FULL PENETRATION BUTT WELD DETAIL


SCALE 1 : 5

20mm THK STEEL PLATE @ EQ c/c (APPROX. 2662mm)


WITH 12mm POWERS COUNTERSUNK BLUE-TIP SCREW
@ 300mm c/c STAGGERED (MIN 90mm EMBEDMENT DEPTH)

STEEL SLIDING PLATFORM REFER TO DRAWING


ADDITIONAL 16mm THK PLATE @ FACE SMWSASBT-CPG-SWD-TU000-MS-DRG-070855

120
00m
m

3D VIEW - PRE STAGE 1-1 3D VIEW - PRE STAGE 1-2


REFER TO FULL PENETRATION SCALE SCALE
BUTT WELD DETAIL NOTE:
NOTES: 1. FABRICATE AND POSITION THE STEEL SLIDING
B 1. BASE SLAB BY OTHER TO BE PLATFORM ON THE SLIDING PLATES

- CONSTRUCTED.
2. 6 NOS. OF 20MM THK SLIDE
PLATE (@2662mm c/c approx) AT BASE

Title block Revision: v6.1


AND 1 NOS. OF 16mm THK
SLIDE PLATE AT FACE

ORCHADILS_MCO P102
ORCHADILS_MCO P70
FOR CONSTRUCTION

Y=62591.86
X=29184.0
SYDNEY METRO - WESTERN SYDNEY AIRPORT - STATION BOXES AND TUNELLING WORKS
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: As indicated other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN MARK MUTIA 28 FEB 2023 STRUCTURES
DESIGNED LIAM FRASER 28 FEB 2023
01 TITLE BLOCK UPDATED LF SKB JR 11.04.23 SLIDING SLAB CONSTRUCTION PHASE SHEET 1
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMWSASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 6 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by

TD
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone56 Height Datum: A.H.D This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070851
1 PLATFORM_POINT

APPROVED 01
X=291847.4984
Y=6259026.1866

86,9736°
PC

PROJECT
8 NOTES:
1. TBM MUST BE VERIFIED FOR THE SUITABILITY OF THE LATERAL SHIFT. 9
070852 4 NOS. CHECK PLATE INSTALLED 2. CONNECTION OF COATES' HYDRAULIC STRUT TO BG&E RC SLAB TO BE COORDINATED. 070852
ON CONCRETE FACE 3. FACE OF CHECKPLATE TO BE SURVEYED BEFORE COMMENCING HYDRAULIC PUSH.

N
2-A 3-A PROP NOTES: 2-A 3-A
4-A 4-A
1. INSTALLATION AND OPERATION AS PER MANUFACTURER'S / SUPPLIER'S RECOMMENDATION.
962 3600 4110 3100 1543
2. OPERATION MUST BE SYNCHRONOUS TO AVOID ANY OVERLOADING TO ANY PROP ORPLATFORM STRUCTURE.
02 3. OPERATION SHALL BE CARRIED OUT IN A CONTROLLED ENVIRONMENT AND CHECKED ON REGULAR
4-B 4-B
INTERVALS SO SKEWING OF THE PLATFORM MUST NOT OCCUR.
903 13310
4. OPERATION MUST BE SLOW AND SMOOTH TO AVOID ANY JERK / ROLLING OF TBM.
TUNNEL AXIS LINE 5. MAX OPERATING SPEED OF THE TBM PUSH IS NOT TO EXCEED 5mm/min (TBC). TUNNEL AXIS LINE

9550
2-B 3-B 4-C 2-B 3-B 4-C

9550

9550
TUNNEL AXIS LINE TUNNEL AXIS LINE

2-C 3-C 2-C 3-C


962 3600 4110 3100 1543

PLAN - STAGE 1 PLAN - STAGE 2


SCALE 1 : 200 SCALE 1 : 200
MP150 HYDRAULIC STRUT
CL CL ARRANGEMENT TO SPECIALIST'S CL CL
DESIGN AND SPECIFICATION

COORDINATION OF END
CONNECTION BY COATES AND BG&E

CENTERLINE

340
MP150 STRUT ARRANGEMENT
ALLOW 25mm GAP ALLOWANCE

10
AT EACH END 12537 1987
STEEL SLIDING PLATFORM
1987 11230 6270 1987
SLAB TO BE
2355
DESIGNED BY BG&E
C STEEL SLIDING PLATFORM

4NOS.CHECKPLATE INSTALLED ON 12000


-
SECTION C
CONCRETE FACE. SCALE 1 : 20 -
FACE OF CHECKPLATE TO BE SURVEYED
BEFORE COMMENCING HYDRAULIC PUSH
(2355mm FROM CL)
SECTION 8 SECTION 9
SCALE 1 : 100 -
SCALE 1 : 100

NOTES:

File Path: Autodesk Docs://CPB_SM-WSA-SBT Delivery/SMWSASBT-CPG-SWD-TU000-MS-M3D-070801.rvt


NOTE :HYDRAULIC ARRANGEMENT IS INDICATIVE ONLY. DETAILS TO SPECIALIST'S DESIGN
1. THE FRICTION COEFFICIENT BETWEEN THE SLIDING SLAB AND SLIDING PLATE HAS BEEN
CONSIDERED AS STEEL-ON-STEEL CONTRACT WITH GREASE.
2. HYDRAULIC ARRANGEMENT IS INDICATIVE ONLY. DETAILS TO SPECIALIST'S DESIGN
100mm AT FULL SIZE Plot Date & Time: 13/04/2023 3:10:54 pm

MP150 HYDRAULIC STRUT ARRANGEMENT


MP150 HYDRAULIC STRUT ARRANGEMENT TO SPECIALIST'S DESIGN
TO SPECIALIST'S DESIGN

3D VIEW - STAGE 2
3D VIEW - STAGE 1 SCALE
SCALE

NOTES: NOTES:
1. INSTALL MODULE 1s ON THE STEEL 1. SPECIALIST TO PROVIDE THE METHOD STATEMENT FOR
SLIDING PLATFORM. THE EXTENSION SEQUENCING OF THE STRUTS TO POSITION
2. INSTALL 4 nos. OF MP150 STRUT THE SLIDING PLATFORM IN THE DESIRED POSITION.
ARRANGEMENTS. TO SPECIALIST'S 2. HYDRAULIC STRUTS TO POSITION THE SLIDING STEEL
DETAILS. PLATFORM TO THE FINAL POSITION.
3. LIFT/ASSEMBLE THE TBM IN-SITU ON 3. SPECIALIST TO CONTROL THE HYDRAULIC STRUTS TO

Title block Revision: v6.1


THE MODULE 1s. PREVENT SKEWING OF THE STEEL PLATFORM.

FOR CONSTRUCTION
SYDNEY METRO - WESTERN SYDNEY AIRPORT - STATION BOXES AND TUNNELLING WORKS
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: As indicated other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN MARK MUTIA 28 FEB 2023 STRUCTURES
02 ADDITIONAL INFORMATION AS CLOUDED LF SKB JR 11.04.23 LIAM FRASER 28 FEB 2023
DESIGNED
01 ADDITIONAL INFORMATION / CLARIFICATION LF SKB JR 08.03.23 SLIDING SLAB CONSTRUCTION PHASE SHEET 2
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMWSASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 7 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone56 Height Datum: A.H.D This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. APPROVED JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070852 02
NOTE:
10 1. TBM MUST BE VERIFIED FOR SUITABILITY OF THE LATERAL SHIFT.
11

N
- -

2-A 3-A 2-A 3-A


4-A 4-A

4-B 4-B

TUNNEL AXIS LINE TUNNEL AXIS LINE

2-B 3-B 4-C 2-B 3-B 4-C


9550

TUNNEL AXIS LINE TUNNEL AXIS LINE

SLAB THK: 200+475+35mm

2-C 3-C 2-C 3-C

PLAN - STAGE 3 PLAN - POST STAGE 3-1


SCALE 1 : 200 SCALE 1 : 200
CL CL CL
CL

REST OF THE SLAB TO BE CAST


5026 12474

STEEL SLIDING PLATFORM

SECTION 10 STEEL SLIDING PLATFORM SECTION 11


SCALE 1 : 100 - SCALE 1 : 100 -

File Path: Autodesk Docs://CPB_SM-WSA-SBT Delivery/SMWSASBT-CPG-SWD-TU000-MS-M3D-070801.rvt


100mm AT FULL SIZE Plot Date & Time: 13/04/2023 3:11:09 pm

3D VIEW - STAGE 3 3D VIEW - POST STAGE 3-1


SCALE SCALE
NOTES:
NOTE:
1.GAPS BETWEEN THE STEEL SLIDING
1. INSTALL THE BLIND RING TEMPORARY SUPPORTS AND
SLAB AND SURROUNDING IN-SITU SLABS TO
MODULE 1s ON THE COMPLETED SLAB.
BE GROUTED USING A HIGH STRENGTH
NON-SHRINK GROUT (min 40MPa).
2.INSTALL THE MODULE 1 AT THE REAR OF
THE STEEL SLIDING SLAB.

Title block Revision: v6.1


FOR CONSTRUCTION
SYDNEY METRO - WESTERN SYDNEY AIRPORT - STATION BOXES AND TUNNELLING WORKS
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: As indicated other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN MARK MUTIA 28 FEB 2023 STRUCTURES
DESIGNED LIAM FRASER 28 FEB 2023
01 TITLE BLOCK UPDATED LF SKB JR 11.04.23 SLIDING SLAB CONSTRUCTION PHASE SHEET 3
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMWSASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 8 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone56 Height Datum: A.H.D This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. APPROVED JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070853 01
0
N
STEEL SLIDING PLATFORM

12
-

STEEL SLIDING PLATFORM

30mm THK END PLATE


REFER TO DRAWING SMWSASBT-
CPG-SWD-TU000-070855 SECTION 15
33

STEEL SLIDING PLATFORM


PRIMARY MEMBER

510
25mm GAP BELOW PRIMARY BEAM INFILL SLAB BY EIC
AND BETWEEN INFILL SLAB TO BE
FILLED USING HIGH STRENGTH
NON-SHRINK GROUT (MIN 40MPa)

SLAB BY OTHERS

DETAIL D
SCALE 1 : 10 -

LEGEND:

File Path: Autodesk Docs://CPB_SM-WSA-SBT Delivery/SMWSASBT-CPG-SWD-TU000-MS-M3D-070801.rvt


21
T.O.C. TOP OF CONCRETE

CONCRETE PLAN STAGE 3 MCO MINIMUM CLEAR OPENING


TUNNEL AXIS LINE
CONCRETE PLAN STAGE 1 SCALE 1 : 100 MCO LINE
STEEL SLIDING PLATFORM
SCALE 1 : 100 510mm THK INFILL SLAB BY EIC
CONCRETE SLAB BY OTHERS
100mm AT FULL SIZE Plot Date & Time: 13/04/2023 3:11:38 pm

STEEL SLIDING PLATFORM REFER TO DRAWING


SMWSASBT-CPG-SWD-TU000-MS-DRG-07855
02
1111

D 133 140 140 140 900 280 280 900 140 140 140

- 3N16 ADDITIONAL EQUALLY SPACED AS


N20-140 T2 N16-200 T1 N20-200 T2 N20-200 T2 PRACTICALLY POSSIBLE (NOT TO BE BUNDLED)
N20-200 T2
N16-200 Z-BARS N20-200 T1

N20-200 Z-BARS
02

275
LAP LENGTH N20-200 T2 LAP LENGTH
N20-200 T1
ADJACENT CONCRETE
SLAB, MIN f'c = 40MPa

02
N20-200 U-BARS 2N12-100 CLOSED LINKS N20-200 B1
N16-200 B2 N16-200 B1
N20-140 B2 LAP LENGTH N16-200 B2 N20-200 B2 LAP LENGTH N20-200 B2 LAP LENGTH 2N12-100 CLOSED LINKS

Title block Revision: v6.1


CONCRETE REINFORCEMENT SECTION 12
SCALE 1 : 20 -

FOR CONSTRUCTION

0 SYDNEY METRO - WESTERN SYDNEY AIRPORT - STATION BOXES AND TUNNELLING WORKS
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: As indicated other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN MARK MUTIA 28 FEB 2023 STRUCTURES
02 CONCRETE REINFORCEMENT SECTION 12 NOT ON HOLD AND LF SKB JR 11.04.23

0
DETAILED LIAM FRASER 28 FEB 2023
DESIGNED
01 ADDITIONAL INFORMATION / CLARIFICATION LF SKB JR 08.03.23 CONCRETE AND DETAIL DRAWING
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMWSASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 9 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone56 Height Datum: A.H.D. This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. APPROVED JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070854 02
50
13 17 17
- - G F 153 25 245 25 153

35 13250 - - 30
6-22 DIA BOLT HOLES
FOR M20 8.8/s BOLTS (TYP.)
100 50 75 75 75 75 50 100
00
20

32
330 1000 1750 2000 2000 2000 2000 1750 420

33
195
6-M20 BOLTS TO BE UTILISED

125
265
00
ON COATES PROPRIETARY MP150 20
150 140 140 1390 360 1640 360 1390 360 360 1390 360 1640 360 1390 360 100 END PLATE.

150

580
360 360 360 140 140

150
495
00
20

125

265

125
33
110
STEEL CATCHMENT ASSEMBLY 00
SEE DRAWING SMWSASBT-CPG- 20

32
SWD-TU000-MS-DRG-070856 100 400 100 300 300

SBA2
SECTION "19" AND DETAIL "H"
50
17
SECTION 15 SECTION 16
SCALE 1 : 10 - SCALE 1 : 10 - 00
10
220 220 220 14 220 280 220 220 220
-

18
070856
NOTE: MODULE 1 NOT SHOWN FOR CLARITY

927 3600 4110 3100 1513


3D VIEW - STEEL SLIDING PLATFORM
FULL PENETRATION BUTT WELD. E PRIMARY BEAM SCALE
NOTE: MODULE 1 NOT SHOWN FOR CLARITY SURFACE TO BE GRINDED FLUSH -
SLIDING PLATFORM LAYOUT PLAN 45.0
0° WEB OR FLANGE
25mm THK STIFFENER WITH
360 70 70 360
SCALE 1 : 50 12mm FW TO PRIMARY BEAM 4-39DIA BOLT HOLES FOR
M36 8.8/s BOLTS (TYP.)

55
3mm GAP t = THICKNESS OF WEB OR FLANGE
2x25mm THK STIFFENER WITH
25mm THK STIFFENER WITH 12mm FW BOTH SIDES TO
FULL PENETRATION BUTT WELD SPLICE DETAIL FULL PENETRATION BUTT PRIMARY / SECONDARY BEAMS
SCALE 1 : 5
15
WELD

2120 2120 - 20mm THK INTERNAL STIFFENER


WITH 10mm FW BOTH SIDES TO

590
1993 1996 PRIMARY BEAM
30mm THK END PLATE
16
348

MODULE 1
PRIMARY BEAM
0m

-
mR
ADI

PRIMARY BEAM
U

MP150 HYDRAULIC STRUT


S

BY SPECIALIST DESIGN

55
SECONDARY BEAM 2x30mm THK STIFFENER WITH
12mm FW BOTH SIDES TO
944

944
STEEL SLIDING PLATE PRIMARY / SECONDARY BEAMS
260 29

File Path: Autodesk Docs://CPB_SM-WSA-SBT Delivery/SMWSASBT-CPG-SWD-TU000-MS-M3D-070801.rvt


SECONDARY BEAM

SBA2 BOLT HOLES


DETAIL E DETAIL G
SCALE 1 : 10 - SCALE 1 : 10 -

SLIDING PLATFORM CROSS SECTION 13 SET-OUT 2355mm TO CL


SCALE 1 : 20 -

180 180 4-39DIA BOLT HOLES FOR


M36 8.8/s BOLTS (TYP.)
100mm AT FULL SIZE Plot Date & Time: 13/04/2023 3:11:50 pm

55
MODULE 1
MODULE 1 CHECKPLATE IN LINE WITH MP150 STRUT
2x25mm THK STIFFENER WITH
(TOTAL 4 NOS).
12mm FW BOTH SIDES TO
MP150 HYDRAULIC STRUT PRIMARY / SECONDARY BEAMS STIFFENER 220mm/280mm SPACING TO
TO SPECIALIST'S DESIGN ALIGN WITH THE ABOVE MODULE
1 STIFFENER AT CONNECTIONS
20mm THK INTERNAL STIFFENER
WITH 10mm FW BOTH SIDES TO
590

PRIMARY BEAM

150
PRIMARY BEAM

140
GAPS BETWEEN INSITU CONCRETE
55

AND STEEL PLATFORM TO BE


2x30mm THK STIFFENER WITH FILLED USING HIGH STRENGTH
12mm FW BOTH SIDES TO NON-SHRINK GROUT (MIN 40MPa)

220
350

PRIMARY / SECONDARY BEAMS

1:1 CHAMFERED EDGE


SECONDARY BEAM

NOTE: WITH THE EXCEPTION OF SECONDARY BEAM


H
30mm THK END PLATE. REFER SECTION 15 FOR DETAILS ASSEMBLY 2 (SBA2) LOCATION, ALL OTHER BOLT HOLE 070856
1:1 CHAMFERED EDGE
25mm THK STIFFENER WITH SETTING OUT TO FOLLOW THIS DRAWING
FULL PENETRATION BUTT WELD
STEEL SLIDING PLATE PRIMARY / SECONDARY CONNECTION DETAIL 17

Title block Revision: v6.1


25mm THK STIFFENER WITH
12mm FW TO PRIMARY BEAM SCALE 1 : 10 -
PRIMARY BEAM
DETAIL F
HYDRAULIC STRUT TO STEEL PLATFORM CONNECTION 14 SCALE 1 : 10 -

-
FOR CONSTRUCTION
SCALE 1 : 10

SYDNEY METRO - WESTERN SYDNEY AIRPORT - STATION BOXES AND TUNNELLING WORKS
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: As indicated other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN JENNIE-LYN GUEVARRA 28 FEB 2023 STRUCTURES
02 TITLE BLOCK UPDATED LF SKB JR 11.04.23 LIAM FRASER 28 FEB 2023
DESIGNED
01 ADDITIONAL INFORMATION / CLARIFICATION LF SKB JR 08.03.23 ALTERNATE STEEL SLIDING PLATFORM DRAWING SHEET 1
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMWSASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 10 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone56 Height Datum: A.H.D. This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. APPROVED JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070855 02
MODULE 1

16mm THK STEEL FACE PLATE AT END OF MODULE 1


PRIMARY BEAMS

6M MODULE 1 BEYOND STEEL PLATFORM TO ONLY BE


INSTALLED AFTER THE STEEL PLATFORM IS IN THE
FINAL POSITION AND GROUTING HAS BEEN COMPLETED.
70 70 360
GREASED CONTACT FACE 360

01 903 30mm GAP


35 16
GAPS BETWEEN INSITU CONCRETE AND STEEL
PLATFORM TO BE FILLED USING HIGH STRENGTH NON-
INCLINE SHRINK GROUT (MIN 40MPa)
INCLINE

495
220
280
220
220

END STOP BY BG&E

25
15mm GAP
01
CONCRETE LEVEL
01 CONCRETE LEVEL T.O.C 26.279
T.O.C 25.867 1000

GAPS BETWEEN INSITU CONCRETE


GAPS BETWEEN INSITU CONCRETE AND AND STEEL PLATFORM TO BE FILLED
20mm THK STEEL PLATE WITH 12mm
STEEL PLATFORM TO BE FILLED USING USING HIGH STRENGTH GROUT (MPa)
16mm THK STEEL PLATE WITH COUNTERSUNK BLUE-TIP ANCHOR @300mm c/c
HIGH STRENGTH GROUT (MPa)
12mm COUNTERSUNK STAGGERED (MIN 90mm EMBEDMENT DEPTH)
BLUE-TIP ANCHOR @300mm c/c STAGGERED
(MIN 90mm EMBEDMENT DEPTH)

FRONT SLIDER PLATE - STEEL 18


SCALE 1 : 10 070855

19
-

18 10
FULL PENETRATION BUTT WELD. 10 120
SURFACE TO BE GRINDED FLUSH

150
40MPa NON-SHRINK GROUT
0° WEB OR FLANGE (THICKNESS TO CONFIRM ON SITE)
45.0
100x100x10mm SHS

20
t

File Path: Autodesk Docs://CPB_SM-WSA-SBT Delivery/SMWSASBT-CPG-SWD-TU000-MS-M3D-070801.rvt


SET-OUT 2355mm TO CL 180x180x10mm THK PLATE
3mm GAP t = THICKNESS OF WEB OR FLANGE

140
700

510
25

4-12mm CARBON STEEL POWERS


BLUE-TIP SCREW BOLT (MIN 75mm
180

20
256 EMBEDMENT DEPTH)
375
20 20

17.3
10mm THK STEEL PLATES.

20
495

1:1 CHAMFERED 10.5 REFER TO SECTION 19 FOR DETAILS


20

220
LEADING EDGE 180x180x10MM
260
260

20 THK STEEL PLATE

140

180
100mm AT FULL SIZE Plot Date & Time: 13/04/2023 3:11:57 pm

100x100x10mm SHS WITH


105 490 105 6mm FW TO PLATE

20
2X250UC89.5 (SIDE BY SIDE) MAY BE USED
IN LIEU OF THE BUILT-UP RHS 20 140 20

STEEL SLIDING PLATFORM STEEL SLIDING PLATFORM


PRIMARY BEAM CROSS SECTION SECONDARY BEAM CROSS SECTION SECTION 19 DETAIL H
SCALE 1 : 10 SCALE 1 : 10 SCALE 1 : 5 - SCALE 1 : 5 070855

NOTE: ALL WELDS FOR BUILT-UP MEMBERS NOTE: ALL WELDS FOR BUILT-UP MEMBERS
ARE FULL PENETRATION BUTT WELDS ARE FULL PENETRATION BUTT WELDS

Title block Revision: v6.1


FOR CONSTRUCTION
SYDNEY METRO - WESTERN SYDNEY AIRPORT - STATION BOXES AND TUNNELLING WORKS
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: As indicated other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN JENNIE-LYN GUEVARRA 28 FEB 2023 STRUCTURES
01 REVISED TO ALIGN THE TUNNEL AXIS LINE AS PER CONTRACTOR'S LF SKB JR 11.04.23 LIAM FRASER 28 FEB 2023
DESIGNED
DRAWING/MODEL REFERENCES ALTERNATE STEEL SLIDING PLATFORM DRAWING SHEET 2
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMWSASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 11 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone16 Height Datum: A.H.D. This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. APPROVED JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070856 01

You might also like