You are on page 1of 1
[MAWAWELI WATER SECURITY INVESTMENT PROGRAM (MWSIP) CONSTRUCTION OF NORTH WESTERN PROVINCE CAVAL PROJECT (NWPCP) | CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA To MANAKITHULA RESERVOIR NET TUNNEL (FROM 54250 KM TO 224300 KM) “NWPCP =ICB-2 "APPROVAL SHEET FOR DOCUMENTS PREPARED BY THE CONTRACTOR ‘contact No. ‘MMDE/MWSIP/ADB/NWPCP/ICB-2/3267 3268-5Ri/IC8/2017/003 Name of Contra China State Construction Frgineering Corporation Ld (eam cwsiscaeos Request fr Source Approval of Drawing/Oscument Na: | Coarse Aeregate& Fine Agregat, | Reson Rewo cewsyescec/cos ecevedbyleternet | ESCECACB2-PMOSCS7 2019 aa rosin FreiourApproar sits | Tox ShantNe | CSCECST-2019 Present Approve stats: | AND ‘ox sheetno,_| CSCEC-S7-2019(Tech, i) ‘your submission our comments areas Tallow: 1 Your submitted Test Reports satisied with the specication requirement except AW. 2, Therefore, as discussed, our CE with your ME, the proposed source canbe approved for trial mix ‘only on Submission ofthe Gradation and AlV Tet esuts to confirm tha complies with the requirement specified in Sub Clause 3.2 Volume i, Employer's Requirements of Contract Aareement 3, Thereafter, we grant you to stockpile the material and cry out test on samples collected from stockpiles to very thatthe aggregate is of consistent qualty asin the test results prior to ‘commence the site construction work “he pra dco alot eve th Contactor af ann es obo repo andre Cone ‘Checked by PMOSC G 26124 (2017 Resident ngncer ate

You might also like