DRAWING LIST
DRAWING NUMBER DESCRIPTION
SMWSASBT-CPG-SWD-TU000-MS-DRG-070801 COVER SHEET
SMWSASBT-CPG-SWD-TU000-MS-DRG-070802 GENERAL ARRANGEMENT PLAN
THIS PACKAGE IS TO BE READ IN CONJUNCTION WITH THE BELOW DRAWINGS IN PACKAGE SBTTW0701 FOR
COMPLETE DETAILS OF THE CONCRETE CONSTRUCTION WORKS.
DRAWING LIST
DRAWING NUMBER DESCRIPTION
SMWSASBT-CPG-SWD-TU000-MS-DRG-070190 TYPICAL CONCRETE AND REINFORCEMENT NOTES
SMWSASBT-CPG-SWD-TU000-MS-DRG-070191 TYPICAL SLAB REINFORCEMENT DETAILS
N
SMWSASBT-CPG-SWD-TU000-MS-DRG-070302
2. GEOMETRY OF RL'S AND TUNNEL AXIS LINE
01
BASED ON REFERENCE SMWSASBT-CPG-SWD-
TU000-TU-M3D-010110 BY ARCADIS UPDATED
01/11/2022
3. ALL DIMENSION IN MILLIMETERS (mm)
REFER TO PART PLAN UNLESS NOTED OTHERWISE
4. ALL MEMBER CONCRETE SIZE OF SLAB AND
TENSION STRAP MCO LINE FOUNDATION DETAILS ARE BASED ON
PREVIOUS PROJECTS AND EXPERIENCE. ALL
SIZES AND DETAILING SUBJECT TO CHANGE
TUNNEL AXIS LINE THROUGHOUT DETAILED DESIGN PHASE.
5300
5. MCO MODEL BASED ON REFERENCE BIM360
BY ARC SMWSASBT-CPG-OHE-SN150-MS-
M3D-010103.rvt DATED 23/05/2022
6. TEMPORARY DRAINAGE BY OTHERS
7. TBM MUST BE VERIFIED FOR THE SUITABILITY
OF THE LATERAL SHIFT.
5300
TUNNEL AXIS LINE
37700
2-A 3-A
4-A
1850
1987
1568
4-B
275
1000 12000
1400
5300
2400
1187
2-B 3-B 4-C
21474
2374
100mm AT FULL SIZE Plot Date & Time: 13/04/2023 3:10:21 pm
8561
1187
2400
275 275
1400
9268
275
5300
SLAB THK: 510mm SLAB THK: 235mm TUNNEL AXIS LINE
3913
1400
275 275
1568
1987
1850
LEGEND:
MCO MINIMUM CLEAR OPENING
2-C 3-C TUNNEL AXIS LINE
MCO LINE
MODULE 2 - HIGH STRENGTH
19791 13207
PARALLEL TO TANGENT
A MCO LINE
37700 OF TUNNEL TERMINATION
070803
18000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000
18000
CAPPING BEAM LEVEL 3 - 6m MODULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MOD ULE 1 - 6m MODULE
SSL 39.235
3 - 6m MODULE
TOCB
TANGENT LINE
37.050 m
TUNNEL AXIS LINE
T.O.C 28.400 T.O.C 28.504 T.O.C 28.553 T.O.C 28.687 T.O.C 28.731 T.O.C 28.776 T.O.C 28.820 T.O.C 28.865 T.O.C 28.910 T.O.C 28.912 T.O.C 28.913 T.O.C 28.914
T.O.C 28.086 T.O.C 28.191 T.O.C 28.296 T.O.C 28.597 T.O.C 28.642
T.O.C 27.877 T.O.C 27.982
T.O.C 27.773
01 T.O.C 27.526 T.O.C 27.668
SECTION 1
SCALE 1 : 250 070806
37700
AXIS
SLAB PARALLEL TO TANGENT OF TUNNEL 24000 PARALLEL TO TANGENT OF
13400 4 - 6m MODULE 1 TUNNEL LINE TERMINATION
300
23800
CAPPING BEAM LEVEL 13600 6000
SSL 39.235 6000
6000 1 - 6m MODULE 1
6000 1 - 6m MODULE 1
MCO LINE 1 - 6m MODULE 1
THRUST RING
CONCRETE SEGMENT RING (BLIND RING) LAUNCH FRAME
HEAD WALL PROJECTION
BLIND RINGS SUPPORT STEELWORK
MCO LINE PROJECTION
100mm AT FULL SIZE Plot Date & Time: 13/04/2023 3:10:26 pm
ST1
MODULE 2 ON MODULE 1
EL 27.400 01 01
T.O.C 27.065 01
EDGE OF THRUST RING & T.O.C 26.879
MCO LEVEL
01
BASE SLAB LEVEL T.O.C 26.357
903 36
SSL 27.270
36
T.O.C 27.527
CL 01
01
T.O.C 25.867 13310 T.O.C 26.788
13324 T.O.C 26.279 LEGEND:
01 T.O.C. TOP OF CONCRETE
510mm INFILL SLAB / STEEL SLIDING PLATFORM STRUT FOUNDATION BY OTHER.
INDICATIVELY SHOWN ONLY. MCO MINIMUM CLEAR OPENING
TUNNEL AXIS LINE
SLAB BY OTHERS NOTE: AFTER SLIDING STEEL PLATFORM IS IN ITS FINAL POSITION, MCO LINE
INDICATIVELY SHOWN ONLY THE GAP IS TO BE FILLED USING STEEL PACKING PLATES. TANGENT LINE
510mm THK INFILL SLAB BY EIC
CONCRETE SLAB BY OTHERS
DETAIL A
FOR CONSTRUCTION
SYDNEY METRO - WESTERN SYDNEY AIRPORT - STATION BOXES AND TUNNELLING WORKS
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: As indicated other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN HARLYSON RAMOS 28 FEB 2023 STRUCTURES
01 REVISED TO ALIGN THE TUNNEL AXIS LINE AS PER CONTRACTOR'S LF SKB JR 11.04.23 LIAM FRASER 28 FEB 2023
DESIGNED
DRAWING/MODEL REFERENCES GENERAL ARRANGEMENT SECTION
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMSWASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 3 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone56 Height Datum: A.H.D This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. APPROVED JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070803 01
4 2 3
- - - NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
SMWSASBT-CPG-SWD-TU000-MS-DRG-070302
N
2. GEOMETRY OF RL'S AND TUNNEL AXIS LINE
01
BASED ON REFERENCE SMWSASBT-CPG-SWD-
TU000-TU-M3D-010110 BY ARCADIS UPDATED
01/11/2022
3. ALL DIMENSION IN MILLIMETERS (mm)
UNLESS NOTED OTHERWISE
4. ALL MEMBER CONCRETE SIZE OF SLAB AND
FOUNDATION DETAILS ARE BASED ON
PREVIOUS PROJECTS AND EXPERIENCE. ALL
SIZES AND DETAILING SUBJECT TO CHANGE
THROUGHOUT DETAILED DESIGN PHASE.
5. MCO MODEL BASED ON REFERENCE BIM360
BY ARC SMWSASBT-CPG-OHE-SN150-MS-
M3D-010103.rvt DATED 23/05/2022
6. TEMPORARY DRAINAGE BY OTHERS
7. TBM MUST BE VERIFIED FOR THE SUITABILITY
OF THE LATERAL SHIFT.
SLAB MAPPING
SCALE 1 : 500
TOCB TOCB
37.050 m 37.050 m
TBM SHIELD OUTLINE
MCO LINE
BLIND RING SUPPORT MCO LINE
STEELWORK
CL CL CL CL
6237 6237
m
80
3.4
MODULE 2 TUNNEL AXIS LEVEL TUNNEL AXIS LEVEL
2-C
2-A
2-B
3-C
BLIND RING TEMPORARY
3-A
3-B
SUPPORT FRAME
MODULE 1 ST1
01
475
510
T.O.C 26.767
CRADLE FOR SEGMENT
SLIDING STEEL PLATFORM FEEDER
510mm THK INFILL SLAB
01 T.O.C 26.429 SLAB FOUNDATION BY
REFER TO SHEET SMWSASBT- 1216 1752 1216 4145 4145 1216 1752 1216
SLAB FOUNDATION BY OTHER. OTHER. INDICATIVELY
CPG-SWD-TU000-MS-DRG-070855 1280 5651 1280 2131 2131 1280 5651 1280 INDICATIVELY SHOWN ONLY SHOWN ONLY
TOCB
37.050 m
MCO LINE
CL CL
6237 6237
4-B
FOR CONSTRUCTION
SYDNEY METRO-WESTERN SYDNEY AIRPORT-STATION BOXES AND TUNNELLING WORKS
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: As indicated other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN HARLYSON RAMOS 28 FEB 2023 STRUCTURES
01 REVISED TO ALIGN THE TUNNEL AXIS LINE AS PER CONTRACTOR'S LF SKB JR 11.04.23 LIAM FRASER 28 FEB 2023
DESIGNED
DRAWING/MODEL REFERENCES SLAB MAPPING
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMWSASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 4 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone56 Height Datum: A.H.D. This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. APPROVED JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070804 01
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
510
ROD GALV 8.8 M24 INJECTION EPOXY ANCHOR.
ㅤ90
MIN
MINIMUM EMBEDMENT DEPTH OF ANCHORS TO
BE MINIMUM 175mm
510
10.6
2
75.55°
20
15
9.4
C 500 20mm THK STEEL SLIDE PLATE
20mm THK STEEL PLATE @ EQ c/c (APPROX. 2662mm) L CL
100
WITH 12mm POWERS COUNTERSUNK BLUE-TIP SCREW 300
5mm THK LEVELLING GROUT
BOLT @ 300mm c/c STAGGERED CL CL
(MIN 90mm EMBEDMENT DEPTH)
B 12mm POWERS COUNTERSUNK STEEL SLIDING PLATFORM
25
BLUE-TIP SCREW BOLT
-
@300mm c/c STAGGERED
1987 12000 5500 1987 (MIN 90mm EMBEDMENT DEPTH)
12
MIN MIN 1987 12000 5500 1987
2513 2513
SECTION 6
SECTION 5 SCALE 1 : 10 -
SECTION 7
SCALE 1 : 100 - SLIDER PLATE FULL PENETRATION BUTT WELD. SCALE 1 : 100 -
SURFACE TO BE GRINDED FLUSH
0°
45.0
20
GAP 3mm 12mm POWERS COUNTERSUNK
BLUE-TIP SCREW BOLT
@300mm c/c STAGGERED
(MIN 90mm EMBEDMENT DEPTH)
100mm AT FULL SIZE Plot Date & Time: 13/04/2023 3:10:44 pm
120
00m
m
- CONSTRUCTED.
2. 6 NOS. OF 20MM THK SLIDE
PLATE (@2662mm c/c approx) AT BASE
ORCHADILS_MCO P102
ORCHADILS_MCO P70
FOR CONSTRUCTION
Y=62591.86
X=29184.0
SYDNEY METRO - WESTERN SYDNEY AIRPORT - STATION BOXES AND TUNELLING WORKS
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: As indicated other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN MARK MUTIA 28 FEB 2023 STRUCTURES
DESIGNED LIAM FRASER 28 FEB 2023
01 TITLE BLOCK UPDATED LF SKB JR 11.04.23 SLIDING SLAB CONSTRUCTION PHASE SHEET 1
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMWSASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 6 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by
TD
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone56 Height Datum: A.H.D This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070851
1 PLATFORM_POINT
APPROVED 01
X=291847.4984
Y=6259026.1866
86,9736°
PC
PROJECT
8 NOTES:
1. TBM MUST BE VERIFIED FOR THE SUITABILITY OF THE LATERAL SHIFT. 9
070852 4 NOS. CHECK PLATE INSTALLED 2. CONNECTION OF COATES' HYDRAULIC STRUT TO BG&E RC SLAB TO BE COORDINATED. 070852
ON CONCRETE FACE 3. FACE OF CHECKPLATE TO BE SURVEYED BEFORE COMMENCING HYDRAULIC PUSH.
N
2-A 3-A PROP NOTES: 2-A 3-A
4-A 4-A
1. INSTALLATION AND OPERATION AS PER MANUFACTURER'S / SUPPLIER'S RECOMMENDATION.
962 3600 4110 3100 1543
2. OPERATION MUST BE SYNCHRONOUS TO AVOID ANY OVERLOADING TO ANY PROP ORPLATFORM STRUCTURE.
02 3. OPERATION SHALL BE CARRIED OUT IN A CONTROLLED ENVIRONMENT AND CHECKED ON REGULAR
4-B 4-B
INTERVALS SO SKEWING OF THE PLATFORM MUST NOT OCCUR.
903 13310
4. OPERATION MUST BE SLOW AND SMOOTH TO AVOID ANY JERK / ROLLING OF TBM.
TUNNEL AXIS LINE 5. MAX OPERATING SPEED OF THE TBM PUSH IS NOT TO EXCEED 5mm/min (TBC). TUNNEL AXIS LINE
9550
2-B 3-B 4-C 2-B 3-B 4-C
9550
9550
TUNNEL AXIS LINE TUNNEL AXIS LINE
COORDINATION OF END
CONNECTION BY COATES AND BG&E
CENTERLINE
340
MP150 STRUT ARRANGEMENT
ALLOW 25mm GAP ALLOWANCE
10
AT EACH END 12537 1987
STEEL SLIDING PLATFORM
1987 11230 6270 1987
SLAB TO BE
2355
DESIGNED BY BG&E
C STEEL SLIDING PLATFORM
NOTES:
3D VIEW - STAGE 2
3D VIEW - STAGE 1 SCALE
SCALE
NOTES: NOTES:
1. INSTALL MODULE 1s ON THE STEEL 1. SPECIALIST TO PROVIDE THE METHOD STATEMENT FOR
SLIDING PLATFORM. THE EXTENSION SEQUENCING OF THE STRUTS TO POSITION
2. INSTALL 4 nos. OF MP150 STRUT THE SLIDING PLATFORM IN THE DESIRED POSITION.
ARRANGEMENTS. TO SPECIALIST'S 2. HYDRAULIC STRUTS TO POSITION THE SLIDING STEEL
DETAILS. PLATFORM TO THE FINAL POSITION.
3. LIFT/ASSEMBLE THE TBM IN-SITU ON 3. SPECIALIST TO CONTROL THE HYDRAULIC STRUTS TO
FOR CONSTRUCTION
SYDNEY METRO - WESTERN SYDNEY AIRPORT - STATION BOXES AND TUNNELLING WORKS
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: As indicated other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN MARK MUTIA 28 FEB 2023 STRUCTURES
02 ADDITIONAL INFORMATION AS CLOUDED LF SKB JR 11.04.23 LIAM FRASER 28 FEB 2023
DESIGNED
01 ADDITIONAL INFORMATION / CLARIFICATION LF SKB JR 08.03.23 SLIDING SLAB CONSTRUCTION PHASE SHEET 2
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMWSASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 7 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone56 Height Datum: A.H.D This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. APPROVED JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070852 02
NOTE:
10 1. TBM MUST BE VERIFIED FOR SUITABILITY OF THE LATERAL SHIFT.
11
N
- -
4-B 4-B
12
-
510
25mm GAP BELOW PRIMARY BEAM INFILL SLAB BY EIC
AND BETWEEN INFILL SLAB TO BE
FILLED USING HIGH STRENGTH
NON-SHRINK GROUT (MIN 40MPa)
SLAB BY OTHERS
DETAIL D
SCALE 1 : 10 -
LEGEND:
D 133 140 140 140 900 280 280 900 140 140 140
N20-200 Z-BARS
02
275
LAP LENGTH N20-200 T2 LAP LENGTH
N20-200 T1
ADJACENT CONCRETE
SLAB, MIN f'c = 40MPa
02
N20-200 U-BARS 2N12-100 CLOSED LINKS N20-200 B1
N16-200 B2 N16-200 B1
N20-140 B2 LAP LENGTH N16-200 B2 N20-200 B2 LAP LENGTH N20-200 B2 LAP LENGTH 2N12-100 CLOSED LINKS
FOR CONSTRUCTION
0 SYDNEY METRO - WESTERN SYDNEY AIRPORT - STATION BOXES AND TUNNELLING WORKS
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: As indicated other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN MARK MUTIA 28 FEB 2023 STRUCTURES
02 CONCRETE REINFORCEMENT SECTION 12 NOT ON HOLD AND LF SKB JR 11.04.23
0
DETAILED LIAM FRASER 28 FEB 2023
DESIGNED
01 ADDITIONAL INFORMATION / CLARIFICATION LF SKB JR 08.03.23 CONCRETE AND DETAIL DRAWING
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMWSASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 9 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone56 Height Datum: A.H.D. This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. APPROVED JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070854 02
50
13 17 17
- - G F 153 25 245 25 153
35 13250 - - 30
6-22 DIA BOLT HOLES
FOR M20 8.8/s BOLTS (TYP.)
100 50 75 75 75 75 50 100
00
20
32
330 1000 1750 2000 2000 2000 2000 1750 420
33
195
6-M20 BOLTS TO BE UTILISED
125
265
00
ON COATES PROPRIETARY MP150 20
150 140 140 1390 360 1640 360 1390 360 360 1390 360 1640 360 1390 360 100 END PLATE.
150
580
360 360 360 140 140
150
495
00
20
125
265
125
33
110
STEEL CATCHMENT ASSEMBLY 00
SEE DRAWING SMWSASBT-CPG- 20
32
SWD-TU000-MS-DRG-070856 100 400 100 300 300
SBA2
SECTION "19" AND DETAIL "H"
50
17
SECTION 15 SECTION 16
SCALE 1 : 10 - SCALE 1 : 10 - 00
10
220 220 220 14 220 280 220 220 220
-
18
070856
NOTE: MODULE 1 NOT SHOWN FOR CLARITY
55
3mm GAP t = THICKNESS OF WEB OR FLANGE
2x25mm THK STIFFENER WITH
25mm THK STIFFENER WITH 12mm FW BOTH SIDES TO
FULL PENETRATION BUTT WELD SPLICE DETAIL FULL PENETRATION BUTT PRIMARY / SECONDARY BEAMS
SCALE 1 : 5
15
WELD
590
1993 1996 PRIMARY BEAM
30mm THK END PLATE
16
348
MODULE 1
PRIMARY BEAM
0m
-
mR
ADI
PRIMARY BEAM
U
BY SPECIALIST DESIGN
55
SECONDARY BEAM 2x30mm THK STIFFENER WITH
12mm FW BOTH SIDES TO
944
944
STEEL SLIDING PLATE PRIMARY / SECONDARY BEAMS
260 29
55
MODULE 1
MODULE 1 CHECKPLATE IN LINE WITH MP150 STRUT
2x25mm THK STIFFENER WITH
(TOTAL 4 NOS).
12mm FW BOTH SIDES TO
MP150 HYDRAULIC STRUT PRIMARY / SECONDARY BEAMS STIFFENER 220mm/280mm SPACING TO
TO SPECIALIST'S DESIGN ALIGN WITH THE ABOVE MODULE
1 STIFFENER AT CONNECTIONS
20mm THK INTERNAL STIFFENER
WITH 10mm FW BOTH SIDES TO
590
PRIMARY BEAM
150
PRIMARY BEAM
140
GAPS BETWEEN INSITU CONCRETE
55
220
350
-
FOR CONSTRUCTION
SCALE 1 : 10
SYDNEY METRO - WESTERN SYDNEY AIRPORT - STATION BOXES AND TUNNELLING WORKS
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: As indicated other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
ORCHARD HILLS STATION
DRAWN JENNIE-LYN GUEVARRA 28 FEB 2023 STRUCTURES
02 TITLE BLOCK UPDATED LF SKB JR 11.04.23 LIAM FRASER 28 FEB 2023
DESIGNED
01 ADDITIONAL INFORMATION / CLARIFICATION LF SKB JR 08.03.23 ALTERNATE STEEL SLIDING PLATFORM DRAWING SHEET 1
00 FOR CONSTRUCTION ISSUE LF SKB JR 28.02.23 DRG CHECK REDEN ALTERA 28 FEB 2023
FILE No: SMWSASBT-CPG-SWD-TU000-MS-M3D-070801 SHEET: 10 OF 11 ©
REV. AMENDMENT DESCRIPTION Design Verified Approved Date
DESIGN CHECK SUDIPTA KUMAR BEJ 28 FEB 2023 STATUS: DETAILED DESIGN - STAGE 3 DETAILED DESIGN (AFC) EDMS No:
by by by
REV VER
A1 Original Co-ordinate System:GDA2020/MGAZone56 Height Datum: A.H.D. This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. APPROVED JEFF ROPER 28 FEB 2023 DRG No: SMWSASBT-CPG-SWD-TU000-MS-DRG-070855 02
MODULE 1
495
220
280
220
220
25
15mm GAP
01
CONCRETE LEVEL
01 CONCRETE LEVEL T.O.C 26.279
T.O.C 25.867 1000
19
-
18 10
FULL PENETRATION BUTT WELD. 10 120
SURFACE TO BE GRINDED FLUSH
150
40MPa NON-SHRINK GROUT
0° WEB OR FLANGE (THICKNESS TO CONFIRM ON SITE)
45.0
100x100x10mm SHS
20
t
140
700
510
25
20
256 EMBEDMENT DEPTH)
375
20 20
17.3
10mm THK STEEL PLATES.
20
495
220
LEADING EDGE 180x180x10MM
260
260
140
180
100mm AT FULL SIZE Plot Date & Time: 13/04/2023 3:11:57 pm
20
2X250UC89.5 (SIDE BY SIDE) MAY BE USED
IN LIEU OF THE BUILT-UP RHS 20 140 20
NOTE: ALL WELDS FOR BUILT-UP MEMBERS NOTE: ALL WELDS FOR BUILT-UP MEMBERS
ARE FULL PENETRATION BUTT WELDS ARE FULL PENETRATION BUTT WELDS