SYDNEY METRO - WESTERN SYDNEY AIRPORT

STATION BOXES AND TUNNELLING WORKS

SYDNEY METRO - WESTERN SYDNEY AIRPORT


STATION BOXES AND TUNNELLING WORKS
ST MARYS METRO STATION
MOBILISATION AND SITE ESTABLISHMENT
SBTTW0307
SITE ESTABLISHMENT - CIVIL WORKS
DRAWING INDEX
Cad File: C:\WSASBT-EXPORT\Plotting\SMWSASBT-CPG-STM-SN100-MB-DRG-030701.dwg

DRAWING NUMBER DRAWING TITLE DRAWING NUMBER DRAWING TITLE


SMWSASBT-CPG-STM-SN100-MB-DRG-030701 DRAWING INDEX SMWSASBT-CPG-STM-SN100-MB-DRG-030744 CROSS SECTIONS - STATION BOX - MC12 SHEET 3
SMWSASBT-CPG-STM-SN100-MB-DRG-030702 LOCALITY PLAN SMWSASBT-CPG-STM-SN100-MB-DRG-030745 CROSS SECTIONS - STATION BOX - MC12 SHEET 4
SMWSASBT-CPG-STM-SN100-MB-DRG-030705 GENERAL NOTES SMWSASBT-CPG-STM-SN100-MB-DRG-030746 CROSS SECTIONS - STATION BOX - MC12 SHEET 5
SMWSASBT-CPG-STM-SN100-MB-DRG-030710 OVERALL GENERAL ARRANGEMENT PLAN SMWSASBT-CPG-STM-SN100-FN-DRG-030710 FENCING AND HOARDING PLAN SHEET 1
SMWSASBT-CPG-STM-SN100-MB-DRG-030712 SITE ACCESS PLAN SHEET 1 SMWSASBT-CPG-STM-SN100-FN-DRG-030711 FENCING AND HOARDING PLAN SHEET 2
SMWSASBT-CPG-STM-SN100-MB-DRG-030713 SITE ACCESS PLAN SHEET 2 SMWSASBT-CPG-STM-SN100-PV-DRG-030710 PAVEMENT PLAN SHEET 1

File Path: C:\WSASBT-EXPORT\Plotting\SMWSASBT-CPG-STM-SN100-MB-DRG-030701.dwg


SMWSASBT-CPG-STM-SN100-MB-DRG-030790 TYPICAL SECTIONS SHEET 1 SMWSASBT-CPG-STM-SN100-PV-DRG-030711 PAVEMENT PLAN SHEET 2
SMWSASBT-CPG-STM-SN100-MB-DRG-030791 TYPICAL SECTIONS SHEET 2 SMWSASBT-CPG-STM-SN100-PV-DRG-030715 PAVEMENT PROFILES
SMWSASBT-CPG-STM-SN100-MB-DRG-030792 TYPICAL SECTIONS SHEET 3 SMWSASBT-CPG-STM-SN100-PV-DRG-030716 PAVEMENT JOINTING DETAILS
SMWSASBT-CPG-STM-SN100-MB-DRG-030793 TYPICAL SECTIONS SHEET 4 SMWSASBT-CPG-STM-SN100-SD-DRG-030710 DRAINAGE PLAN SHEET 1
SMWSASBT-CPG-STM-SN100-MB-DRG-030795 TBM RETRIEVAL PLAN SMWSASBT-CPG-STM-SN100-SD-DRG-030711 DRAINAGE PLAN SHEET 2
SMWSASBT-CPG-STM-SN100-MB-DRG-030714 GENERAL ARRANGEMENT PLAN SHEET 1 SMWSASBT-CPG-STM-SN100-SD-DRG-030716 DRAINAGE DETAILS
SMWSASBT-CPG-STM-SN100-MB-DRG-030715 GENERAL ARRANGEMENT PLAN SHEET 2 SMWSASBT-CPG-STM-SN100-SD-DRG-030725 PIT AND PIPE SCHEDULE
SMWSASBT-CPG-STM-SN100-MB-DRG-030716 SURVEY PLAN SMWSASBT-CPG-STM-SN100-TF-DRG-030710 SWEPT PATH PLAN - STAGE 1
Plot Date: 04/08/22 - 23:51

SMWSASBT-CPG-STM-SN100-MB-DRG-030717 INTERFACE PLAN SMWSASBT-CPG-STM-SN100-TF-DRG-030712 SWEPT PATH PLAN - STAGE 2


SMWSASBT-CPG-STM-SN100-GL-DRG-030710 ALIGNMENT CONTROL PLAN SHEET 1 SMWSASBT-CPG-STM-SN100-TF-DRG-030714 SWEPT PATH PLAN - STAGE 3 SHEET 1
SMWSASBT-CPG-STM-SN100-GL-DRG-030711 ALIGNMENT CONTROL PLAN SHEET 2 SMWSASBT-CPG-STM-SN100-TF-DRG-030715 SWEPT PATH PLAN - STAGE 3 SHEET 2
SMWSASBT-CPG-STM-SN100-MB-DRG-030720 LONGITUDINAL SECTIONS - MC12 SMWSASBT-CPG-STM-SN100-EW-DRG-030712 CUT AND FILL PLAN SHEET 1
SMWSASBT-CPG-STM-SN100-MB-DRG-030742 CROSS SECTIONS - STATION BOX - MC12 SHEET 1 SMWSASBT-CPG-STM-SN100-EW-DRG-030713 CUT AND FILL PLAN SHEET 2
SMWSASBT-CPG-STM-SN100-MB-DRG-030743 CROSS SECTIONS - STATION BOX - MC12 SHEET 2
100mm AT FULL SIZE

FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 MOBILISATION AND SITE ESTABLISHMENT
JOHN KEARNS 13.05.2022 DRAWING INDEX
DESIGNED
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 1 OF 1 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone56 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030701 00
SYDNEY METRO - WESTERN SYDNEY AIRPORT
STATION BOXES AND TUNNELLING WORKS

NANCY-BIRD WALTON AIRPORT


(WESTERN SYDNEY INTERNATIONAL AIRPORT)

6000
CH 3
AIRPORT TERMINAL
0
700
H3 0
C 3 500
+160
+140

+120
+120

+080
+080

+060
+060

+040
+040

+020
+020

+980
+980

+960
+960

+940
+940

+920
+920

+880
+880

+860
+860

+840
+840

+820
+820

+780
+780

+760
+760

+740
+740

+720
+720

+680
+680

+660
+660

+640
+640

+620
+620

+580
+580

+560
+560

+540
+540

+520
+520

+480
CH
+460

+180 +140 +480

+440

+160 +460

+420

+180 +440

+220

+420

+240
0

+220 +380

+260

+240 +380 +360

+280

+260

+360 +340

+280

+340

+320 +320
00

+340

+320

+320

+360

+280

+340

+380

+280

+260

+360

+260

+380 +240

+420

+240

+440 +220

+420

+460 +220

+440

+480

+460 +180
8

+480 +180

+520

+160

+540

+160

+140

+520

+560

+140

+540 +120

+580

+560
H3

+120

+580

+620

+080
.000

+640

+080

+620

+660 +060

+640

+680 +060

+040

+660

+040

+680

+020

+720

+020

+740

+720

+760

+980

+740

+780

+980

+760

+960

+780

+820

+960

+940

+840
C

+940

+820

+920

+860

+840

+920

+880

+860

+880

+880

+920

+880

+940 +860

+920

+960

+860

+840

+940

+980

+840

+960

+820

0
+980

+820
0

+020

+040

+780

400
+020

+060

+040 +780

+080 +760

+060

+760

+740

+080
0

+120
CH 39+70

+740

+720

+140

+120

+160 +720

+140

+180

+680

+160
900

+180 +680

+220 +660

3
+240

+660

+640

+220

+260

+640

+240

+280 +620

+260

+620

BRINGELLY
+280

+320

H
+580

+340

+320

+580

+360

+560

+340

+380

+560

+360 +540

C
+380

+540

+420

+520

+440

+520

+420

CH 28000
+460

+440

+480

+480
3

+460

+480

+460

+480

+520

+460

+540

+440

+520

+560

+440

+540 +420

AIRPORT BUSINESS PARK


+580

+560

+420

+580

+620

+380
CH

+640

+620

+380

+660

+360

+640

+680

+360

+660

+340

+680

+340

+720

+320

+740

+320

+720

+760

+740

+780

+280

+760

00
+280

+780

+820 +260

+840 +260

+240

+820

+860

+240

+840

+880 +220

+860

+220

+880

+920

+180

+940

+920

+960 +180

+160

+940

+980

+160

290
+960

+140

+980

+140

+020

+120

+040

+120

+020

+060

+040

+080

+080

+060

+080

+060

+080

+120

+060

+140 +040

+120

+040

+160

+020

+140

+180

AEROTROPOLIS
+020

+160

0
+180

+220

+980

+240

+980

+960

+220

+260

+960

+240

+280 +940

700
+260

+940

+920

+280

+320

+920

+340

H
+320

+360

+880

CH 26000
+340

+380

+880

+860

+360

0
+860

+380

+420 +840

CH 31000
+440

+840

+820

+420

300
+460

+820

C
+440

+480

+460

+480

LUDDENHAM
+520

+540

000
+520

+560

+540

+580

2
+560

CH 25000
+580

+620

3
+640

+620

+660

+640

+680

+660

+680

+720

CH
CH
+740

+720

+760

+740

+780

+760

+780

CH 24000
+820

+840

+820

0
+860

+840

+880

0
+860

+880

+920

CH 22000
+940

+920

+960

CH 3
+940

+980

CH 2100
NORTH
+960

CH 23000
+980

+020

+040

+060

+020

+080

+040

+060

+120

+080

+140

+160

+120

+180

+140

+220

+160

+240

+260 +180

+280

+220

+320

+340 +240

+360

+260

+380

+280

+420

+320

+440

+340

+460

+360

+480 +380

+520

+420

+540

+440

+560 +460

+580

+480

+620

+520

+640 +540

+660

+560

+680

+580

+620

+640

+660

+680

+720

+740

00
200
M12
Cad File: C:\WSASBT-EXPORT\Plotting\SMWSASBT-CPG-STM-SN100-MB-DRG-030702.dwg

CH
ORCHARD HILLS
+680
+660
+640
+620
+580

+580
+560

+560
+540

+540
+520

+520
+480

+480
+460

+460
+440
+440
+420

+420
+380

+380 +360
+360 +340

+340
+320

+320 +280
+280 +260

+260
+240

+240

+220
+220

+180

+180
+160

+160
+140

+140
+120

+120
+080

+080

+060
+060

+040

+020

+980

+960
CLAREMONT MEADOWS
+040 +940

+620

+720

+020 +920

+740 +640

+660

+760

+980 +880

+680

+780 +960

+860

+940

+720

+840
+820

+920 +820

+840 +740

+860 +760

+880 +780

+880 +780

+860 +760

+920 +840

+940 +820 +740

+960 +820 +720

+980 +840

+020 +860

+040

+060 +880 +780

+080 +680

+920 +760 +660

+940

+960 +740

+980 +640

+020 +720 +620

+040

+060

+080

+680

+580

+660 +560

+640 +540

+620

+520

+580

+480

+560

+460

+540 +440

+520

+420

+480

+460 +380

+440 +360

+420

+340

+320

+380

+360

+340 +280

+320 +260

+240

+280

+220

+260

+240

+180

+220

+160

+140

+180

+120

+160

+140

+080

+120

+060

+080 +040

+060 +020

+040

+020

+980

+960

+980

+940

+960

+920

+940

+920

+880

+860

+880

+840

+860

+820

+840

+820

+780

+760

00
+780

+740

+760

+720

+740

+720

+680

90
+660

+680

+640

+660

+620

+640

+620

H1
+580

+560

+580

+540

+560

+520

+540

+520

+480

C
+460

+480

+440

+460

+420

+440

+420

+380

+360

+380

+340

+360

+320

+340

+320

+280

+260

+280

+240

+260

+220

+240

SOUTH
+220

+180

+160

+180

+140

+160

+120

+140

+120

+080

+060

+080

+040

+060

+020

+040

+020

+980

+960

+980

+940

+960

+920

+940

+920

+880

+860

+880

+840

+860

+820

+840

+820

+780

+760

+780

+740

+760

+720

+740

+720

+680

+660

+680

+640

+660

+620

+640

File Path: C:\WSASBT-EXPORT\Plotting\SMWSASBT-CPG-STM-SN100-MB-DRG-030702.dwg


+620

+580

+560

+580

+540

+560

+520

+540

+520

+480

+460

+480

+440

+460

+420

+440

+420

+380

+360

+380

+340

+360

+320

+340

+320

+280

+260

+280

+240

+260

+220

+240

+220

+180

+160

+180

+140

+160

+120

+140

+120

+080

+060

+080

+040

+060

+020

+040

+020

+980

+960

+980

+940

CH 1800
+960

+920

+940

+920

+880

+860

+880

0
+840

+860

+820

+840

+820

+780

+760

+780

+740

+760

+720

+740

+720

+680

+660

+680

+640

+660

+620

+640

+620

+580

+560

+580

+540

+560

+520

+540

+520

+480

+460

+480

+440

+460

+420

+440

+420

+380

+360

+380

+340

+360

+320

+340

+320

ST MARYS
+280

+260

+280

+240

+260

+220

+240

CH 17+2
22.523
Plot Date: 08/08/22 - 19:08

2
M1
100mm AT FULL SIZE

FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: AS SHOWN other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 MOBILISATION AND SITE ESTABLISHMENT
1:30000 @A1 0 300 600 900 1200 1500 LOCALITY PLAN
DESIGNED JOHN KEARNS 13.05.2022
m
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 1 OF 1 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone56 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030702 00
GENERAL NOTES DRAINAGE SCOUR PROTECTION
1. ALL LOCATIONS, LEVELS AND ORIENTATIONS SHALL BE VERIFIED ON SITE BEFORE COMMENCING 1. DRAINAGE PIPES 375 DIA AND LARGER TO BE REINFORCED CONCRETE CLASS “4” APPROVED 1. THE SCOUR PROTECTION CRITERIA APPLIES TO ALL RIP RAP INSTALLATION INCLUDING BUT NOT
ANY WORKS. ANY DISCREPANCIES SHOULD BE REFERRED TO THE DESIGNER. SPIGOT AND SOCKET WITH RUBBER RING JOINTS U.N.O. LIMITED TO CULVERT INLET/OUTLET PROTECTION, CHANNEL LINING, LONGITUDINAL DRAINAGE
2. DIMENSIONS ARE NOT TO BE SCALED FROM THE DRAWINGS. OUTFALLS
2. PIPES LESS THAN 375 DIA SHALL BE SEWER GRADE UPVC WITH SOLVENT WELDED JOINTS.
3. EARTHWORKS ASSOCIATED WITH THE CONSTRUCTION AND FORMATION OF THE TEMPORARY
3. RCP PIPES SHALL HAVE HS3 TYPE INSTALLATION IN ACCORDANCE WITH AS3725, TfNSW STANDARD 2. RIP RAP SHALL CONSIST OF CLEAN, HARD, DURABLE ROCK. THE RIP RAP SHALL BE PLACED IN SUCH
HAUL ROADS WILL BE AS FOLLOWS:
DRAWING R0240-1, T HR CI 12110 ST AND T HR CI 12111 SP U.N.O. A MANNER THAT INDIVIDUAL ROCKS ARE INTERLOCKING. SMALLER ROCK INTERFILL SHALL BE
a. ALL TOPSOIL SHALL BE REMOVED
4. HDPE PIPES TO BE ADS N12 INSTALLED TO MANUFACTURERS SPECIFICATIONS U.N.O. PLACED IN VOIDS AS REQUIRED TO PROVIDE A HARD, DURABLE SURFACE
b. THE FOUNDATION SHALL COMPRISE ONE OF THE FOLLOWING MATERIALS:
i. NATURAL IN SITU MATERIAL OF AT LEAST STIFF CONSISTENCY AS DEFINED IN TABLE 11 OF 5. ALL DRAINAGE WORKS TO TfNSW QA SPECIFICATIONS R11 UNLESS SPECIFIED OTHERWISE. 3. GEOTEXTILE SHALL BE CLASS A U.N.O.
AS1726-2017. 6. THE TRENCH WALLS OR SURROUNDING EMBANKMENT AROUND THE PIPE IS TO BE REVIEWED BY 4. ROCK FOR RIP RAP SHALL HAVE A PARTICLE DENSITY AND MINIMUM POINT LOAD STRENGTH IN
ii. OTHER MATERIAL AS APPROVED BY BG&E VIA A HOLD POINT. THE GEOTECHNICAL SITE REPRESENTATIVE (GSR) TO CHECK DENSITY AND STIFFNESS IN ACCORDANCE WITH AS 1141.6.1
c. PAVEMENT FILL SHALL BE COMPACTED TO THE FOLLOWING: COMPARISON TO ADJACENT COMPACTED FILL AS PER TO AS3725 FOR HS3 SUPPORT. IF HS3 5. THE GRADATION OF ROCK USED FOR RIP RAP SHALL BE:
i. DENSITY RATIO / HILF DENSITY RATIO: > 98% SMDD. SUPPORT CANNOT BE ACHIEVED, PIPE IS TO BE REDESIGNED.
d. THE MAXIMUM COMPACTED THICKNESS OF EACH LAYER OF PAVEMENT FILL SHALL BE NO 7. CONNECTION BETWEEN PIPES AND STRUCTURES TO BE UNDERTAKEN IN ACCORDANCE WITH ROCK GRADATION
MORE THAN 300 MM. TfNSW STANDARD DRAWINGS R0200 SERIES AND TfNSW MODEL DRAWINGS U.N.O.
e. THE FREQUENCY OF COMPACTION TESTING SHALL NOT BE LESS THAN: d50=VARIES
8. PIPES WITH GEOTEXTILE TO BE IN ACCORDANCE WITH TfNSW SPECIFICATION R63.
i. 1 TEST PER 50 M LINEAR OR d15=0.75d50
9. PIPE LENGTHS PROVIDED IN DRAINAGE LONG SECTIONS ARE CALCULATED FROM PIT REFERENCE
ii. 1 TEST PER 250 M2 OR
POINT TO PIT REFERENCE POINT. d85=1.5d50
iii. NO LESS THAN 2 TESTS PER LAYER IN ANY SECTION
4. THE INFORMATION CONTAINED IN THESE DRAWINGS IS FOR CIVIL CONSTRUCTION ONLY .ALL 10. UNSUITABLE FOUNDING MATERIAL FOR PIPES AND STRUCTURES SHALL BE REMOVED OR IMPROVED
IN ACCORDANCE WITH TfNSW QA SPECIFICATION R44. d100=2.0d50
DISCREPANCIES ON THE DRAWINGS AND WITH OTHER CONTRACT DRAWINGS SHALL BE
REFERRED TO THE DESIGNER FOR CLARIFICATION BEFORE PROCEEDING WITH THEWORK. 11. EXISTING STORMWATER PIPE LOCATIONS AND INVERT LEVELS TO BE CONFIRMED PRIOR TO
WORKS SHALL NOT PROCEED WITHOUT CLARIFICATION AND INSTRUCTION FROM THE DESIGNER. COMMENCEMENT OF CONSTRUCTION. 6. ACTUAL d50 SHALL BE WITHIN 10% OF THE SPECIFIED NOMINAL DIAMETER d85/d15 SHALL FALL
5. THE CONTRACTOR SHALL NOT ENTER OR WORK ON ADJOINING PROPERTIES WITHOUT THE 12. GRATES AND COVERS SHALL CONFORM TO AS3996 AND AS1428.1 AT ALL TIMES DURING BETWEEN THE RANGE OF MIN 1.5 AND MAX 2.5.
WRITTEN CONSENT OF THE OWNERS OR THE RELEVANT AUTHORITIES. CONSTRUCTION OF THE STORMWATER PITS AND BE RATED AS CLASS D MINIMUM. ALL GRATES TO 7. THE MINIMUM DEPTH OF RIP RAP SHALL BE 2 x d50.
6. MAKE SMOOTH CONNECTION WITH EXISTING WORKS BE HINGED AND LOCKABLE. 8. RIP RAP SHALL BE PLACED IN A MANNER THAT PREVENTS DAMAGE TO THE GEOTEXTILE.
13. ALL EXISTING STORMWATER DRAINAGE LINES AND PITS THAT ARE TO REMAIN TO BE INSPECTED
AND CLEANED. DURING THIS PROCESS ANY PART OF THE STORMWATER DRAINAGE SYSTEM THAT
SURVEY WARRANTS REPAIR SHALL BE REPORTED TO CPBG JV FOR FURTHER DIRECTIONS. EXISTING SERVICES AND FEATURES
14. PITS DEEPER THAN 1.0m TO BE FITTED WITH GALVANISED STEP IRONS. REFER TO TfNSW STANDARD
1. THE INFORMATION IS SHOWN TO PROVIDE A BASIS FOR DESIGN. BG&E DOES NOT GUARANTEE 1. EXISTING SERVICES UNLESS SHOWN ON SURVEY PLAN HAVE BEEN PLOTTED FROM SERVICES
DRAWING R0220-45 FOR DETAILS.
THE ACCURACY OR COMPLETENESS OF THE SURVEY BASE OR ITS SUITABILITY AS A BASIS FOR SEARCH PLANS AND AS SUCH THEIR ACCURACY CANNOT BE GUARANTEED.
15. GEOTEXTILES SHALL BE SOURCED AND PLACED IN ACCORDANCE WITH TfNSW QA SPECIFICATION
CONSTRUCTION DRAWINGS. 2. THE CONTRACTOR HAS A DUTY OF CARE WHEN EXCAVATING NEAR SERVICES. DO NOT ASSUME
R63.
2. SHOULD DISCREPANCIES BE ENCOUNTERED DURING CONSTRUCTION BETWEEN THE SURVEY DEPTHS OR ALIGNMENTS OF CABLES OR PLANT AS THESE MAY VARY SIGNIFICANTLY. THE
16. TRENCH DRAINS TO BE CONSTRUCTED IN ACCORDANCE WITH TfNSW QA SPECIFICATION R33 AND
DATA AND ACTUAL FIELD DATA, CONTACT CPBG JV. CONTRACTOR MUST ACCEPT ALL RESPONSIBILITY FOR DAMAGES TO EXISTING SERVICES AS
MANUFACTURERS SPECIFICATIONS.
3. THE CONTRACTOR SHALL ARRANGE ALL SURVEY SETOUT TO BE CARRIED OUT BY A REGISTERED SERVICE AUTHORITIES MAY SEEK COMPENSATION FOR DAMAGES CAUSED TO THEIR PROPERTY
17. IF SUBGRADE MATERIAL IS DEEMED UNSUITABLE REFER TO TfNSW SPECIFICATION R44 FOR AND SUBSEQUENT LOSSES CAUSED.
SURVEYOR.
TREATMENT OPTIONS.
4. BENCH MARK, SURVEY PEGS, LEVEL PEGS OR SUPPLEMENTARY REFERENCE MARKS SHALL NOT 3. THE CONTRACTOR SHALL ALLOW FOR THE CAPPING OFF, EXCAVATION AND REMOVAL OR
18. ALL SUBSURFACE DRAINAGE MUST COMPLY WITH TfNSW QA SPECIFICATIONS R33 (TRENCH RELOCATION (IF REQUIRED) TO RELEVANT AUTHORITIES GUIDELINES OF ALL EXISTING SERVICES
BE ADJUSTED OR MOVED WITHOUT WRITTEN APPROVAL FROM CPBG JV. THE CONTRACTOR
DRAINS), R37 (INTRA-PAVEMENT DRAINS) AND R38 (EDGE DRAINS). IN AREAS AFFECTED BY WORKS WITHIN THE CONTRACT AREA OR AS SHOWN ON THE DRAWINGS
SHALL TRANSFER ANY PEGS AFFECTED BY THE PROPOSED WORKS TO SIDE POSITIONS CLEAR
19. THE DOCUMENTED DRAINAGE SYSTEM IS DETAILED ONLY FOR THE TEMPORARY SITE UNLESS DIRECTED OTHERWISE BY THE ENGINEER/CPBG JV.
OF OPERATIONS AND SHALL NOTE THE EXTENT OF THE MOVEMENT IN DISTANCE AND LEVEL.
CONFIGURATION. UNLESS NOTED OTHERWISE, CONSTRUCTION REQUIREMENTS SHALL BE THE 4. INTERRUPTION TO SUPPLY OF EXISTING SERVICES SHALL BE DONE SO AS NOT TO CAUSE ANY
Cad File: C:\WSASBT-EXPORT\Plotting\SMWSASBT-CPG-STM-SN100-MB-DRG-030705.dwg

RESPONSIBILITY OF THE CONTRACTOR. INCONVENIENCE TO SURROUNDING ALLOTMENTS. CONTRACTOR TO GAIN APPROVAL FROM THE
KERB AND GUTTER 20. EXISTING STORMWATER DRAINAGE PIPES THAT ARE IDENTIFIED TO BE ABANDONED ARE TO BE RELEVANT AUTHORITIES FOR TIME OF INTERRUPTION.
1. FOR STANDARD KERB AND GUTTER SHAPES AND DETAILS REFER TO TfNSW STANDARD CAPPED OFF AT ENDS AND INFILLED WITH GROUT (MIN. 20MPa) AND MAY REMAIN IN-SITU UNLESS IN 5. THE CONTRACTOR SHALL CONSTRUCT TEMPORARY SERVICES TO MAINTAIN SUPPLY TO EXISTING
DRAWINGS R0300. CONFLICT WITH DESIGN ELEMENTS. BUILDINGS REMAINING IN OPERATION DURING WORKS TO THE SATISFACTION AND APPROVAL OF
2. ALL KERBS AND GUTTERS TO BE CONSTRUCTED ON MINIMUM 75MM GRANULAR BASECOURSE 21. EXISTING STORMWATER DRAINAGE PITS THAT ARE LOCATED ON ABANDONED LINES TO BE ANY RELEVANT AUTHORITIES. ONCE DIVERSION IS COMPLETE AND COMMISSIONED, THE
COMPACTED TO MINIMUM 98% MODIFIED MAXIMUM DRY DENSITY IN ACCORDANCE WITH AS1289. DECOMMISSIONED OR BACKFILLED AS REQUIRED BY CONSTRUCTION. CONTRACTOR SHALL REMOVE ALL SUCH TEMPORARY SERVICES AND MAKE GOOD TO THE
3. FOR VEHICULAR CROSSING DETAILS REFER TO WESTERN SYDNEY PLANNING PARTNERSHIP 22. THE EXISTING STORMWATER DRAINAGE PIT AND PIPE LAYOUT SHOWN ON THE DRAWINGS IS SATISFACTION OF THE RELEVANT AUTHORITY/SUPERINTENDENT.
STANDARD DRAWINGS SD-R10. INDICATIVE ONLY. WHERE A NEW CONNECTION OR EXTENSION IS IS TO BE MADE TO ANY EXISTING 6. ALL SERVICE COVERS AND GRATES AFFECTED BY THE WORKS SHALL BE ADJUSTED AS REQUIRED
4. CONCRETE KERBS AND CHANNELS SHALL BE PLACED MANUALLY OR MACHINE LAID TO AS2876. PIT OR PIPE, ALL LOCATIONS, ORIENTATIONS AND REDUCED LEVELS AT THE PROPOSED AND TO SUIT THE LEVELS OF THE NEW WORK TO ENSURE MINIMUM COVERS (TO RELEVANT
CONNECTION POINT SHALL BE VERIFIED ON SITE BEFORE COMMENCING ANY WORK. SERVICE AUTHORITY GUIDELINES) ARE MAINTAINED. IF MINIMUM COVERS ARE NOT MAINTAINED
23. DRAINAGE DESIGN TO BE READ IN CONJUNCTION WITH DESIGN LOTS STM-SN100-0303 PACKAGE. THE CONTRACTOR IS TO LOWER OR PROTECT SERVICES TO THE SATISFACTION OF THE RELEVANT

File Path: C:\WSASBT-EXPORT\Plotting\SMWSASBT-CPG-STM-SN100-MB-DRG-030705.dwg


PAVEMENT 24. CONTRACTOR IS RESPONSIBLE FOR DETERMINING MINIMUM COVER DURING CONSTRUCTION, TO SERVICE AUTHORITY AND CPBG JV.
1. REFER TO DRAWING SMWSA-CPG-STM-SN100-PV-DRG-030715 FOR PAVEMENT DESIGN AND SUIT CONSTRUCTION METHODOLOGY UTILISED. 7. LEVEL AND LOCATION OF ALL UNDERGROUND UTILITY SERVICES TO BE CONFIRMED BY FIELD
DETAILS. INSPECTION (BY CONTRACTOR) PRIOR TO COMMENCEMENT OF WORKS AND THE RELEVANT
2. ALL BASECOURSE MATERIAL TO COMPLY WITH TfNSW QA SPECIFICATION 3051 AND COMPACTED UTILITY PLANS OBTAINED BY DIALING PH 1100 OR FAX 1300 652 077 (DIAL BEFORE YOU DIG).
CAUTION SHOULD BE EXERCISED WHEN WORKING IN THE VICINITY OF ALL UTILITY SERVICES.
TO MINIMUM 98% MODIFIED DRY DENSITY IN ACCORDANCE WITH AS1289. EARTHWORKS 8. ALL WORKS NEAR OR AROUND UNDERGROUND ELECTRICAL CABLES SHALL BE IN ACCORDANCE
3. ALL SERVICE TRENCHES UNDER VEHICULAR PAVEMENTS SHALL BE BACKFILLED WITH AN
1. A QUALIFIED GEOTECHNICAL ENGINEER SHALL BE PRESENT ON SITE DURING SITE ESTABLISHMENT WITH AUSGRID NETWORK STANDARD NS156 AND NS130.
APPROVED SELECT MATERIAL AND COMPACTED TO A MINIMUM 98% STANDARD MAXIMUM DRY
AND CONSTRUCTION TO VERIFY FOUNDING CONDITIONS ARE SUITABLE. 9. ADJUSTMENT/RELOCATION OF ANY EXISTING UTILITY WOULD BE SUBJECT TO THE PRIOR
DENSITY IN ACCORDANCE TO AS1289.
2. STRIPPED FOUNDATION LEVEL SHALL BE SUBJECT TO PROOF ROLLING IN ACCORDANCE WITH APPROVAL OF THE RELEVANT SERVICE PROVIDER.
LINEMARKING TfNSW STANDARD T HR CI 12110 ST. ANY AREAS SHOWING EXCESSIVE DEFLECTION SHALL BE
Plot Date: 08/08/22 - 19:08

REMOVED AND REPLACED WITH STRUCTURAL FILL IN ACCORDANCE WITH TfNSW STANDARD T HR CI
1. DELINEATION PAVEMENT MARKINGS SHALL BE PROVIDED IN ACCORDANCE WITH RTA 12110 ST AND T HR CI 12111 SP.
DELINEATION GUIDELINES, THE RELEVANT RMS/TfNSW TECHNICAL DIRECTIONS, 3. CHANNELS ARE TO BE CONSTRUCTED WITH DIMENSIONS AND SETOUT POINTS AS PER THE
COMPLIMENTARY GUIDELINES, RMS AUSTROADS AND AUSTRALIAN STANDARDS SUPPLEMENTS, CHANNEL SCHEDULE. ANY DEVIATIONS TO BE AGREED UPON BY THE DESIGNER AND RESPONSIBLE
AUSTRALIAN STANDARDS AS 1742 - "MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES PART 1 - SITE ENGINEER.
15" AND RMS QA SPECIFICATIONS R141. 4. ALL ON-SITE WATER CHANNELS TO DISCHARGE INTO THE SEDIMENTATION BASIN AND NO SPILLAGE
TO OFF-SITE CHANNELS TO BE ENSURED.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ANY EXCAVATION IN A STABLE
100mm AT FULL SIZE

SIGNAGE CONDITION.
1. ALL GUIDE/REGULATORY/WARNING SIGNAGE ARE TO BE PROVIDED IN ACCORDANCE WITH AS
1742.
2. MANUFACTURE, SUPPLY AND INSTALLATION OF SIGNPOSTING SHALL BE IN ACCORDANCE WITH
TfNSW QA SPECIFICATION R143.
3. NON-FRANGIBLE SIGNS ARE TO BE PLACED OUTSIDE THE CLEAR ZONE, UNLESS PROTECTED BY
SUITABLE SAFETY BARRIER.
4. AT THE TIME OF CONSTRUCTION, SIGNS MAY BE RELOCATED LOCALLY WITH THE APPROVAL OF
THE SITE SUPERINTENDENT AND RESPONSIBLE SITE ENGINEER.
5. ALL RELEVANT EXISTING SIGNPOSTING TO BE RETAINED DURING CONSTRUCTION.
6. CONNECTION OF SIGN FACES AND ASSEMBLY DETAILS TO BE UNDERTAKEN IN ACCORDANCE
WITH MANUFACTURERS REQUIREMENTS AND RELEVANT TfNSW/RMS SPECIFICATIONS.
FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 MOBILISATION AND SITE ESTABLISHMENT
JOHN KEARNS 13.05.2022 GENERAL NOTES
DESIGNED
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 1 OF 1 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone56 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030705 00
LEGEND
CONSTRUCTION SITE BOUNDARY
N CADASTRAL BOUNDARY

17+400
RAIL ALIGNMENT (BY OTHERS)

17+400
GPP EP
G GP
FORRESTER ROAD EP EP EP

HARRIS STREET PROPOSED JERSEY BARRIER


EP

LOCAL AREA WORKS PACKAGE


STM-SN100-0303

T
AEW WORKS REFER DRAWING
MB-DRG-030717 FOR DETAILS

T
SMWSASBT-CPG-STM-SN100-MB-DRG-030714 SMWSASBT-CPG-STM-SN100-MB-DRG-030715 AEW 5.1 BY OTHERS

T
EFPP
GAT

E E E
E EP E
E E E E
E E E E E
EP
E
IL E E E E E E E E E E
EPEP EP
E E
SHAFT
E E
EJB
E E E E E E E E E E E E E E
E E E E
EP E E E E E E E E E E E
E E
EJB E E E
EP EP E E E E E E
EJB
TSP EP
IL EFPP

SVP
TB TSP
TB
SECURITY (3x3)
PPPP
SSSS
SSSP TTTTS
SPPPP TTSPP
TTTTS
TTSP
ST MARYS HEAVY RAIL RAILWAY STATION
PPPPP
SSSPS
TTTTTTS
TTSSS PP TB
TB

CONCRETE
AW
TB TB
TRAFFIC
EFP
IL
BARRIER AEW 1.4 PACKAGE
TB WM HV ACCESS
GATE

T
BIN BIN
ACOUSTIC
+220

+240
+260

+280

+320
+340

+360

+380

+420
+440

+460

+480

+520

+540

+560

+580

+620

+640

+660
+680

T
+720

+740
+760

+780

+820

+840

BH FL
FL FL FL
SHED LV ACCESS
BH
B H
ST MARYS METRO STATION BOX CRANE
WEST LANE

EGELGL BHH T
BIN BIN BIN EMBEHMH
BIN
PAD +260

GATE +240

+280
+320

+340

+360
+380

+420

+440

+460

+480

+520

+540
+560

+580

+620

+640

+660

+680

T
+720

T
+740

+760

+780

+820

+840

+860

BIN BIN

E
ELECTRICAL

E
EGL
EGL
STATION STREET CRANE WATER TEMPORARY SUBSTATION

E
ACOUSTIC

E
E
T
PAD TREATMENT SITE

T
SHED

E
E
E
BIN
TDP JB BIN
BIN
EJB
PLANT OFFICES

GLOSSOP STREET
TE
CONCRETE

E
AW

E
STORES
GIDLEY STREET

T
WORKSHOPS STORES TRAFFIC
WTP CHESHAM STREET

E
E
E
E
WORKSHOPS BARRIER

T
JB
EP EP EP

TE
E
T

E
T

E
NO

AW
PA

//
RK

SECURITY 3x3
Cad File: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030710.dwg

IN
G

AW

E
E
E T
E
NARIEL STREET AEW PACKAGE 4.1 - GLOSSOP

T
SF

E
E
E
E
EP EJB
EP
AW STREET RAMP

E
E
E
E
T
WHEELWASH
LOADING BAY

E T
E
EJB

E
E
WEST LANE

QUEENS STREET

E
E
T
E
E
ACCESS ROAD A

LETHBRIDGE STREET

TE
E
SPOIL STOCKPILE
EAST LANE

E
AEW 5.1 PACKAGE
BY OTHERS

File Path: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030710.dwg


JB BIN EP

S
BIN T

BU
T

PHILLIP STREET

T
PHILLIP STREET

BU T
BIN BIN EP

S
T T T T T T
TDP
T
JB
TSC
Plot Date: 08/08/22 - 19:28

REFER TO LOCAL AREA WORKS (LAW)


BIN
PACKAGE STM-SN100 0303 FOR JB

ACCESS ROAD A DETAILS


T

EP
100mm AT FULL SIZE

FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: AS SHOWN other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 MOBILISATION AND SITE ESTABLISHMENT
1:1000 @A1 0 10 20 30 40 50 OVERALL GENERAL ARRANGEMENT PLAN
DESIGNED JOHN KEARNS 13.05.2022
m
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 1 OF 1 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone56 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030710 00
FORR
LEGEND
?
CONSTRUCTION SITE BOUNDARY
N GAT CADASTRAL BOUNDARY

17+400
?
? ? ?
? ? EP

EJB EP EP ? RAIL ALIGNMENT (BY OTHERS)


EJB ? ?? ?
TSP EP
EFPP

17+400
TB TSP
SVP TB
PPPP
TSSP
S
T T
S
T S
P
S
P TTTTS
PP T S
P
S
S
TTTSSPP PPPPP TBM RETRIEVAL AREA
TTTTTTSSSSPS
TTSSS PP TB
TB

W
SITE ACCESS SCHEDULE PORTIONS.
'STM-1'
ST MARYS HEAVY RAIL RAILWAY STATION REFER SITE ACCESS SCHEDULES
TB AW TB
'STM-11' IL
SITE ACCESS SETOUT POINTS
?
? EFP (SYDNEY METRO)
Point 13 Point 12 Point 11 Point 10
TB
'STM-7' BOUNDARY POINTS BOUNDARY POINTS
Point 57
14 WM
? Point 15 Point Point 56 Point ID EASTING NORTHING Point 33 294253.086 6261883.422

? Point 58 Point 1 294460.667 6261838.989 Point 34 294264.257 6261876.930

Point 2 294462.519 6261850.163 Point 35 294270.774 6261876.278


? ?
? BIN
WH ?BIN
Point 3 294463.978 6261859.045 Point 36 294270.177 6261870.508

+520
+540

+560

+580
+620
+640

+660
+680

+720

+740
+760

+780

? ? BH Point 4 294466.664 6261874.948 Point 37 294269.895 6261867.776


FL
BH
B H
? 'STM-2' FL
ST MARYS METRO STATION BOX FL FL Point 5 294450.400 6261877.723 Point 38 294273.433 6261863.063

WH EGELGL ? ? BBHH
Point 6 294428.701 6261883.583 Point 39 294421.884 6261836.539
BIN ? BIN BIN ? EMEHM?H Point 7 294394.202 6261893.851 Point 40 294425.019 6261836.806

ADJOINS SMWSASBT-CPG-STM-SN100-MB-DRG-030713
? BIN 'STM-6' Point 8 294384.582 6261900.668 Point 41 294427.972 6261839.108

+520
+540

+560
+580

+620
+640

+660
+680

+720

?
+740
+760

+780

+820

Point 18 Point 19 Point 59 Point 61


Point 9 294369.130 6261907.598 Point 42 294430.113 6261841.603

? Point 60 ? Point 10 294148.093 6261947.076 Point 43 294433.235 6261843.742


BIN BIN
? Point 11 294134.303 6261948.910 Point 44 294447.638 6261852.831
Point 20 Point 12 294123.042 6261951.633 Point 45 294449.226 6261861.690
EGL
EGL STATION STREET Point 13 294089.471 6261957.701 Point 46 294383.842 6261879.403

Point 14 294021.833 6261964.581 Point 47 294378.406 6261848.443


Point 32
'STM-4' Point 15 293971.063 6261972.871 Point 48 294301.036 6261862.028

WH WH WH WH WH Point 16 293926.892 6261980.032 Point 49 294293.088 6261863.540

TDP BIN Point


EJB 21 Point 22 Point 63 Point 31 Point 17 293923.867 6261955.300 Point 50 294285.350 6261866.081
JB BIN
BIN Point 18 293967.087 6261947.570 Point 51 294280.242 6261868.483

Point 19 293989.397 6261943.580 Point 52 294277.618 6261869.667


AW Point 20 293988.566 6261938.615 Point 53 294356.226 6261879.531

Point 21 294000.713 6261921.086 Point 54 294358.900 6261883.835

Point 22 294020.009 6261917.627 Point 55 294360.082 6261901.232

GIDLEY STREET
Point 23 294014.410 6261873.577 Point 56 294170.250 6261936.874
Cad File: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030712.dwg

Point 24 294012.417 6261847.966 Point 57 294021.534 6261963.278


WH JB
Point 25 294011.664 6261841.768 Point 58 294007.889 6261964.130

ACCESS ROAD A
Point 26 294008.684 6261817.244 Point 59 294003.925 6261941.819
AW
Point 27 294131.205 6261795.400 Point 60 294036.781 6261934.386

AW Point 28 294134.169 6261794.872 Point 61 294165.736 6261911.471

Point 29 294138.840 6261844.561 Point 62 294272.410 6261892.516

Point 30 294155.407 6261841.684 Point 63 294044.632 6261913.273

WHSF 'STM-1' Point 31

Point 32
294160.580

294161.329
6261892.577

6261899.434
Point 64

Point 65
294033.207

294135.851
6261839.150

6261845.078

EP EJB
EP Point 23
AW

Point 65 Point 29 Point 30

File Path: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030712.dwg


EJB

'STM-12' Point 24

Point 25 Point 64
Plot Date: 08/08/22 - 19:44

?
QUEENS STREET

'STM-10'
EAST LANE

WH
100mm AT FULL SIZE

Point 26 ? Point 27 Point 28


? ? ?
WH ? ?? JB BIN WH WH
BIN

PHILLIP STREET
C?AM
? ?? BIN BIN ?P
?P
T T T
T?DP
T
JB
T T T

WH ??
T

?P
?
?P

FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: AS SHOWN other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 MOBILISATION AND SITE ESTABLISHMENT
1:500 @A1 0 5 10 15 20 25
DESIGNED JOHN KEARNS 13.05.2022 SITE ACCESS PLAN
m SHEET 1
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 1 OF 2 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone56 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030712 00
T
LEGEND

T
CONSTRUCTION SITE BOUNDARY
N CADASTRAL BOUNDARY

17+400
E E EP E E
?P
E E E E
?
E E E E E E E E
E E E E E E E
IL E E E E E E E E E E
E E E E E E E E E E E E
E

EPEP EP
E E E E E
EJB
E E E E E E E E
E E E E E E E E
E E E E E E E E E E E E E E
E E
EP
E E E
?
E E E E E E E E E E E E E E E
E
RAIL ALIGNMENT (BY OTHERS)
E E E E E E E E E
E E E E E E E E E E E E E E
E E E E E E E E
E E
N
IIIIN IIIIN
N
E E E E E E E E
E
N 222255 D
N D ia
ia
ia N 330000 D
N Dia
ia
ia
Dia
222255 D Dia
330000 D

17+400
TB

TBM RETRIEVAL AREA


TB
SITE ACCESS SCHEDULE PORTIONS.
'STM-1' REFER SITE ACCESS SCHEDULES

SITE ACCESS SETOUT POINTS


?
(SYDNEY METRO)
Point 9
Point 8 N
IIIIN IIIIN
N BOUNDARY POINTS BOUNDARY POINTS
N 5
N 55 D
D ia
ia N ?6
N P0000 DDia
ia
'STM-9' 3
55
33
2
7
52
3
2
77 Dia
255 D
7 ia 66
44
460
4 55
5000 D
5 ia
Dia Point ID EASTING NORTHING Point 33 294253.086 6261883.422
Point 55 Point 7 ?P Point 1 294460.667 6261838.989 Point 34 294264.257 6261876.930

T
T
Point 2 294462.519 6261850.163 Point 35 294270.774 6261876.278
Point 6
Point 5 Point 4
+220

+240
+260

+280
+320
Point 3 294463.978 6261859.045 Point 36 294270.177 6261870.508
+340

+360
+380

+420
+440
+460

+480

T
Point 4 294466.664 6261874.948 Point 37 294269.895 6261867.776

T
?
Point 5 294450.400 6261877.723 Point 38 294273.433 6261863.063
?P

T
Point 6 294428.701 6261883.583 Point 39 294421.884 6261836.539

ST MARYS METRO STATION BOX Point 54 Point 46

T
'STM-8' Point 7 294394.202 6261893.851 Point 40 294425.019 6261836.806
ADJOINS SMWSASBT-CPG-STM-SN100-MB-DRG-030712

T
?TP Point 8 294384.582 6261900.668 Point 41 294427.972 6261839.108

+240
+260

+280
+320
+340

+360
+380

+420

+440
+460

+480

+520

Point 53 Point 45 Point 3


T T
Point 9 294369.130 6261907.598 Point 42 294430.113 6261841.603
Point 62
T
?P

T
E
E
Point 10 294148.093 6261947.076 Point 43 294433.235 6261843.742

E
E
Point 11 294134.303 6261948.910 Point 44 294447.638 6261852.831

E
E
ET
Point 12 294123.042 6261951.633 Point 45 294449.226 6261861.690
Point 44 Point 2

T
E
Point 13 294089.471 6261957.701 Point 46 294383.842 6261879.403

E
E
Point 33 Point 14 294021.833 6261964.581 Point 47 294378.406 6261848.443

E
T E
E
T
Point 15 293971.063 6261972.871 Point 48 294301.036 6261862.028

WH WH Point Point
34 35

E
'STM-3'

E
Point 16 293926.892 6261980.032 Point 49 294293.088 6261863.540

E
Point 43 Point 1 Point 17 293923.867 6261955.300 Point 50 294285.350 6261866.081

TE
Point 52 51

E
Point 36 Point 42

E
Point

T
Point 18 293967.087 6261947.570 Point 51 294280.242 6261868.483
Point 37 Point 50
Point 49
Point 48 Point 47 Point 41

E
E
E
Point 19 293989.397 6261943.580 Point 52 294277.618 6261869.667

E
Point 40

GLOSSOP STREET
T
Point 38 Point 20 293988.566 6261938.615 Point 53 294356.226 6261879.531

T
E
E
E
E
LETHBRIDGE STREET

Point 21 294000.713 6261921.086 Point 54 294358.900 6261883.835

E
E
E T
E
Point 22 294020.009 6261917.627 Point 55 294360.082 6261901.232
9
Point 3

T
Point 23 294014.410 6261873.577 Point 56 294170.250 6261936.874

E
E
E
E
CHESHAM STREET
Cad File: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030713.dwg

Point 24 294012.417 6261847.966 Point 57 294021.534 6261963.278

E
T E
?PP ?P

E
E
Point 25 294011.664 6261841.768 Point 58 294007.889 6261964.130

T
EP WH EP E WH T T T T ?P
T
Point 26 294008.684 6261817.244 Point 59 294003.925 6261941.819

E
E
E
E
Point 27 294131.205 6261795.400 Point 60 294036.781 6261934.386

TE
E
TE
E
Point 28 294134.169 6261794.872 Point 61 294165.736 6261911.471

Point 29 294138.840 6261844.561 Point 62 294272.410 6261892.516

E
E
E
E
EP Point 30 294155.407 6261841.684 Point 63 294044.632 6261913.273

T
ET
E
E
E
Point 31 294160.580 6261892.577 Point 64 294033.207 6261839.150
EP
Point 32 294161.329 6261899.434 Point 65 294135.851 6261845.078

E
E
E
E
T
E T
E
E
E

E
T E
WH

E
E
T
T

E
E E
E

File Path: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030713.dwg


E
TE E
E

E
E E
E
T

ET
E
E
E
?P T

E
E
E
E
E T
E
E
E

T
Plot Date: 08/08/22 - 19:47

E
T E
E
E
?P

E
E
E
E

E
TE
E
E

E
E
E
E
ET
E
E
E
WH

E
E
E
E
E T
100mm AT FULL SIZE

E
E
E
WH
?P

E
T E
E?P

E
E
S
T

BU
T T T
T

E
E
E
E
T
PHILLIP STREET

E
TE
E
E
T

E
E
?P

E
E
BU T?P ?EPP
S
T T T T T T T

ET
E
E
E
TSC

E
E
E
E
E T
?P

E
E
E

E
T E
E
E
FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: AS SHOWN other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 MOBILISATION AND SITE ESTABLISHMENT
1:500 @A1 0 5 10 15 20 25
DESIGNED JOHN KEARNS 13.05.2022 SITE ACCESS PLAN
m SHEET 2
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 2 OF 2 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone57 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030713 00
HAUL ROAD ACCESS RAMP LEGEND
VARIES
BATTER TO BE FINISHED WITH
50mm SHOTCRETE. REFER TO
TEMPORARY WORKS PACKAGE

TYPICAL SECTION AT CH 40.000 (MC12)


SCALE 1:100

CHESHAM STREET

SOUTHERN HAUL ROAD SITE LAYDOWN AREA EXISTING AEW PACKAGE 1.4
ACCESS TRACK
Cad File: C:\WSASBT-EXPORT\Plotting\SMWSASBT-CPG-STM-SN100-MB-DRG-030790.dwg

EXISTING DRAIN MATCH INTO


TO BE REMOVED EXISTING LEVELS
CHESHAM STREET

File Path: C:\WSASBT-EXPORT\Plotting\SMWSASBT-CPG-STM-SN100-MB-DRG-030790.dwg


TYPICAL SECTION AT CH 55.000 (MC12)
SCALE 1:100
Plot Date: 08/08/22 - 19:11

SOUTHERN HAUL ROAD SITE LAYDOWN AREA FLAT SLAB FOR ACOUSTIC SHED EXISTING AEW PACKAGE 1.4
ACCESS TRACK
100mm AT FULL SIZE

DROP BEAM EDGE. REFER TO ST


MARYS TEMPORARY WORKS
DRAWINGS.
TYPICAL SECTION AT CH 90.000 (MC12)
SCALE 1:100

FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: AS SHOWN other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 MOBILISATION AND SITE ESTABLISHMENT
1:100 @A1 0 1 2 3 4 5
DESIGNED JOHN KEARNS 13.05.2022 TYPICAL SECTIONS
m SHEET 1
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 1 OF 4 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone56 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030790 00
MC12
AEW PACKAGE 1.4 ACCESS TRACK
SOUTHERN HAUL ROAD STATION BOX EXCAVATION
15.7m 26m CONSTRUCTED BY OTHERS

0.8
9.3m

:1
-2.5%

STATION BOX (BY OTHERS) STATION BOX EXCAVATION

STATION BOX (BY OTHERS)


STABILISED BATTER SLOPE WITH
SHOTCRETE AND SOIL NAILS. REFER
TO THE TEMPORARY WORKS PACKAGE

TYPICAL SECTION AT CH 130.000 (MC12)


Cad File: C:\WSASBT-EXPORT\Plotting\SMWSASBT-CPG-STM-SN100-MB-DRG-030791.dwg

SCALE 1:100

EXISTING STATION STREET CARRIAGEWAY

W/B TRAVEL LANE


3.5m 1.0m SAFETY BARRIER AND
EXISTING STATION STREET CONSTRUCTION HOARDING
SHOULDER

File Path: C:\WSASBT-EXPORT\Plotting\SMWSASBT-CPG-STM-SN100-MB-DRG-030791.dwg


SOUTHERN KERB TO REMAIN
SOUTHERN HAUL ROAD STATION BOX EXCAVATION AEW ACCESS TRACK - CONSTRUCTED BY OTHERS
4.0m 25.5m 11.7m

AEW STORMWATER RELOCATION


VA
RI
ES
Plot Date: 08/08/22 - 19:11

-2.5%
STATION BOX EXCAVATION
STATION BOX (BY OTHERS)
STABILISED BATTER SLOPE WITH
SHOTCRETE AND SOIL NAILS. REFER
STATION BOX (BY OTHERS)
TO THE TEMPORARY WORKS PACKAGE
100mm AT FULL SIZE

TYPICAL SECTION AT CH 220.000 (MC12)


SCALE 1:100

FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: AS SHOWN other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 MOBILISATION AND SITE ESTABLISHMENT
1:200 @A1 0 2 4 6 8 10
DESIGNED JOHN KEARNS 13.05.2022 TYPICAL SECTIONS
m SHEET 2
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 2 OF 4 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone56 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030791 00
STATION STREET OVERLAND FLOW PATH LEGEND
PLAZA SITE COMPOUND EAST OF ACCESS ROAD A RAMP STATION BOX EXCAVATION AEW ACCESS TRACK (BY OTHERS)
AEW PACKAGE 1.4 (BY OTHERS)

VARIES
3.5m
CONSTRUCTION TRAFFIC
3.5m AEW PACKAGE 1.4 (BY OTHERS)

VA
AEW STORMWATER RELOCATION RI
ES

CAPPING BEAM AND


UPSTAND WALL BY OTHERS STATION BOX EXCAVATION CAPPING BEAM BY OTHERS

TYPICAL SECTION AT CH 350.000 (MC12)


SCALE 1:100

PROPOSED ROAD BOUNDARY


SITE ESTABLISHMENT LOCAL AREA WORKS SITE ESTABLISHMENT
PACKAGE SBTTW0307 PACKAGE SBTTW0303 PACKAGE SBTTW0307

SITE ESTABLISHMENT COMPOUND SHARED PATH S/B LANE SITE ESTABLISHMENT COMPOUND
SITE BOUNDARY

MATCH EXISTING BOUNDARY LEVEL.


3.0m 3.5m 1.5m

SHOULDER
LOCALISED REGRADING

STATION PLAZA UNDERCROFT


PARKING LEVEL

TYPICAL SECTION AT CH 30.000 (MC30) ACCESS ROAD A


REFER LOCAL AREA WORKS PACKAGE
SCALE 1:100
Cad File: C:\WSASBT-EXPORT\Plotting\SMWSASBT-CPG-STM-SN100-MB-DRG-030792.dwg

VEGETATED ZONE

2 1.8%
1 in 1 in 2
2 1 in

File Path: C:\WSASBT-EXPORT\Plotting\SMWSASBT-CPG-STM-SN100-MB-DRG-030792.dwg


TYPICAL SECTION AT CARPARK A
SCALE 1:100
Plot Date: 08/08/22 - 19:11

1.9% 1.8% 1.8%


1 in
100mm AT FULL SIZE

2 1 in
2

TYPICAL SECTION AT CARPARK B


SCALE 1:100

FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: AS SHOWN other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 MOBILISATION AND SITE ESTABLISHMENT
1:100 @A1 0 1 2 3 4 5
DESIGNED JOHN KEARNS 13.05.2022 TYPICAL SECTIONS
m SHEET 3
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 3 OF 4 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone56 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030792 00
100mm AT FULL SIZE Plot Date: 08/08/22 - 19:12 Cad File: C:\WSASBT-EXPORT\Plotting\SMWSASBT-CPG-STM-SN100-MB-DRG-030793.dwg

00
REV.
APPROVED FOR CONSTRUCTION
LEVEL
LEVELS
LEVELS
DESIGN

EXISTING

DIFFERENCE
RL 25.000

AMENDMENT DESCRIPTION
LEVEL
LEVELS
LEVELS
DESIGN

A1 Original Co-ordinate System: GDA2020/MGAZone56


EXISTING

DIFFERENCE
RL 30.000

PHILLIP STREET
WEST OF ACCESS ROAD A

by
TJ
Design
1.069 40.865 41.933
1.051 40.862 41.914
-0.096 40.844 40.747

Height Datum: AHD


by
MS
-0.184 40.825 40.642

-0.143 40.802 40.659

40.771 40.682 1.005 40.736 41.741

by
-0.089

CL
Verified Approved
0.006 40.717 40.723
1.215 40.617 41.833

Date
ACCESS ROAD A

04.08.22
0.102 40.665 40.766 1.215 40.573 41.788

0.158 40.633 40.791 1.211 40.526 41.738

3.961 37.734 41.695

1:200 @A1 0
3.939 37.720 41.659
0.316 40.548 40.864 37.717 41.636
3.919

SCALE: AS SHOWN

2
0.372 40.518 40.890 3.903 37.713 41.616

3.886 37.710 41.596

4
3.869 37.707 41.575
0.456 40.453 40.909
3.851 37.703 41.554

6
3.834 37.700 41.533

3.816 37.696 41.512

8
0.553 40.378 40.931
3.798 37.693 41.491
0.586 40.353 40.939
3.780 37.689 41.469

m
10
3.762 37.686 41.448
0.663 40.294 40.957
3.744 37.682 41.426

3.728 37.677 41.404


0.718 40.252 40.970
3.713 37.668 41.381

0.774 40.209 40.983 3.696 37.659 41.355

3.680 37.650 41.330

0.851 40.151 41.003 3.663 37.641 41.305

0.886 40.125 41.011 3.643 37.637 41.280

3.615 37.640 41.255

3.587 37.643 41.230

3.559 37.646 41.205


1.013 40.029 41.043
3.531 37.649 41.180
1.053 40.000 41.052

This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing.
3.503 37.652 41.156

1.041 39.962 41.003 3.472 37.656 41.128

3.447 37.659 41.106

1.026 39.917 40.943 3.420 37.662 41.082

3.212 37.690 40.902 3.393 37.665 41.057

37.690 40.861 3.365 37.668 41.033


3.170
3.337 37.671 41.008
3.122 37.690 40.812
3.310 37.674 40.984
3.095 37.680 40.775
3.282 37.677 40.960

37.655 40.717 3.255 37.680 40.935


3.062
3.227 37.683 40.911
3.036 37.643 40.679

3.003 37.642 40.645 3.200 37.687 40.887

2.970 37.641 40.611 3.173 37.689 40.862

SCALE 1:200
SCALE 1:200

37.689 40.838
PARKING LEVEL (FROM SURVEY)

3.149

SECTION
SECTION

2.904 37.639 40.543 3.125 37.689 40.814

3.103 37.686 40.789


EXISTING STATION PLAZA UNDERCROFT

PLAZA SITE COMPOUND

2.837 37.638 40.475


3.081 37.684 40.765

3.059 37.682 40.741


2.770 37.636 40.407

2
1

3.037 37.679 40.717

EW-030712
EW-030712

3.015 37.677 40.692


2.703 37.634 40.337

CLIENT:
2.994 37.674 40.668

37.633 40.268 2.972 37.672 40.644


2.635
37.670 40.620
PLAZA SITE COMPOUND

2.950

SYDNEY METRO
2.565 37.634 40.198 2.928 37.667 40.595
TYPICAL SECTION AT CH 60.000 (MC30)

2.906 37.665 40.571


TYPICAL SECTION AT CH 360.000 (MC12)

2.489 37.639 40.128 2.885 37.662 40.547

2.863 37.660 40.523

2.407 37.646 40.053 37.658 40.499


2.841
2.819 37.655 40.475
2.342 37.651 39.993
2.798 37.653 40.450

2.776 37.650 40.426


2.272 37.657 39.929
2.754 37.648 40.402

2.732 37.646 40.378


2.202 37.663 39.865
2.711 37.643 40.354

2.688 37.641 40.328

CIVIL
2.132 37.670 39.801
2.665 37.638 40.303

2.642 37.636 40.278


2.062 37.676 39.738
2.620 37.634 40.254

BG&E - bgeeng.com
2.584 37.643 40.227
1.983 37.692 39.675
than the Sydney Metro Project. 37.655 40.202
2.547
2.510 37.666 40.176
0.643 38.969 39.612
2.473 37.678 40.151
0.627 38.949 39.577
2.445 37.681 40.126
0.618 38.931 39.549

38.907 39.516 2.417 37.683 40.100


0.609
38.888 39.485 2.389 37.686 40.075
0.597
2.361 37.689 40.050
0.620 38.828 39.449
2.333 37.692 40.025
DRAWN

0.584 38.806 39.389 2.305 37.695 39.999


DESIGNED

APPROVED
DRG CHECK

2.277 37.697 39.974


0.568 38.762 39.331
2.231 37.717 39.949

0.001 39.923 39.923


0.545 38.722 39.267
-0.030 39.929 39.898
COLIN BIBLE

-0.061 39.934 39.873


JOHN KEARNS

0.446 38.757 39.203


CHRIS LAWTON
GARY VALLANCE

-0.091 39.939 39.848

-0.122 39.946 39.824


DESIGN CHECK TREVOR WOODWARD

0.300 38.839 39.139

-0.137 39.953 39.817


0.150 39.080 39.230
-0.155 39.982 39.826

-0.174 40.013 39.839

-0.163 40.019 39.856


other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any

-0.151 40.026 39.875

-0.141 40.036 39.896


13.05.2022
13.05.2022
13.05.2022

-0.114 40.030 39.916

-0.073 40.005 39.932

-0.070 39.992 39.921


0.043 39.983 40.026
SHEET 4
STATION STREET

13.05.2022 TYPICAL SECTIONS


ST MARYS STATION
CONSTRUCTION TRAFFIC
WEST OF ACCESS ROAD A
SOUTHERN HAUL ROAD

1.0
:1
GIDLEY STREET

MOBILISATION AND SITE ESTABLISHMENT

13.05.2022 STATUS: APPROVED FOR CONSTRUCTION


FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701

DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030793


EDMS No:

00
REV
SHEET: 4 OF 4
FOR CONSTRUCTION

VER
©
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS

File Path: C:\WSASBT-EXPORT\Plotting\SMWSASBT-CPG-STM-SN100-MB-DRG-030793.dwg


LEGEND
STM BOUNDARIES
N
SSTOM CONSTRUCTION AREA

SBT TBM RETRIEVAL SITE

GP
G
P EP
GP
EP EP EP

WH WH
WH
EP
?P
Site Access Dates
Site Access Licensed
Portion
Area

T
STM-1 N1

T
STM-2 N1
STM-2

T
GAT (second visit to retrieve N2
EP IL E E
E
E
E
E
E
E
E
E
E
EP E
E
E
E
E
E
E
E
?P
E
E E
E E
TBMs)
EPEP EP E E E E E
EJB
E E E E E E E E E E E E E E E E
EP E E E E
EJB E E E
STM-3 N1
E E E
EP
E
EP
E E E E E E E
EJB E E E E E E
TSP EP IN
IN
IN 222255 D
IN D ia
ia IN
IN
IN 330000 D
IN D ia
ia
Dia
222255 D ia Diaia
IL EFPP 330000 D

PP SVP
TB TSP
TB
STM-4 N1
PPPP
SSSS TSP
TTTSS SSPPP
TTTTS P TTS
TTSP PPPPP
SSSPS
TTTTTTS
TB
TTSSS PP
TB STM-5 N1
'STM-11' CONCRETE
TB AW
STM-6 N1
'STM-7'
TB
TRAFFIC
EFP
IL
BARRIER STM-7 N1
'STM-9'
TB STM-7
WM
HVININININACCESS
5
33
352
77
7255 D
D ia
Dia
255 D
7
ia
ia
IN
IN
IN ?P
IN 6
46
40
50
500 D
D ia
Dia
000 D
55
ia
ia
552
3 60
44
6
(second visit to retrieve N2
GATE ?P

T
WH
ACOUSTIC TBMs)
+660

+640

+620

+580

+560

+540

+520

+480

+460

+440

+420

+380

+360

+340

+320

+280

+260

+240

+220
+820 +780 +760 +740 +720 +680

T
FL

WH EGELGL 'STM-5' 'STM-2' 'STM-6'


FL FL FL
'STM-8' SHED LV ACCESS ?P STM-8 N1
EMEHMH T
+840 +820 +780 +760 +740 +720 +680 +660 +640 +620 +580 +560 +540 +520 +480 +460 +440 +420 +380 +360 +340 +320 +280 +260

GATE +240

T
?P
T
STM-9 N1

T
?P

E
ELECTRICAL STM-10 N1

E
EGL
EGL
CRANE WATER 'STM-3'
'STM-4' TEMPORARY SUBSTATION

E
ACOUSTIC STM-11 N1
CUTT

E
E
T
ERHE
AD

PAD TREATMENT SITE

T
WH WH WH WH WH WH
SHED

E
TDP EJB
PLANT STM-12 N2

E
E
JB
OFFICES
AW
CONCRETE

TE
STM-12

E
TE
TOWER CRANE WORKSHOPS STORES TRAFFIC (second visit to retrieve N2

E
E
E
E
WH JB BARRIER TBMs)

T
EP WH EP ?PP
E WH ?P ?P

E
TE
AW
T

E
T

E
AW 'STM-12' SECURITY 3x3

E
E
E T
E
'STM-1'
Cad File: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030795.dwg

EP
WHSF

T
EP

E
E
E
E
EP EJB
EP
AW

E
E
WHEELWASH

E
E
T
WH
LOADING BAY

E T
EJB

E
E
E
E
E
E
E
'STM-10' T

T
?P

E
E
ACCESS ROAD A

E
E
Pas enger vehicle (5.2 m)

E
TE
SPOIL STOCKPILE

E
E
?P
EAST LANE

E
E E
E
ET
E
E
E
WH
WH

E
E
WH WH WH

File Path: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030795.dwg


E
E
JB WH ?P
P
E?P

S
T

BU
T

E T
E
T

E
E
CAM

BU T
?P ?P

E
T

E
T
?P ?P ?P
EP

E
E
T
TDP
T T
JB T T
WH

T
TSC

E
E
?P

E
E
?P
?P

E
ETE
E
E
EE
E
?P
Plot Date: 09/08/22 - 00:01

T
JB

T
?P
T

EP
100mm AT FULL SIZE

FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: AS SHOWN other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 MOBILISATION AND SITE ESTABLISHMENT
1:1000 @A1 0 10 20 30 40 50
JOHN KEARNS 13.05.2022 TBM RETRIEVAL PLAN
m DESIGNED
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 1 OF 1 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone56 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030795 00
FORR
LEGEND
?
CONSTRUCTION SITE BOUNDARY
N GAT
CADASTRAL BOUNDARY
?
? ? ?
? ? EP TBM TUNNEL ALIGNMENT (BY OTHERS)
EJB EP EP ?
EJB ? ?? ?
TSP EP 24.0 DESIGN CONTOUR - MAJOR
IN EFPP IN
IN DESIGN CONTOUR - MINOR
TB TSP
SVP TB PROPOSED CONTOUR - MAJOR
PPPP
TSSP
S 24.0
T T
S
T S
P
S
P TTTTS
PP T S
P
S AEW PACKAGE 1.4
S
TTTSSPP PPPPP
TTTTTTSSSSPS
TTSSS PP TB PROPOSED CONTOUR - MINOR
TB

W
N N
AEW PACKAGE 1.4
IN IN ININ ININ IN
IN ININ ININ IN
IN IIN
IIN
ST MARYS HEAVY RAIL RAILWAY STATION IIN
IIN TREE PROTECTION ZONES
TB AW TB N N IN
PROPOSED STORMWATER DRAINAGE
IL
IN
? GRATED SURFACE PIT
? EFP
PROPOSED JERSEY BARRIER
TB WM SO
PROPOSED SO KERB
? 20\13
? SB
PROPOSED SB KERB
MATCH INTO EXISTING ? MATCH
? INTO EXISTING STATION
?
WH STATION STREET ?BIN BIN
STREET PAVEMENT LEVELS ST MARYS STATION BOX REFER LOCAL AREA WORKS

+520
+540

+560

+580
+620
+640

+660
+680

+720

+740
+760

+780

? ? BH
PAVEMENT LEVELS FL PACKAGE SN100-DRG-0303
OVERLAND TRANSITIONAL FL FL SOUTHERN
? FL
BH
B H
EGELGL FLOW PATH EXISTING LAYBACKS TYPE F BARRIER
WH CRANE PAD ? ? BBHH HAUL ROAD EXISTING STATION STREET
BIN ? BIN BIN TO REMAIN ? EMEHM?H

ADJOINS SMWSASBT-CPG-STM-SN100-MB-DRG-030715
? BIN PAVEMENT TO REMAIN

+520
+540

+560
+580

+620
+640

+660
+680

+720

?
+740
+760

+780

+820

? ? 20\08 20\07 PACKAGE AEW 5.1 BY OTHERS


BIN BIN

37.837.6
38.238.0
38.6 38.4
20\09
?

.4
20\11 20\06

37
38.
20\12
EGL 39.0
EGL STATION STREET 20\10
SB

WH H WH WH
WH WATERWTREATMENT EXISTING STATION
TDP JB BIN EJB STREET KERB AND
BIN
BIN PLANT

37.4
EXISTING STATION
37.4.4 .8 GUTTER TO REMAIN
.0
AW STREET LEVELS TO
REMAIN (TYP.)
37 7.6 3 8 40 TURNSTILE
3

//

.8
.0 GATE .4

37
38 WORKSHOPS 40
STORES

.2
GIDLEY STREET
500t CRANE PAD. REFER 4

38
38. .6 E1
Cad File: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030714.dwg

WH JB TEMPORARY WORKS
PACKAGE FOR DETAILS 38 .8
38 0

ACCESS ROAD A
NO

AW
PA

39. .2
RK
IN

SECURITY 3x3
G

AW
39 .4 3 STATION

41.2
39 .6 0 .6 STREET
WHSF
EXISTING GIDLEY
39 .8 4 .8
EJB
STREET TO REMAIN
39 .0 40
EP
40 .2
//

EP
AW
40 .4 WHEELWASH
0
4BAY .6

41.8
41.6
LOADING 0

File Path: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030714.dwg


WATER TREATMENT 4
EJB . 8 .8
39PLANT 4 0 WIDE GATE
1 .0
2 4
40. 41
.2
EXISTING CAR PARK TO BE
DEMOLISHED (BY OTHERS). SITE TO

42.0
31 PHILLIP
STREET BE LOCALLY GRADED FROM 3 STATION

41.4
STREET BOUNDARY TO PROPOSED
Plot Date: 08/08/22 - 19:56

? ACCESS ROAD A BOUNDARY


40.

SPOIL STOCKPILE
QUEENS STREET

41.6
EAST LANE

? REFER TO LOCAL AREA WORKS (LAW)

41.6
WH PACKAGE STM-SN100 0303 FOR
100mm AT FULL SIZE

?
? ? ? EJB
ACCESS ROAD A DETAILS
WH ? ?? JB BIN WH WH
BIN BIN WH
WH

BIN
WH

41.8
PHILLIP STREET
C?AM SPOIL PILE SLAB. REFER INDUSTRIAL DRIVEWAY
? ?? BIN BIN ?P TEMPORARY WORKS
T T T
?P (ACCESS ROAD B)
T?DP
T
JB
T
PACKAGE FOR DETAILS
T T DH
?P ?P ?P

WH
?P

??
T

EP

?P
?
?P EP
?P

?P

FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: AS SHOWN other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 MOBILISATION AND SITE ESTABLISHMENT
1:500 @A1 0 5 10 15 20 25
DESIGNED JOHN KEARNS 13.05.2022 GENERAL ARRANGEMENT PLAN
m SHEET 1
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 1 OF 2 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone56 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030714 00
T
LEGEND

T
CONSTRUCTION SITE BOUNDARY
N CADASTRAL BOUNDARY

T
E E EP E E
?P
E E E E
?
E E E E E E E E
E E E E E E E
IL
E E E
TBM TUNNEL ALIGNMENT (BY OTHERS)
E E E E E E E E E E E E
E E E E E E E E

EPEP EP
E E E E E
EJB
E E E E E E E E
E E E E E E E E
E E E E E E E E E E E E E E
E E
EP
E E E
?
E E E E E E E E E E E E E E E
E E E E E E E E E
E E E E E E E E E E E E E
E E E E E E E E E
E E E
N
IIIIN IIIIN
N
E E E E E E E E
E
N 222255 D
N D ia
ia
ia N 330000 D
N Dia
ia
ia
Dia
222255 D Dia
330000 D 24.0 DESIGN CONTOUR - MAJOR
DESIGN CONTOUR - MINOR
TB PROPOSED CONTOUR - MAJOR
24.0
AEW PACKAGE 1.4
TB PROVIDE SLOPED PROPOSED CONTOUR - MINOR
END TERMINAL AEW PACKAGE 1.4
TRAFFIC BARRIERS, REFER TEMP
TREE PROTECTION ZONES
WORKS PACKAGE FOR DETAILS
EXISTING AEW PACKAGE 1.4 ACOUSTIC SHED PROPOSED STORMWATER DRAINAGE
DRAIN TO BE REMOVED GRATED SURFACE PIT
STABILISED BATTER SLOPE WITH ?
36 36.5 37
SHOTCRETE, VARIABLE SLOPE. PROPOSED JERSEY BARRIER
REFER TEMP WORKS PACKAGE N
IIIIN ia
ia IIIIN
N
N ?6 ia
ia SO
37 N 5
N 55 D
D N P0000 DD PROPOSED SO KERB
36.5
CONCRETE TRAFFIC 37.5 55
33
3 2
7
52
3
2
77 Dia
255 D
7 ia 66
44
460
4 55
5000 D
5 ia
Dia
TIE INTO RETAIN EXISTING SB
37 BARRIER P
DRAIN ? PROPOSED SB KERB

T
37.5
38

T
41 EXISTING DRAIN

41.5
38.5
39
39.5
40 38
ACOUSTIC SHED

.5
+220

+240
+260

+280
+320
+340

+360
+380

38

39
+420
REFER LOCAL AREA WORKS
+440
+460

+480

5
39.
?

40

4 0 .5

T
41

4 1 .5

T
42

42.5
? PACKAGE SN100-DRG-0303

43

43.5
HV ACCESS

44

4 4 .5
ST MARYS STATION BOX

45

4 5 .5
?P

46

46.5
GATE

T
47
39
39.5
40
40.5 EXISTING STATION STREET

T
ACOUSTIC SHED 41
41.5
42
42.5
B LV ACCESS GATE PAVEMENT TO REMAIN
ADJOINS SMWSASBT-CPG-STM-SN100-MB-DRG-030714

38
43
43.5
T
?TP

+240
+260

MB-030792

+280
+320
+340

+360
+380

4444.5
+420

38.6
+440
+460

+480

+520

.2
T
4455.5

39.0
4466.5 T
?P

T
21\01 CONCRETE TRAFFIC PACKAGE AEW 5.1 BY OTHERS

E
E
E
E
20\05 37.8 BARRIER
TURNSTILE
ELECTRICAL

E
E
ET
1 2 3 4 5 6

T
TEMPORARY SUBSTATION

E
37.6

E
E
20\04
SITE OFFICES

E
20\03 20\02

E
E
T
A

T
WH STATION STREET WH

E
E
E
MB-030792
20\01

TE
E
T E
12000

E
E
E
E
GLOSSOP STREET
T T
E
E
E
E
LETHBRIDGE STREET

E
E
E T
E T
E
E
E
E
CHESHAM STREET
Cad File: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030715.dwg

E
T E
?PP ?P

E
E
T
EP WH EP E WH T T T T ?P
T

E
E
E
E
TE
E
TE
E
SOUTHERN 100t CRANE PAD, REFER TEMPORARY TURNSTILE SITE SHEDS AT EXISTING
CHESHAM STREET LEVEL

E
E
HAUL ROAD

E
E
WORKS PACKAGE FOR DETAILS EP

T
ET
E
E
E
EP

E
E
E
E
T
E T
E
E
E

E
T E
WH

E
E
T
T

E
E E
E

File Path: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030715.dwg


E
TE E
E

E
E E
E
T

ET
E
E
E
?P
?P T

E
E
E
E
E T
E
E
E

T
Plot Date: 08/08/22 - 23:59

E
T E
E
E
?P

E
E
E
E

E
TE
E
E
TC

E
E
E
E
ET
E
E
E
WH
?P

E
E
E
E
JB

E T
100mm AT FULL SIZE

E
E
E
TC TDP
WH
?P
?P

E
T E
E?P

E
E
V1

S
WH
WH
STN TR T

BU
?P ?P T T T
JB EP DH DH T

E
E
E
E
T
PHILLIP STREET

E
TE
E
E
T

E
E
?P

E
E
BU T?P ?EPP
S
T T T T T T T

ET
E
?P
?P EP
60
STN 82
?P

E
JB

E
EP
?P ?P

DH
TSC

E
E
BP

E
E
TDP

E T
?P
JB

E
E
E
WH
TDP

E
T E
?P

E
E
FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: AS SHOWN other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 MOBILISATION AND SITE ESTABLISHMENT
1:500 @A1 0 5 10 15 20 25
DESIGNED JOHN KEARNS 13.05.2022 GENERAL ARRANGEMENT PLAN
m SHEET 2
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 2 OF 2 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone57 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030715 00
32
37

38
LEGEND

33
37
37

39
34

37 CONSTRUCTION SITE BOUNDARY

38
37
33

37
CADASTRAL BOUNDARY

37

37
33

39
32

37
33 36
33
TBM TUNNEL ALIGNMENT (BY OTHERS)
40
33

33
37
40
PROPOSED CONTOUR - MAJOR
32

37
37
24.0

35
36
40
40
33 37 37
AEW PACKAGE 1.4

37

40
37
38 39

34
GPP
G GP 36
PROPOSED CONTOUR - MINOR

41
41

36

42
FORRESTER ROAD
37 39 40 AEW PACKAGE 1.4
33 35 37
HARRIS STREET 40
43
24.0 EXISTING CONTOUR - MAJOR LIDAR
35
33

38
33

38
35 42

EXISTING CONTOUR - MINOR LIDAR

34
38
41
36

39
41
43

43
33
INFORMATION OBTAINED FROM 3D

34

44
41

44
37
35 35 44 TOPO SURVEY
45
44
36 44 INFORMATION OBTAINED FROM 2D

36

40
36
SURVEY
42
34
36

4444
42

44

44
43
INFORMATION OBTAINED FROM

44
34 35

35
36
39
AEW 1.4 PACKAGE E E E
E
E
E
E
E E
E E
E E E E
AEW PACKAGE 1.4
IL E E E E E E E E E E
E E E E E E E E E
39 E E E E E E E E E E E E 45 E E
E E E E
INFORMATION OBTAINED FROM
E E E E E E E E E E E
E
36 E E E E E
IN
IN
IN D
IN 222255 D ia
ia IN
IN
IN 330000 D
IN D ia
ia
39 40 45 44 Dia
222255 D ia Dia
330000 D ia
35 35 35 41
35
35

IL 43 4445 46
35
38 42
34 35 35
35 38
37
37 39
40 41
39 40 40 42
ST MARYS STATION BASEMENT SURVEY
35

35 35 38 37
35

35 SVP 36 36 36 37 38 38 4039
36 36 36

36
36

36
36

36
37

36
ST MARYS HEAVY RAIL RAILWAY STATION 36 37 37 37
38

37
36 36
36

38
36
36

17+213
17+300
17+400
17+500
17+600
17+700
17+800

36

37
36
35 35

37
37
36

38
36
38
35
35 36 37 37

37
35 35

36
36
IL
39

36
36 37 38
35

35 35
35

35 36
IN
IN IN
IN
37
35 40 ia
ia 46 D ia
ia
55 D
D IN 6 00 D
35 36 IN 5
IN 35
33
22
77
7 Dia
255 D ia IN 6
4455
0
50 Dia
000 D ia

35
37 41 5
35 3635 37 552
3 7 47 4
660
4

36
35

35

35
38 39

37 38

43
39 +220

+240
+260

3399
+280

+320
+340

+360

+380

+420
+440

+460

+480

38
+520

+540

40
+560

+580

+620

+640

+660
+680

42
+720

+740
+760

+840
+820
+780

38 39

41
38 47

42

43
40

44
42

45
41

46
44
WEST LANE

47
41
39 45
40
36 40 42 40 42 43
38

47
41 46 +260
+240

+280
+320

+340

+360
+380

+420

+440

+460

+480

+520

44

+540
+560

+580

+620

+640

+660

+680
+720

+740

+760

+780

+860
+840
+820

47

45
42 42
45

E
36

E
35

4242
42

48
37
36

48
STATION STREET 39
LEVELS NOT AVAILABLE OF 3

E
E
E
STATION STREET BOUNDARY

17+238
17+300
17+400
17+500
17+600
17+700
17+800

E
E
E
LEVEL AND CAR PARK. LIDAR

GLOSSOP STREET
36

47

E
LEVELS USED

E
E
GIDLEY STREET
36

49
41 42
46

CHESHAM STREET

43

E
E
40

E
E
37.709m 43

43

49
37.714m
38

37.618m
48
37.721m

E
E
E
E
37.732m

44
//
Cad File: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030716.dwg

36

41

E
E
50

E
E
NARIEL STREET

43
37.588m
44
37.778m
TOPOGRAPHICAL SURVEY OF 37.588m
39
39

SF

E
E
37.418m 37.683m 37.411m

E
E
GIDLEY STREET NOT AVAILABLE 45
37

36
37.739m

44
m34m
37.63774.7

E
E
37.517m

E
E
50
48
36

E
E
37.693m

50

E
E
37.689m
36

3 STATION STREET

42
WEST LANE

44
QUEENS STREET

37.680m 37.741m
37.7213m7.703m

41

E
51

E
49
36

42

45
40

E
E
ACCESS ROAD A

47
45

51
47
37

LETHBRIDGE STREET

E
E
37

46
EAST LANE

43 43

50
31 PHILLIP STREET

E
AEW 5.1 PACKAGE
36

40

LEVELS
43
NOT AVAILABLE OF 31
37

36

51
43
38

43

File Path: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030716.dwg


51
PHILLIP STREET RETAINING 44 52

44
41 52
WALL (LEVELS ASSUMED)

S
37

BU
39
42
LEVELS NOT AVAILABLE AT PHILLIP STREET
PHILLIP STREET
39

ACCESS ROAD A TIE-IN


36

45
42
36

51 52 52

S
48
37

BU
42 42
36

3377

36

46
41
TSC
36

42

41
36

43
36
37

36
36 46 49
42
41

52
37
Plot Date: 08/08/22 - 20:03

38

40

39
36

47
37

52
37
41

50
51
39

46
36

42

44
40
38

53
38
37

52
45

53
40
39

48
39
100mm AT FULL SIZE

40

53
53

53
52
42
38

49
43
35

53
36 49 53
41
40 53
54
37

54
35

54
36

51

54
48
50

52
37

47

48

54
37
37

39
3737

46

54
54
40
44

54

54
47
35

34

54
48
47
40

47

FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: AS SHOWN other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 MOBILISATION AND SITE ESTABLISHMENT
1:1000 @A1 0 10 20 30 40 50 SURVEY PLAN
DESIGNED JOHN KEARNS 13.05.2022
m
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 1 OF 1 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone56 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030716 00
LEGEND
CONSTRUCTION SITE BOUNDARY
N

PACKAGE 1.4
SYDNEY TRAINS ACCESS

GP
G
P
GP
EP
PACKAGE 1.5
EP EP EP
SYDNEY TRAINS ASSETS RELOCATIONS
FORRESTER ROAD
HARRIS STREET
EP

PACKAGE 3.1
DESIGN GLOSSOP STREET POWER SUPPLY

T
PACKAGE 4.1

T
SLIP LANE ACCESS AND INTERSECTION
ADJUSTMENT

T
EFPP
GAT

EP IL E E
E
E
E
E
E
E
E
E
E
EP E
E
E
E
E
E
E
E
E
E
E E
E E PACKAGE 5.1
EPEP EP
E E E E E E E E E
E E E E E E
TEMPORARY BUS INTERCHANGE
E E E E E E E
EP E E E E E E E E E E E
E E E E E
EP EP E E E E E E
TSP EP
IL EFPP

TB TSP
SVP TB
PPPP
SSSS
SSSP TTTTS
SPPPP TTSPP
TTTTS
TTSP
ST MARYS HEAVY RAIL RAILWAY STATION
PPPPP
SSSPS
TTTTTTS
TTSSS PP TB
TB
PACKAGE 9.1
TB AW TB
WATER MAIN CONNECTION (COMPLETE)
IL
EFP

TB WM
STATION STREET STORMWATER
RELOCATION

T
BIN BIN

T
BH FL
FL FL FL
BH
B H
WEST LANE

EGELGL BHH T
BIN BIN BIN EMBEHMH
BIN T
T

T
BIN BIN

E
E
EGL
EGL
STATION STREET

E
E
E
T T
E
E
E
TDP JB BIN
BIN
BIN

GLOSSOP STREET
TE
E
AW

E
GIDLEY STREET

T
CHESHAM STREET

E
E
E
E
T
JB
EP EP EP

TE
E
T

E
T

E
AW
Cad File: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030717.dwg

AW

E
E
E T
E
NARIEL STREET

T
SF

E
E
E
E
EP EP
AW

E
E
E
E
T
E T
E
E
E
WEST LANE

QUEENS STREET

E
E
T
E
E
ACCESS ROAD A

LETHBRIDGE STREET

TE
E
EAST LANE

File Path: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030717.dwg


JB BIN EP

S
BIN T

BU
T

PHILLIP STREET

T
PHILLIP STREET

BU T
BIN BIN EP

S
T T T T T T
TDP
T
JB
TSC
Plot Date: 08/08/22 - 20:28

JB
BIN

EP
100mm AT FULL SIZE

FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: AS SHOWN other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 MOBILISATION AND SITE ESTABLISHMENT
1:1000 @A1 0 10 20 30 40 50 INTERFACE PLAN
DESIGNED JOHN KEARNS 13.05.2022
m
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 1 OF 1 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone57 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030717 00
FOR
LEGEND
N CONSTRUCTION SITE BOUNDARY

17+400
RAIL ALIGNMENT (BY OTHERS)

17+400
STATION BOX (BY OTHERS)

CONTROL LINE AND IDENTIFIER


ST MARYS HEAVY RAIL RAILWAY STATION
MC11
CONTROL LINE AND IDENTIFIER
REFER LOCAL AREA WORKS DRAWINGS
SMWSASBT-CPG-STM-SN100-GL-DRG-030310
MC11 & SMWSASBT-CPG-STM-SN100-GL-DRG-030311

ST MARYS STATION BOX

ADJOINS SMWSASBT-CPG-STM-SN100-GL-DRG-030711
40
48

260
280
300
320
340
461

380
400
420
440
460
STATION STREET

200
220
240
258
MC12

166

160

120
140

80
100
MC20
MC13

FOR STATION STREET,


REFER LOCAL AREA
WORKS DRAWINGS

GIDLEY STREET
20
Cad File: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-GL-DRG-030710.dwg

MC30

ACCESS ROAD A
40

File Path: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-GL-DRG-030710.dwg


FOR ACCESS ROAD A, REFER LOCAL 60
AREA WORKS DRAWINGS

80
Plot Date: 08/08/22 - 20:30

QUEENS STREET

EAST LANE

100

MK3K
MK3I
100mm AT FULL SIZE

PHILLIP STREET

FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: AS SHOWN other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 GENERAL ALIGNMENT
1:500 @A1 0 5 10 15 20 25
DESIGNED JOHN KEARNS 13.05.2022 ALIGNMENT CONTROL PLAN
m SHEET 1
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 1 OF 2 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone56 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-GL-DRG-030710 00
Cad File: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-GL-DRG-030710.dwg

File Path: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-GL-DRG-030710.dwg


Plot Date: 08/08/22 - 20:30
100mm AT FULL SIZE

SCALE: CLIENT: The information


other
than the
purpose.
SydneyThe
shown
Metro
Service
Project.
on this
Providers
drawingaccept
is for the
no liability
purposes arising
of thefrom
Sydney
the use
Metro
of this DRAWN
Project
drawing
only.and
No the
warranty
information
is given
shown
or implied
thereon
as to
forits
anysuitability
purposeforother
any SYDNEY METRO - WESTERN SYDNEY AIRPORT –STATION BOXES AND TUNNELLING WORKS

Co-ordinate
Original
REV. System: AMENDMENT DESCRIPTION Design Datum:
Height This
Verified
Approved
by
Date sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. DRG CHECK
DESIGNED
DESIGN
APPROVED
CHECK DRG No:
FILE
STATUS: EDMS No:
SHEET:
OF
REV ©
VER
LEGEND
N CONSTRUCTION SITE BOUNDARY

17+400
RAIL ALIGNMENT (BY OTHERS)

17+400
STATION BOX (BY OTHERS)

CONTROL LINE AND IDENTIFIER

MC11
CONTROL LINE AND IDENTIFIER
REFER LOCAL AREA WORKS DRAWINGS
SMWSASBT-CPG-STM-SN100-GL-DRG-030310
MC11 & SMWSASBT-CPG-STM-SN100-GL-DRG-030311

CRANE PAD

40
ST MARYS STATION BOX

20

0
ADJOINS SMWSASBT-CPG-STM-SN100-GL-DRG-030710

60
0
80
100
120
140
160
180
200
220
240
260

1 2 3 4 5 6
140
160
180
200

20
0

MC13
12

MC12
0
20
40
60
80

40
60
80
100

MC20

CHESHAM STREET
Cad File: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-GL-DRG-030711.dwg

GLOSSOP STREET

File Path: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-GL-DRG-030711.dwg


LETHBRIDGE STREET
Plot Date: 08/08/22 - 20:32
100mm AT FULL SIZE

PHILLIP STREET

FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: AS SHOWN other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 GENERAL ALIGNMENT
1:500 @A1 0 5 10 15 20 25
DESIGNED JOHN KEARNS 13.05.2022 ALIGNMENT CONTROL PLAN
m
SHEET 2
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 2 OF 2 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone56 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-GL-DRG-030711 00
Cad File: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-GL-DRG-030711.dwg

File Path: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-GL-DRG-030711.dwg


Plot Date: 08/08/22 - 20:32
100mm AT FULL SIZE

REV. AMENDMENT DESCRIPTION Design


by
Verified Approved
by
SCALE:
Date CLIENT: The information
other
than the
purpose.
SydneyThe
shown
Metro
Service
Project.
on this
Providers
drawingaccept
is for the
no liability
purposes arising
of thefrom
Sydney
the use
Metro
of this DRG
DESIGNED
DRAWN
DESIGN
Project
drawing CHECK
only.and CHECK
No the
warranty
information
is given
shown
or implied
thereon
as to
forits
anysuitability
purposeforother
any SYDNEY METRO - WESTERN SYDNEY AIRPORT
FILE No:
STATUS: –STATION BOXES AND TUNNELLING
SHEET: ©
EDMS
OF No:WORKS

Co-ordinate System:
Original Height Datum: This sheet may be prepared using colour and may be incomplete
NOTE: Doif not
copied
scale from this drawing. APPROVED DRG No: VER
REV
47.113
47.089
47.058
46.994
LEGEND

46.231
0.000
PROPOSED DESIGN LEVEL

0.373
0.873
1.373

7.363
-6.30
%

44.336
-12
.74
% EXISTING SURFACE LEVEL
AEW PACKAGE 1.4
-12 AFC SURFACE

22.219
.76
%
NOTES:

42.006
REFER TO AEW PACKAGE 1.4 FOR

41.356
FURTHER DETAILS

40.926
-13
.00

40.134
%

45.134

50.134

38.850

38.032

38.000
-8.6

74.278
0%

83.797

93.316
RL 30.000

VERTICAL P=???
L=??? L=19.038 P=-0.34%
K=???
L=??? K=2.306 L=336.736
GEOMETRY

HORIZONTAL L=39.302
R=15.065 L=11.388
L=10.378
R=25.000 L=15.799
L=384.229

GEOMETRY

DESIGN

37.841

37.501
47.113

44.619

42.110
42.023

40.879

40.078
39.732

38.887

38.440

38.429

37.998

37.977

37.909

37.773

37.705

37.637

37.569

37.467
LEVELS

EXISTING
Cad File: C:\WSASBT-EXPORT\Plotting\SMWSASBT-CPG-STM-SN100-MB-DRG-030720.dwg

46.811

46.801

44.481
47.252

42.880
42.824

46.930

46.382

42.344
45.066

44.043

46.829

46.797

46.196

45.407

43.416

42.116

41.937

41.556

41.348
LEVELS

200.000

220.000

240.000

250.000
100.000

120.000

140.000

160.000

180.000
20.000

39.333
40.000

50.685

60.000
64.023

73.852

79.823

80.000

93.852
CHAINAGE
0.000

LONGITUDINAL SECTION - MC12


SCALE 1:500H 1:100V

File Path: C:\WSASBT-EXPORT\Plotting\SMWSASBT-CPG-STM-SN100-MB-DRG-030720.dwg


Plot Date: 08/08/22 - 19:09

RL 30.000

VERTICAL P=-0.34%
L=336.736
GEOMETRY
100mm AT FULL SIZE

HORIZONTAL L=384.229

GEOMETRY

DESIGN
37.161
37.467

37.433

37.365

37.297

37.229

37.093

37.025

36.957

36.889
LEVELS

EXISTING
41.131
41.348

40.604

40.233

39.718

39.149

38.705

38.252

37.669

37.139

36.847

36.657

36.165
36.136
LEVELS
250.000

260.000

280.000

300.000

320.000

340.000

360.000

380.000

400.000

420.000

431.694

440.000

460.000
461.662
CHAINAGE

LONGITUDINAL SECTION - MC12


SCALE 1:500H 1:100V

FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: AS SHOWN other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
1:100 @A1 0 1 2 3 4 5
DRAWN COLIN BIBLE 13.05.2022 MOBILISATION AND SITE ESTABLISHMENT
m
JOHN KEARNS 13.05.2022 LONGITUDINAL SECTIONS - MC12
DESIGNED
1:500 @A1 0 5 10 15 20 25
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
m FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 1 OF 2 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone56 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030720 00
D-SW
RL37.729 EXISTING UTILS - STORM WATER
LEGEND
E-WATER
RL38.604 EXISTING UTILS - POTABLE WATER
PROPOSED DESIGN LEVEL
E-SEWER
RL39.387 EXISTING UTILS - SEWERAGE
AEW PACKAGE 1.4 (EXISTING LEVEL)
E-ELEC
EXISTING UTILS - ELECTRICAL
ORIGINAL SURFACE LEVEL RL40.484

E-COMMS
RL41.321 EXISTING UTILS - COMMS
E-COMMS

1.0
RL47.243

:1
D-SW
IL46.322

1.0
E-COMMS

:1
RL45.683

1.0
:1

1.0

0.8
:1

MC1A

MC10
MC12

:
1
MC13

MC12
MC1B

MC13
1.0
:1

1.0
:1
D-SW
IL36.965 E-COMMS
RL36.765 E-COMMS
RL36.397

RL 30.000 RL 30.000

DESIGN DESIGN
42.031

37.231
47.304
46.597

44.807

43.109

40.644

39.400

38.222

38.429

46.158

37.574

37.943
37.968

37.472

37.384
38.550
LEVELS LEVELS
EXISTING EXISTING

37.281
47.304
47.275

47.232

47.202

47.183

47.158

47.144

47.135

46.689

46.158

46.218

45.668
45.602

37.080
37.245
LEVELS LEVELS
-10.641
-17.110
-16.426

-14.690

-13.040

-11.992

-21.272

-14.749
DESIGN DESIGN

26.511
15.081

17.061

28.709

32.532
13.526
13.804
14.477

15.614
15.848
16.185
16.539
16.850
-9.428

-8.278

0.000

0.000
1.000
OFFSETS OFFSETS

CH:110.000
CH:80.000

E-COMMS
RL46.326

D-SW
IL45.338

0.8
:1

MC10
MC12
MC13

MC1B
Cad File: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030742.dwg

D-SW
IL36.493 E-COMMS
RL36.286

RL 30.000

DESIGN

38.078

37.977

37.823

37.700
37.682

37.641
38.023
LEVELS
EXISTING

46.561

45.591
45.591

41.311
46.040

45.632

45.532
45.000
44.504
43.972
43.440
42.907
42.375
41.843

40.778
40.245

38.656
LEVELS

-15.106
DESIGN

21.984
22.529

23.644
24.874
24.875
24.875
24.877
10.282
11.282
12.282
13.282

14.282
15.282

18.264
6.351
4.266
0.000

3.074
3.080

5.350

7.282
8.282
9.282
OFFSETS

File Path: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030742.dwg


CH:100.000

E-COMMS
RL46.816

D-SW
IL45.830
Plot Date: 09/08/22 - 16:53

0.8
:1

MC1A

MC10
MC12
MC13

MC1B
D-SW
E-COMMS
IL36.603
RL36.466
100mm AT FULL SIZE

RL 30.000

DESIGN

47.073

37.672

38.035

38.269
38.228
38.115
LEVELS
EXISTING

47.073

46.914

46.357
LEVELS

-21.774

-14.524
DESIGN

13.051
13.336
14.239
14.246
0.000
OFFSETS

CH:90.000
FOR CONSTRUCTION
CLIENT: The information shown on this drawing is for the purposes of the Sydney Metro Project only. No warranty is given or implied as to its suitability for any
SCALE: AS SHOWN other purpose. The Service Providers accept no liability arising from the use of this drawing and the information shown thereon for any purpose other
than the Sydney Metro Project.
SYDNEY METRO - WESTERN SYDNEY AIRPORT – STATION BOXES AND TUNNELLING WORKS
ST MARYS STATION
DRAWN COLIN BIBLE 13.05.2022 MOBILISATION AND SITE ESTABLISHMENT
1:200 @A1 0 2 4 6 8 10
DESIGNED JOHN KEARNS 13.05.2022 CROSS SECTIONS - STATION BOX - MC12
m SHEET 1
00 APPROVED FOR CONSTRUCTION TJ MS CL 04.08.22 DRG CHECK GARY VALLANCE 13.05.2022
Design
FILE No: SMWSASBT-CPG-STM-SN100-MB-M3D-030701 SHEET: 1 OF 5 ©
REV. AMENDMENT DESCRIPTION Verified Approved Date
by by by BG&E - bgeeng.com DESIGN CHECK TREVOR WOODWARD 13.05.2022 STATUS: APPROVED FOR CONSTRUCTION EDMS No:
REV VER
A1 Original Co-ordinate System: GDA2020/MGAZone57 Height Datum: AHD This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing. SYDNEY METRO CIVIL APPROVED CHRIS LAWTON 13.05.2022 DRG No: SMWSASBT-CPG-STM-SN100-MB-DRG-030742 00
D-SW
RL37.729 EXISTING UTILS - STORM WATER
LEGEND
E-WATER
RL38.604 EXISTING UTILS - POTABLE WATER
PROPOSED DESIGN LEVEL
E-SEWER
RL39.387 EXISTING UTILS - SEWERAGE
AEW PACKAGE 1.4 (EXISTING LEVEL)
E-ELEC
EXISTING UTILS - ELECTRICAL
ORIGINAL SURFACE LEVEL RL40.484

E-COMMS
RL41.321 EXISTING UTILS - COMMS
E-COMMS E-COMMS
RL44.242 RL44.268

1.0
E-COMMS
:1.
RL42.688
0:1
1.0
:1

0 .8

MC12

MC12
:1

MC13
MC13
1.0
:1

1.1
:1
1.1
:1

E-COMMS E-COMMS
RL35.972 RL35.866

RL 30.000 RL 30.000

DESIGN DESIGN

37.841
44.606

43.057

42.040

40.759
37.472

37.866

39.316

37.535

37.739
37.764
LEVELS LEVELS
EXISTING EXISTING

43.031
44.606

44.642

44.404
44.373

43.057

43.046

42.980

42.844
42.823
43.009
LEVELS LEVELS
-20.171

-10.071
-14.749

-13.934

-12.873

-11.547
DESIGN DESIGN

-8.171
0.000

0.000
1.000

1.000
OFFSETS OFFSETS

CH:140.000 CH:170.000

E-COMMS
RL44.741

E-COMMS E-COMMS
RL43.238 RL43.268
0.8

0.8
MC12
:1

MC12
:1
MC13

MC13
0.8
1:
Cad File: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030743.dwg

E-COMMS
RL36.043 E-COMMS
RL35.829

RL 30.000 RL 30.000

DESIGN DESIGN
45.087

37.506

37.900

43.575

41.912

37.406

37.773
37.798
37.875

LEVELS LEVELS
EXISTING EXISTING
44.751

43.541
45.087

45.122

44.713

43.575

43.563

43.359
43.345
LEVELS LEVELS
-20.511

-14.749

-19.387

-18.124

-14.694
DESIGN DESIGN
0.000

0.000
1.000

1.000
OFFSETS OFFSETS

File Path: C:\adms\dms38810\SMWSASBT-CPG-STM-SN100-MB-DRG-030743.dwg


CH:130.000 CH:160.000

E-COMMS
Plot Date: 09/08/22 - 16:54

RL45.267

E-COMMS E-COMMS
RL43.730 RL43.732
0.8
:1

MC12

MC12
0.8
MC13

MC13
:1
E-COMMS
RL36.219 E-COMMS
100mm AT FULL SIZE

RL35.901

RL 30.000 RL 30.000

DESIGN DESIGN
45.563

44.105
37.540

37.909
37.934

37.438

37.807
37.832
LEVELS LEVELS
EXISTING EXISTING
45.201
45.563

45.685

45.267

44.105

44.133

43.913
43.897
LEVELS LEVELS
-20.846

You might also like