MAHAWELI WATER SECURITY INVESTMENT PROGRAM (MWSIP)

CoNSTRUCTION OF NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP)CONSTRUCTION OF


MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET TUNNEL (5+250 KM
TO 22+gOO XwI)
CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR
INLET TUNNEL (FROM 5+250 KM TO 22+3gg KM) _ NWPCP - ICB-2
APPROVAL SHEET FOR DOCUMENTS PREPARED BY THE CONTRACTOR
Contract No.: MM DE/MWSt P/ADB/NWPCP ilC9-2t3267-3268-5RVtCBt2017 I 003
Name of Contractor: China State Construction Engineering Corporation Ltd.
Title of the Document: Comments for "Cross Section DWGs from 17+708.5 to 17+800 km+m"
Submittal of Cross Section Drawing of
Drawing / Document No.: DK17+708.5 - DK 17+696 Rev.02 Revision o2
NW-r02-C-CSS-00'1 4-0023

Received by Letter Ref.: CSC EC-ICB2-PMDSC-255-201 9 Dated: 28 May 2019


Previous Approval
AN Appr. Sheet No. NWPCP/ICB2/CSDR 07
Status:
Present Approval Status: AN Appr. Sheet No. NWPCP/ICB2/CSDR 23

A = Approved
AN= Approved except as Noted
RR = Return for Correction and
Resubmission

Comments

1. Berms are not required for excavation from 17+708 5lo 17+732.5.

2. O&M road sections should be indicated at both side of the canal in 17+708.5 and 17+710 sections.
Furthermore, road crossing over the cut and cover should be indicated Fill details for these
sections will be provided.

3 Drawing number and revision number should be corrected in 17+708.5 section.

4 300mm should be maintain from original ground level for O & M Roads.

5. Twin conduit Type B should be used from 17+732.5 up to a pornt in between 17+780 and 17+790
considering the expansion joint sequence and over burden is not more than 3.0m.

6. You may proceed work incorporating the corrections but corrected drawings should be submitted.
Find the attached for more details.

7. For the excavation pay line and the backfilling refer the instructions and the drawings given in
letter PM DSC-NWP-Site/l CB2lCSCECiO076.

8. Only the centre line coordinates were checked. Offsets should be according to the required
dimensions.

The approval documents shall not relieve the Contractor of any of his duties, obligations or responsibilities under the
Contract.

eIoa /totf
Date
Twin Rectangular Conduit Types with Reference to Chainage

Cha inage Type

17+708.5

t7+7L0
17+720 Type - E

U+730
L7+732.5

17+732.5

U+740
t7+750
1l+760
tvpe -/
1l+77O

t7+780
A{uB
L7+790

17+800 \ww
I PLArE:0262
CLAIMABLE CROSS SECTION AREA

ITEN4 CS AREA UNIT


TABLE OF COORDINATES
common Excavalion 30.1579 m'
W
POINT NORTHING EASTING
RockExcavation 7.3566 m'
E
A s86922.483 470738.139
[-l con".utu 8.3250 m'

coursesand B s86926.060 470739.080


E m'

585918.900 470737.200
ffi Graded Fitter m' C

ffi Rubbrework m'

Fitt by unctassified soit 10,0281 m'

=
177 Fir by GLASS "B" soir 1.7090 m'

N:] Fir by cLASS "D" soir 20.01,67 m'

RubbleandABC Reptacement m'


W
Site Clearance and Top Soil Stripping 30.0000 m

nl
t
n ,artt
J v ,'d
\, a/"

DATUN4 =
iirirrll

DESiGN
LEVEL

DESIGN
OFFSET

EXISTING
LEVEL

EXISTING
OFFSET

N9TE
,1
. ALL DIMENSIONS ARE IN METERS. 2. THE DEFINITION OF a.b AND c SHALL BE AS FOLLOWS. THE CONDUIT TYPE IS DECIDED BASED ON THE DETAILS GIVEN IN 4. THE EXISTING GROUND LEVELS AT CANAL SECTION CHANGING
a = TOP LEVEL OF BOTTOM SLAB NW-IO2-E-STR-OO2 REV.A , NW-IO2-E-PLS-OO1 REV,O , NW-IO2-E-PLS-OO1 REV.B LOCATION 17+708,5 WERE OBTAINED BY INTERPOLATING
b = TOP LEVEL OF RHS TOP SLAB DRAWINGS & LETTER NO : PMDSC-NWP-Site/lCB2/CSCEC/0076 THE ADJACENT SURVEYED TWO LOCATIONS.( 17+700.0 AND 17+710.0 ).
c = TOP LEVEL OF LHS TOP SLAB

EMPLOYER. ..NSULTANT: CONTRACIOR DArE: 28 May 2019


diffl.*r%,^, ffi ,ltii\tfilh\ 11 lrt{ 2\ rJ
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DEMOCRATIC SOCIAUST REPUBLIC OF IJRAWINGS NO
'6i;T5:ilJI'(;,;*. NrRf\s mff^i11, NWPC/ICB-2
NO, DATE DESCRIPTION
LTD

?i,yl[oH'"'^],.". CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA NW-102-C-CSS-0262


@
IET
".,.yl};li1
MAHAWELI WATER \E'',
mm CHEC(EOBY CHECIiED 3\
(FE /DEr
#33 18/F %rkland Otfce BLt lding. Park Slreet C0l0mb0 02

RECOMI/EilOED FY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
(FROM 5+250 km TO 22+300 km) sHEEr 01 OF 01
SECURITY INVESMENT PROGRAM NAME GUO HAIPENG G.A.D.I.SItVA LI BO LI JIAIiSHUANG
SUALE:
SIGNATURE
tlhflf, o.t.* lp.,R tL 1l tz CROSS SECTION 17+708'5 km H&V=1:200 A3 (oL
DATE 2810512019 2810512019 28t05t2019 2A10512019
PLATE : 0014

CLAIMABLE CROSS SECTION AREA

ITEM CS AREA UNIT


TABLE OF COORDINATES
Common Excavation 29.9896 m²
POINT NORTHING EASTING
Rock Excavation 7.8852 m²

Concrete 8.3250 m² A 586922.865 470736.689

Course Sand - m² B 586926.440 470737.630

Graded Filter - m² C 586919.290 470735.750

Rubble Work - m²

Fill by Unclassified Soil - m²

Fill by CLASS "B" Soil 11.8828 m²

Fill by CLASS "D" Soil 20.0136 m²

Rubble and ABC Replacement - m²

Site Clearance and Top Soil Stripping 30.0000 m

Chainage at 17+710.0 km
CL

207
CL OF O & M
206 ROAD 5
2 1
1 1.5 1.5
205 1 c b 1
204
2 2
203 1 1
Rock Level a a
202
5 5
201 1 C A B 1
ROW

ROW
DATUM = 200m (masl)
205.057

204.748

202.118
205.444
201.294

201.294
204.444
201.769

201.769
201.769
201.769

201.769
204.444
201.294
201.294
205.444
202.118

204.556

204.608
204.775

DESIGN
LEVEL
14.05

4.70

4.70
9.54

7.18

5.86
5.20

3.70
3.65
3.10

0.45
0.00
0.45

3.10
3.65
3.70

5.20
5.86

7.08

9.38
DESIGN
OFFSET

204.511
204.802

204.776

204.732

204.669
204.669

204.687
204.775

204.645

204.565
EXISTING
LEVEL

20.21
23.23

17.59

11.30

10.97

17.12
4.82

0.00
0.02

5.13
EXISTING
OFFSET

NOTE
1. ALL DIMENSIONS ARE IN METERS. 2. THE DEFINITION OF a,b AND c SHALL BE AS FOLLOWS. 3. THE CONDUIT TYPE IS DECIDED BASED ON THE DETAILS GIVEN IN
a = TOP LEVEL OF BOTTOM SLAB NW-I02-E-STR-002 REV.A , NW-I02-E-PLS-001 REV.0 , NW-I02-E-PLS-001 REV.B DRAWINGS &
b = TOP LEVEL OF RHS TOP SLAB LETTER NO : PMDSC-NWP-Site/ICB2/CSCEC/0076
c = TOP LEVEL OF LHS TOP SLAB
CONSULTANT: CONTRACTOR: REVISION
EMPLOYER: LAHMEYER
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 28 May 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 00
01
31/01/2019 1st Submission
25/03/2019 2nd Submission
CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA NW-I02-C-CSS-0014
APPROVED BY TO MAHAKITHULA RESERVOIR INLET TUNNEL
CHECKED BY CHECKED BY
SURVEYED BY DRAWN BY CHECKED BY RECOMMENDED BY 02 27/05/2019 3rd Submission
MAHAWELI WATER (SURVEYOR / DRF/ CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 01 OF 01
NAME GUO HAIPENG G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM SCALE: ORIGINAL REV.
SIGNATURE
CROSS SECTION 17+710 km H & V = 1:200 A3 02
DATE 28/05/2019 28/05/2019 28/05/2019 28/05/2019
PLATE : 0015

CLAIMABLE CROSS SECTION AREA

ITEM CS AREA UNIT


TABLE OF COORDINATES
Common Excavation 20.3075 m²
POINT NORTHING EASTING
Rock Excavation 11.4198 m²

Concrete 8.3250 m² A 586925.416 470727.020

Course Sand - m² B 586928.990 470727.960

Graded Filter - m² C 586921.840 470726.080

Rubble Work - m²

Fill by Unclassified Soil 10.3202 m²

Fill by CLASS "B" Soil 1.7552 m²

Fill by CLASS "D" Soil 20.3976 m²

Rubble and ABC Replacement m²

Site Clearance and Top Soil Stripping 30.0000 m

Chainage at 17+720.0 km
CL

207 CL OF O & M
ROAD
206 2 2 5
1 1 1
205 c b
204
2 2
203 1 1
Rock Level
202 a a
5 5
201 1 C A B 1
ROW

ROW
DATUM = 200m (masl)

201.291

201.291
204.441

204.441
201.291
201.291
205.144

205.104

205.587

205.079

202.476

201.766

201.766
201.766
201.766

201.766

202.476

204.836

205.326

204.836
DESIGN
LEVEL
15.00

10.56
4.70

4.70
9.44

8.24

7.24

5.94

3.70
3.65
3.10

0.45
0.00
0.45

3.10
3.65
3.70

5.94

7.12

8.12
DESIGN
OFFSET
205.141

204.821
205.074

205.046

205.006
205.006

204.860
205.185

205.165

204.845

204.755
EXISTING
LEVEL
25.54

26.07
19.35

15.57

10.57

14.95

19.09
5.98

0.00
0.03

7.75
EXISTING
OFFSET

NOTE
1. ALL DIMENSIONS ARE IN METERS. 2. THE DEFINITION OF a,b AND c SHALL BE AS FOLLOWS. 3. THE CONDUIT TYPE IS DECIDED BASED ON THE DETAILS GIVEN IN
a = TOP LEVEL OF BOTTOM SLAB NW-I02-E-STR-002 REV.A , NW-I02-E-PLS-001 REV.0 , NW-I02-E-PLS-001 REV.B DRAWINGS &
b = TOP LEVEL OF RHS TOP SLAB LETTER NO : PMDSC-NWP-Site/ICB2/CSCEC/0076
c = TOP LEVEL OF LHS TOP SLAB
CONSULTANT: CONTRACTOR: REVISION
EMPLOYER: LAHMEYER
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 28 May 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 00
01
31/01/2019 1st Submission
25/03/2019 2nd Submission
CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA NW-I02-C-CSS-0015
APPROVED BY TO MAHAKITHULA RESERVOIR INLET TUNNEL
CHECKED BY CHECKED BY
SURVEYED BY DRAWN BY CHECKED BY RECOMMENDED BY 02 27/05/2019 3rd Submission
MAHAWELI WATER (SURVEYOR / DRF/ CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 01 OF 01
NAME GUO HAIPENG G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM SCALE: ORIGINAL REV.
SIGNATURE
CROSS SECTION 17+720 km H & V = 1:200 A3 02
DATE 28/05/2019 28/05/2019 28/05/2019 28/05/2019
\
I PLATE:0016
CLAIMABLE CROSS SECTION AREA

ITEN/I CS AREA UNIT


TABLE OF COORDINATES
Fl===l
uommon hxcavalron 20.4922
-
FLllA m'?

POINT NORTHING EASTING


RockExcavation 15.0054 m'
E
concrete 8.3250
A ssaszt.set gl 470717,3s\O)
E m'

coursesand B 586931.s40 470718.290


E m'

586924.390 4707t6.41.0
ffi Graded Fitter m' C

ffi Rubblework nc
Yl)'
m'

lL=
aY
Filt bv unctassified soir 1,4.2726 m' V'
m Fir by oLASS "B" soir r.5246 m' /Y ,'v
NS Fir by GLASS "D" soil 19.1224 m' \/
Rubble and ABC Replacement m' -\1
M
Site Clearance and Top Soil Stripping 30.0000
\ rV -o/
e\'
m

d\ .\',"V
I\ \{-
t)J\ \)

n
Yf ,t" Chainage at 17+730.0 km
f\0
a
I

RoAD , 0
5

DATUIV] = i iqii i i

DESIGN
LEVEL

DESIGN
OFFSET

EXISTING
LEVEL

EXISTING
OFFSET

NOTE
1. ALL DIMENSIONS ARE IN METERS. 2. THE DEFINITION OF a,b AND c SHALL BE AS FOLLOWS. 3. THE CONDUIT TYPE IS DECIDED BASED ON THE DETAILS GIVEN IN
a = TOP LEVEL OF BOTTOM SLAB NW-IO2.E.STR-OO2 REV,A, NW.IO2-E-PLS-OO,I REV.O , NW-IO2-E-PLS-OO'I REV.B DRAWINGS &
b = TOP LEVEL OF RHS TOP SLAB LETTER NO : PMDSC-NWP-SiIC/ICB2/CSCEC/o076
c = TOP LEVEL OF LHS TOP SLAB

t"to]llo"oor," ..NSULTANT
gS. CONTRACTORI REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DArE: 28 May 20'19
^tl r.f#'";',:"",, 'r!'ji'\,il'nfit +i'ljt{ Z} -'J
-a-
socrALrsr REpuBLrc oF
,,*,.',*'Nt?ilffio*.., za\
di;H::,ilJ.' {il;r - rR(\s m;ffi, rT0
NO. DATE DESCRIPTION NWPC/ICB.2
NW-102-C-CSS-001 6
g'1ilil::1il;#'"'@ .H'CIEL 8Y
N #33 18/F %rkland Offce Bullding Park Slreel. Colombo 02

CHECIEDBY RECOMI/EilDEDE\ 02 01
CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA
TO MAHAKITHULA RESERVOIR INLET TUNNEL
(FROM 5+250 km TO 22+300 km) sHEEr 0.1 oF 01
LI LI
SECURITY INVESMENT PROGRAM NAI',,1E GUO HAIPENG G.A D,I.SILVA BO JIANSHUANG
SCALE: HEV
trlb{f, t.t,:V y'*;R 43cz
SIGNATURE
CROSS SECTION 17+730 km H&V=1:200 A3 02
DATE 2810512019 2A10512019 28t05t2019 28t05t2019
("

IPLATE:0263
CLAII\,1ABLE CROSS SECTION AREA

ITEI\4 CS AREA UNIT


TABLE OF COORDINATES
commonExcavation
ffi 21,.2512 m'
POINT NORTHING EASTING
RockExcavation 15.9049 m'
E
A 586928.605 47071,4.933
l--_-] con","te 8.3250 m'

E coursesand m'
B)- B 586932.180 470715.880

470113.990
ffi GradedFitter m' c 586925.030

ffi Rubbrework m' .16 \r


E:]
l.rjjjj-:-:-::r
-.- -. I Fill bv Unclassified Soil 15.7516 m' ./ \'\
m Fir by cLASS "B" soir 1.5651 m'
,\\ / /
N
.\* rY {
Fiu by cLASS "D" soir 18.9034 m'

Rubbte and ABC Replacement


[ffi m'

d)
Site Clearance and Top Soil Stripping 30,0000 m

t+/
'n-fl'f
\/
0tl
n{y' Chainage at 17+732.5 km
vf, Pd
.5t^

.=-:1

trtrtit
tlllllit
tlttll
DATUM =

DESIGN
LEVEL

DESIGN
OFFSET

EXISTING
LEVEL

EXISTING
OFFSET

NOrE
1. ALL DIMENSIONS ARE IN METERS- 2. THE DEFINITION OF a.b AND c SHALL BE AS FOLLOWS. THE CONDUIT TYPE IS DECIDED BASED ON THE DETAILS GIVEN IN THE EXISTING GROUND LEVELS AT CANAL SECTION CHANGING
a = TOP LEVEL OF BOTTOM SLAB NW-IO2.E-STR-OO2 REV.A , NW-IO2-E-PLS.OO1 REV,O , NW-IO2-E-PLS-OO1 REV,B LOCATION 17+732.5 WERE OBTAINED BY INTERPOLATING
.17+730.0
b = TOP LEVEL OF RHS TOP SLAB DRAWINGS & LETTER NO : PMDSC-NWP-Site/lCB2/CSCEC/0076 THE ADJACENT SURVEYED TWO LOCATIONS.( AND 17+740.0 ).
c = TOP LEVEL OF LHS TOP SLAB

t"toJIIo"*o,c ..NSULTANT: REVISION DArE: 28 May 2019


d ffiu',l%"^, E=G ,t{iitt1ilJ} 4 t-Ft'l. 2\ -d NORTH WESTERN PROVICE CANAL PROJECT
socrALrsr REpuBLrc oF DRAWNGS NO.
'Uffi:};:TJl- (1;;',.. - nr r n(rs ffi";1l;r,
NO. DATE DESCRIPTION NWPC/ICB-2
NW-102-C-CSS-0263
@,*.r#f,lii:'fliton:r,,,,
.EEg MAHAWELI WATER @
\a'Y CEC(EOBY CHEC(EOB\
lREr0E,
#33, 18/F %(land 0tllce B! lding Park Slreet C0l0mb0 02

CHECTEDBY RE'OU'E!DEL]E!
7tast201 )n
CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA
TO MAHAKITHULA RESERVOIR INLET TUNNEL
(FROM 5+250 km TO 22+300 km) sHEEr 01 OF 01
SECURITY INVESMENT PROGRAM NAME GUO HAIPENG GA,D,I,SILVA LI BO LI JIA!SHUANG
SUALt:
SIGNATURE
d'iftflf, t.t.* r'ptR 4itt cRoss sEcTIoN 17+732.5 km H&V=1:200 A3 01
OATE 2A1O5t2019 28tO1t2019 2810512019 28t05t2019
\z

I PLArE:0264
CLAIIV]ABLE CROSS SECTION AREA

HIIfr
lTEtll CS AREA UNIT
sx TABLE OF COORDINATES

VJJJJ)

E
common Excavation

RockExcavation
2t,6732

17.1726
m'

m' ,fr"# POINT NORTHING EASTING

E concrete 10.2962 m'


\r V A 586928.605 47071,4.933

586932.2s0
t] course sand m'
ov,-
B 47071,5.900

ffi
F!ffi
Graded Fitter m'
\- C 586924.950 410713.910

ffi
E
m
Rubbrework

Fitt by unctassified soit

Fir by oLASS "B" soir


1.4.5706

1. s690
m'

m'

m'
f,n v
NN Fir by oLASS "D" soir t9.9147 m'
(,(
Rubbte and ABC Replacement m'
M
Site Clearance and Top Soil Stripping 30.0000 m

.x >,
_{
hr/ -d ry
6)
f
f
{
Chainage at 17+732.5 km
5q{
cro

$ 6{
tlttr;ltt
rrrrir
lrrr:r
ttltrlitt.
llllttl ttrttriltt
llltltl tlllll.ittt
i ri i ii |
I lri ,
lr , I ii'i
I t I t,
;, [,r.1-i
r, ll I \tr r
|I |I !
I !
I
|

DATUI\4 = I

ttt
DESIGN ltr
LEVEL ttt lttt
ttt ltrt
ttt
DESIGN ltt lttt
OFFSET ttt lttt
ltt lttt

EXISTING
LEVEL

EXISTING
OFFSET

NOTE
1. ALL DIMENSIONS ARE IN METERS THE DEFINITION OF a,b AND c SHALL BE AS FOLLOWS. 3. THE CONDUIT TYPE IS DECIDED BASED ON THE DETAILS GIVEN IN
A
THE EXISTING GROUND LEVELS AT CANAL SECTION CHANGING
a = TOP LEVEL OF BOTTOM SLAB NW-IO2-E.STR-OO2 REV.A, NW-IO2.E-PLS-OO1 REV.O, NW-IO2-E-PLS.OO1 REV.B LOCATION 17+732,5 WERE OBTAINED BY INTERPOLATING
b = TOP LEVEL OF RHS TOP SLAB DRAWINGS & LETTER NO : PMDSC-NWP-Site/lCB2lCSCEC/0076 THE ADJACENT SURVEYED TWO LOCATIONS.( 17+730.0 AND 17+740.0 )
c = TOP LEVEL OF LHS TOP SLAB

u"tollXo"oo,c coNSULrANrr CONTRACTOR REVISION DArE: 28 May 20'19


socrALrsr REpuBLrc oF
d l.#rH'""^1i"^^, ffi IIII, l, I r.l'd ji.tt)'i l^ /r lrt.l 2\',1 NORTH WESTERN PROVICE CANAL PROJECT

-o- ,,",,,iltfillio*.., .a\ di;H:,#," (;3.,'- NWPC/ICB.2


NO. DATE DESCRIPTION
ItllJlI ('Hi\A $rTE C'0r,srRlJcrt\ Er,cNEERr,rG c!qp0RA-t0\ L-D

GE
DEvFt opi/ENr AND
(.8) ENVrRoNM.r, N rR(s #33, 1 8/F Parkland Otfce Build ng Park Street Colombo 02
00
01
tal03t201 CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA NW.IO2.C-CSS-0264
rEs MAHAWELI WATER \E47 CHEC/EO8Y
(FROM 5+250 km TO 22+300 km) SHEET: 01 OF 01
SECURIry INVESMENT PROGRAM NAME GUO HAIPENG G,A,D,I,SILVA LI BO LI JIANSHUANG
SUALE:
SIGNATURE dleflf, t.l.l7 *,8- 4ltt cRoss sEcTloN 17+732.5 km H&V='l:200 A3 01
DATE 28t0512019 24tO5t2019 24t05t2019 2810512019
PLATE : 0017

CLAIMABLE CROSS SECTION AREA

ITEM CS AREA UNIT


TABLE OF COORDINATES
Common Excavation 24.0237 m²
POINT NORTHING EASTING
Rock Excavation 19.3846 m²

Concrete 10.2962 m² A 586930.518 470707.682

Course Sand - m² B 586934.170 470708.640

Graded Filter - m² C 586926.870 470706.720

Rubble Work - m²

Fill by Unclassified Soil 18.8221 m²

Fill by CLASS "B" Soil 1.5377 m²

Fill by CLASS "D" Soil 19.1389 m²

Rubble and ABC Replacement - m²

Site Clearance and Top Soil Stripping 30.0000 m

Chainage at 17+740.0 km
CL

208
CL OF O & M
207 ROAD
2 2 5
206 1 1 1

205 c b

204 2 2
1 1
Rock Level
203
5 a a 5
202
1 1
201 C A B
ROW

ROW
DATUM = 200m (masl)
205.801

206.201

201.761

201.761
201.761
201.761

201.761
205.716

205.703

203.192

201.186

201.186
204.536

204.536
201.186
201.186

203.192

206.060

205.632
205.585
DESIGN
LEVEL

10.51
15.00

4.78

4.77
9.63

8.43

7.43

6.18

3.78
3.73
3.10

0.45
0.00
0.45

3.10
3.72
3.77

6.18

7.37

8.37
DESIGN
OFFSET
205.891

205.501
205.501
205.844

205.807

205.653

205.696

205.614
205.775

205.575
EXISTING
LEVEL
25.10

20.20
18.97

16.02

10.65

14.79
5.17

0.00
0.00

6.68
EXISTING
OFFSET

NOTE
1. ALL DIMENSIONS ARE IN METERS. 2. THE DEFINITION OF a,b AND c SHALL BE AS FOLLOWS. 3. THE CONDUIT TYPE IS DECIDED BASED ON THE DETAILS GIVEN IN
a = TOP LEVEL OF BOTTOM SLAB NW-I02-E-STR-002 REV.A , NW-I02-E-PLS-001 REV.0 , NW-I02-E-PLS-001 REV.B DRAWINGS &
b = TOP LEVEL OF RHS TOP SLAB LETTER NO : PMDSC-NWP-Site/ICB2/CSCEC/0076
c = TOP LEVEL OF LHS TOP SLAB
CONSULTANT: CONTRACTOR: REVISION
EMPLOYER: LAHMEYER
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 28 May 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 00
01
31/01/2019 1st Submission
25/03/2019 2nd Submission
CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA NW-I02-C-CSS-0017
APPROVED BY TO MAHAKITHULA RESERVOIR INLET TUNNEL
CHECKED BY CHECKED BY
SURVEYED BY DRAWN BY CHECKED BY RECOMMENDED BY 02 27/05/2019 3rd Submission
MAHAWELI WATER (SURVEYOR / DRF/ CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 01 OF 01
NAME GUO HAIPENG G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM SCALE: ORIGINAL REV.
SIGNATURE
CROSS SECTION 17+740 km H & V = 1:200 A3 02
DATE 28/05/2019 28/05/2019 28/05/2019 28/05/2019
PLATE : 0018

CLAIMABLE CROSS SECTION AREA

ITEM CS AREA UNIT


TABLE OF COORDINATES
Common Excavation 25.8408 m²
POINT NORTHING EASTING
Rock Excavation 23.7201 m²

Concrete 10.2962 m² A 586933.069 470698.012

Course Sand - m² B 586936.720 470698.980

Graded Filter - m² C 586929.420 470697.050

Rubble Work - m²

Fill by Unclassified Soil 22.2627 m²

Fill by CLASS "B" Soil 1.6615 m²

Fill by CLASS "D" Soil 18.0580 m²

Rubble and ABC Replacement - m²

Site Clearance and Top Soil Stripping 30.0000 m

Chainage at 17+750.0 km
CL

208
CL OF O & M
ROAD
207
2 2 5
1 1 1
206

205 c b
2 2
204 1 1
Rock Level
203
5 a a 5
202
1 1
201 C A B
ROW

ROW
DATUM = 200m (masl)

205.846
206.017

205.952

206.489

203.550

201.184

201.184
204.534
201.758

201.758
201.758
201.758

201.758
204.534
201.184
201.184

203.550

205.770

206.256
205.975

DESIGN
LEVEL

10.41
14.99

4.78

4.77
9.59

8.46

7.46

6.25

3.78
3.73
3.10

0.45
0.00
0.45

3.10
3.72
3.77

6.25

7.36

8.36
DESIGN
OFFSET
206.147

206.000

205.990

205.908

205.770

205.943

205.928
205.875
205.875
EXISTING
LEVEL

14.31
20.42

21.04
14.26

8.63

2.30

0.00
0.02

7.35
EXISTING
OFFSET

NOTE
1. ALL DIMENSIONS ARE IN METERS. 2. THE DEFINITION OF a,b AND c SHALL BE AS FOLLOWS. 3. THE CONDUIT TYPE IS DECIDED BASED ON THE DETAILS GIVEN IN
a = TOP LEVEL OF BOTTOM SLAB NW-I02-E-STR-002 REV.A , NW-I02-E-PLS-001 REV.0 , NW-I02-E-PLS-001 REV.B DRAWINGS &
b = TOP LEVEL OF RHS TOP SLAB LETTER NO : PMDSC-NWP-Site/ICB2/CSCEC/0076
c = TOP LEVEL OF LHS TOP SLAB
CONSULTANT: CONTRACTOR: REVISION
EMPLOYER: LAHMEYER
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 28 May 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 00
01
31/01/2019 1st Submission
25/03/2019 2nd Submission
CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA NW-I02-C-CSS-0018
APPROVED BY TO MAHAKITHULA RESERVOIR INLET TUNNEL
CHECKED BY CHECKED BY
SURVEYED BY DRAWN BY CHECKED BY RECOMMENDED BY 02 27/05/2019 3rd Submission
MAHAWELI WATER (SURVEYOR / DRF/ CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 01 OF 01
NAME GUO HAIPENG G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM SCALE: ORIGINAL REV.
SIGNATURE
CROSS SECTION 17+750 km H & V = 1:200 A3 02
DATE 28/05/2019 28/05/2019 28/05/2019 28/05/2019
PLATE : 0019

CLAIMABLE CROSS SECTION AREA

ITEM CS AREA UNIT


TABLE OF COORDINATES
Common Excavation 28.2498 m²
POINT NORTHING EASTING
Rock Excavation 27.5302 m²

Concrete 10.2962 m² A 586935.620 470688.343

Course Sand - m² B 586939.270 470689.310

Graded Filter - m² C 586931.970 470687.380

Rubble Work - m²

Fill by Unclassified Soil 24.0433 m²

Fill by CLASS "B" Soil 1.7790 m²

Fill by CLASS "D" Soil 17.0551 m²

Rubble and ABC Replacement - m²

Site Clearance and Top Soil Stripping 30.0000 m

Chainage at 17+760.0 km
CL

208 CL OF O & M
ROAD
207 2 2 2
2
1 11 1
206

205 2 c b 2
1 1
204 Rock Level

203
5 5
202 a a
1 1
201 C A B
ROW

ROW
DATUM = 200m (masl)

201.181

201.181
204.531

204.531
201.181
201.181
206.385

206.323

206.819
203.908

201.756

201.756
201.756
201.756

201.756

203.908
206.619
206.116

206.125
DESIGN
LEVEL
12.94

10.15
4.78

4.77
7.53

6.54
6.32

3.78
3.73
3.10

0.45
0.00
0.45

3.10
3.72
3.77

5.76
6.42
7.42
DESIGN
OFFSET
206.383

206.419

206.316
206.408

206.322

206.218
206.217

206.106

206.130

206.119
206.325

EXISTING
LEVEL
28.50

22.28

15.03
14.49

11.52

17.75
4.73
8.64

3.77

0.05
0.00
EXISTING
OFFSET

NOTE
1. ALL DIMENSIONS ARE IN METERS. 2. THE DEFINITION OF a,b AND c SHALL BE AS FOLLOWS. 3. THE CONDUIT TYPE IS DECIDED BASED ON THE DETAILS GIVEN IN
a = TOP LEVEL OF BOTTOM SLAB NW-I02-E-STR-002 REV.A , NW-I02-E-PLS-001 REV.0 , NW-I02-E-PLS-001 REV.B DRAWINGS &
b = TOP LEVEL OF RHS TOP SLAB LETTER NO : PMDSC-NWP-Site/ICB2/CSCEC/0076
c = TOP LEVEL OF LHS TOP SLAB
CONSULTANT: CONTRACTOR: REVISION
EMPLOYER: LAHMEYER
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 28 May 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 00
01
31/01/2019 1st Submission
25/03/2019 2nd Submission
CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA NW-I02-C-CSS-0019
APPROVED BY TO MAHAKITHULA RESERVOIR INLET TUNNEL
CHECKED BY CHECKED BY
SURVEYED BY DRAWN BY CHECKED BY RECOMMENDED BY 02 27/05/2019 3rd Submission
MAHAWELI WATER (SURVEYOR / DRF/ CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 01 OF 01
NAME GUO HAIPENG G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM SCALE: ORIGINAL REV.
SIGNATURE
CROSS SECTION 17+760 km H & V = 1:200 A3 02
DATE 28/05/2019 28/05/2019 28/05/2019 28/05/2019
PLATE : 0020

CLAIMABLE CROSS SECTION AREA

ITEM CS AREA UNIT


TABLE OF COORDINATES
Common Excavation 30.2486 m²
POINT NORTHING EASTING
Rock Excavation 31.3922 m²

Concrete 10.2962 m² A 586938.171 470678.674

Course Sand - m² B 586941.820 470679.640

Graded Filter - m² C 586934.520 470677.710

Rubble Work - m²

Fill by Unclassified Soil 31.5024 m²

Fill by CLASS "B" Soil 1.3985 m²

Fill by CLASS "D" Soil 16.1302 m²

Rubble and ABC Replacement - m²

Site Clearance and Top Soil Stripping 30.0000 m

Chainage at 17+770.0 km
CL

209
CL OF O & M
208 ROAD
2 2 2
2
207 1 11 1

206
2
205 2
1 c b
1
Rock Level
204

203
5 5
202 a a
1 1
201 C A B
ROW

ROW
DATUM = 200m (masl)
206.999

206.824

207.296
204.266

201.179

201.179
204.529
201.754

201.754
201.754
201.754

201.754
204.529
201.179
201.179

204.266
207.140

206.644

206.672
DESIGN
LEVEL
12.86

10.15
4.78

4.77
7.67

6.73
6.39

3.78
3.73
3.10

0.45
0.00
0.45

3.10
3.72
3.77

6.39
6.59

7.58
DESIGN
OFFSET
207.081

206.561
206.561

206.791

206.241
206.720

206.940

206.709
EXISTING
LEVEL
21.17

23.22
16.28

15.14

13.50

17.63
0.01
0.00
EXISTING
OFFSET

NOTE
1. ALL DIMENSIONS ARE IN METERS. 2. THE DEFINITION OF a,b AND c SHALL BE AS FOLLOWS. 3. THE CONDUIT TYPE IS DECIDED BASED ON THE DETAILS GIVEN IN
a = TOP LEVEL OF BOTTOM SLAB NW-I02-E-STR-002 REV.A , NW-I02-E-PLS-001 REV.0 , NW-I02-E-PLS-001 REV.B DRAWINGS &
b = TOP LEVEL OF RHS TOP SLAB LETTER NO : PMDSC-NWP-Site/ICB2/CSCEC/0076
c = TOP LEVEL OF LHS TOP SLAB
CONSULTANT: CONTRACTOR: REVISION
EMPLOYER: LAHMEYER
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 28 May 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 00
01
31/01/2019 1st Submission
25/03/2019 2nd Submission
CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA NW-I02-C-CSS-0020
APPROVED BY TO MAHAKITHULA RESERVOIR INLET TUNNEL
CHECKED BY CHECKED BY
SURVEYED BY DRAWN BY CHECKED BY RECOMMENDED BY 02 27/05/2019 3rd Submission
MAHAWELI WATER (SURVEYOR / DRF/ CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 01 OF 01
NAME GUO HAIPENG G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM SCALE: ORIGINAL REV.
SIGNATURE
CROSS SECTION 17+770 km H & V = 1:200 A3 02
DATE 28/05/2019 28/05/2019 28/05/2019 28/05/2019
PLATE : 0021

CLAIMABLE CROSS SECTION AREA

ITEM CS AREA UNIT


TABLE OF COORDINATES
Common Excavation 27.5687 m²
POINT NORTHING EASTING
Rock Excavation 35.3061 m²

Concrete 10.2962 m² A 586940.722 470669.005

Course Sand - m² B 586944.370 470669.970

Graded Filter - m² C 586937.070 470668.040

Rubble Work - m²

Fill by Unclassified Soil 32.3894 m²

Fill by CLASS "B" Soil 1.7950 m²

Fill by CLASS "D" Soil 15.2832 m²

Rubble and ABC Replacement - m²

Site Clearance and Top Soil Stripping 30.0000 m

Chainage at 17+780.0 km
CL

209
CL OF O & M
ROAD
208
2 2 2 2
207 1 11 1

206 2 2
1 1
205 Rock Level c b

204

203
5 5
202 a a
1 1
201 C A B
ROW

ROW
DATUM = 200m (masl)

201.751

201.751
201.751
201.751

201.751
206.913

206.867

207.359
204.624

201.176

201.176
204.526

204.526
201.176
201.176

204.624
207.254
206.746

206.723
DESIGN
LEVEL

10.51
13.03

6.51
4.78

4.77
7.59

6.60
6.46

3.78
3.73
3.10

0.45
0.00
0.45

3.10
3.72
3.77

6.46

7.53
DESIGN
OFFSET
206.961

206.651
206.987

206.926

206.803
206.803
EXISTING
LEVEL
14.61
25.87

20.08
17.94

0.02
0.00
EXISTING
OFFSET

NOTE
1. ALL DIMENSIONS ARE IN METERS. 2. THE DEFINITION OF a,b AND c SHALL BE AS FOLLOWS. 3. THE CONDUIT TYPE IS DECIDED BASED ON THE DETAILS GIVEN IN
a = TOP LEVEL OF BOTTOM SLAB NW-I02-E-STR-002 REV.A , NW-I02-E-PLS-001 REV.0 , NW-I02-E-PLS-001 REV.B DRAWINGS &
b = TOP LEVEL OF RHS TOP SLAB LETTER NO : PMDSC-NWP-Site/ICB2/CSCEC/0076
c = TOP LEVEL OF LHS TOP SLAB
CONSULTANT: CONTRACTOR: REVISION
EMPLOYER: LAHMEYER
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 28 May 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 00
01
31/01/2019 1st Submission
25/03/2019 2nd Submission
CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA NW-I02-C-CSS-0021
APPROVED BY TO MAHAKITHULA RESERVOIR INLET TUNNEL
CHECKED BY CHECKED BY
SURVEYED BY DRAWN BY CHECKED BY RECOMMENDED BY 02 27/05/2019 3rd Submission
MAHAWELI WATER (SURVEYOR / DRF/ CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 01 OF 01
NAME GUO HAIPENG G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM SCALE: ORIGINAL REV.
SIGNATURE
CROSS SECTION 17+780 km H & V = 1:200 A3 02
DATE 28/05/2019 28/05/2019 28/05/2019 28/05/2019
PLATE : 0022

CLAIMABLE CROSS SECTION AREA

ITEM CS AREA UNIT


TABLE OF COORDINATES
Common Excavation 25.7252 m²
POINT NORTHING EASTING
Rock Excavation 39.2721 m²

Concrete 10.2962 m² A 586943.273 470659.336

Course Sand - m² B 586946.920 470660.300

Graded Filter - m² C 586939.620 470658.370

Rubble Work - m²

Fill by Unclassified Soil 35.8769 m²

Fill by CLASS "B" Soil 1.6317 m²

Fill by CLASS "D" Soil 14.5143 m²

Rubble and ABC Replacement - m²

Site Clearance and Top Soil Stripping 30.0000 m

Chainage at 17+790.0 km
CL

209 CL OF O & M
ROAD
208 2 2 2 2
1 11 1
207

206 2 2
1 1
205 Rock Level c b

204

203 5 5
1 1
202 a a

201 C A B
ROW

ROW
DATUM = 200m (masl)
207.108

204.982

201.174

201.174
204.524
201.748

201.748
201.748
201.748

201.748
204.524
201.174
201.174

204.982
207.524
207.019

207.002
207.205

207.595
DESIGN
LEVEL
12.94

10.53
4.78

4.77
7.60

6.63
6.54

3.78
3.73
3.10

0.45
0.00
0.45

3.10
3.72
3.77

6.54
6.54
7.56
DESIGN
OFFSET
207.212

206.969
206.969

207.028

206.966
207.235

207.085

206.935
EXISTING
LEVEL

17.11
21.37

21.03
14.57

6.34

0.05
0.00

5.90
EXISTING
OFFSET

NOTE
1. ALL DIMENSIONS ARE IN METERS. 2. THE DEFINITION OF a,b AND c SHALL BE AS FOLLOWS. 3. THE CONDUIT TYPE IS DECIDED BASED ON THE DETAILS GIVEN IN
a = TOP LEVEL OF BOTTOM SLAB NW-I02-E-STR-002 REV.A , NW-I02-E-PLS-001 REV.0 , NW-I02-E-PLS-001 REV.B DRAWINGS &
b = TOP LEVEL OF RHS TOP SLAB LETTER NO : PMDSC-NWP-Site/ICB2/CSCEC/0076
c = TOP LEVEL OF LHS TOP SLAB
CONSULTANT: CONTRACTOR: REVISION
EMPLOYER: LAHMEYER
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 28 May 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 00
01
31/01/2019 1st Submission
25/03/2019 2nd Submission
CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA NW-I02-C-CSS-0022
APPROVED BY TO MAHAKITHULA RESERVOIR INLET TUNNEL
CHECKED BY CHECKED BY
SURVEYED BY DRAWN BY CHECKED BY RECOMMENDED BY 02 27/05/2019 3rd Submission
MAHAWELI WATER (SURVEYOR / DRF/ CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 01 OF 01
NAME GUO HAIPENG G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM SCALE: ORIGINAL REV.
SIGNATURE
CROSS SECTION 17+790 km H & V = 1:200 A3 02
DATE 28/05/2019 28/05/2019 28/05/2019 28/05/2019
PLATE : 0023

CLAIMABLE CROSS SECTION AREA

ITEM CS AREA UNIT


TABLE OF COORDINATES
Common Excavation 26.8665 m²
POINT NORTHING EASTING
Rock Excavation 39.7320 m²

Concrete 10.2962 m² A 586945.824 470649.667

Course Sand - m² B 586949.470 470650.630

Graded Filter - m² C 586942.170 470648.700

Rubble Work - m²

Fill by Unclassified Soil 37.1542 m²

Fill by CLASS "B" Soil 1.6568 m²

Fill by CLASS "D" Soil 14.4308 m²

Rubble and ABC Replacement - m²

Site Clearance and Top Soil Stripping 30.0000 m

Chainage at 17+800.0 km
CL

209 CL OF O & M
ROAD
208 2 2 2 2
1 11 1
207
2 2
206 1
Rock Level 1
205 c b

204

203 5 5
1 1
202 a a

201 C A B
ROW

ROW
DATUM = 200m (masl)
207.281

201.171

201.171
204.521

204.521
201.171
201.171

207.661
207.370

205.340
207.768

201.746

201.746
201.746
201.746

201.746

205.340

207.149

207.127
DESIGN
LEVEL
12.94

10.60
6.61
6.61

6.61

7.51
4.78

4.77
7.58

3.78
3.73
3.10

0.45
0.00
0.45

3.10
3.72
3.77

6.49
DESIGN
OFFSET
207.428

207.347

207.154
207.154

207.212

207.150

207.110

207.020
EXISTING
LEVEL

14.91
16.60

11.49

13.06
0.01

3.41
0.00

7.40
EXISTING
OFFSET

NOTE
1. ALL DIMENSIONS ARE IN METERS. 2. THE DEFINITION OF a,b AND c SHALL BE AS FOLLOWS. 3. THE CONDUIT TYPE IS DECIDED BASED ON THE DETAILS GIVEN IN
a = TOP LEVEL OF BOTTOM SLAB NW-I02-E-STR-002 REV.A , NW-I02-E-PLS-001 REV.0 , NW-I02-E-PLS-001 REV.B DRAWINGS &
b = TOP LEVEL OF RHS TOP SLAB LETTER NO : PMDSC-NWP-Site/ICB2/CSCEC/0076
c = TOP LEVEL OF LHS TOP SLAB
CONSULTANT: CONTRACTOR: REVISION
EMPLOYER: LAHMEYER
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 28 May 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 00
01
31/01/2019 1st Submission
25/03/2019 2nd Submission
CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA NW-I02-C-CSS-0023
APPROVED BY TO MAHAKITHULA RESERVOIR INLET TUNNEL
CHECKED BY CHECKED BY
SURVEYED BY DRAWN BY CHECKED BY RECOMMENDED BY 02 27/05/2019 3rd Submission
MAHAWELI WATER (SURVEYOR / DRF/ CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 01 OF 01
NAME GUO HAIPENG G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM SCALE: ORIGINAL REV.
SIGNATURE
CROSS SECTION 17+800 km H & V = 1:200 A3 02
DATE 28/05/2019 28/05/2019 28/05/2019 28/05/2019