[MAWAWELI WATER SECURITY INVESTMENT PROGRAM (MWSIP)
CONSTRUCTION OF NORTH WESTERN PROVINCE CAVAL PROJECT (NWPCP)
| CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA To MANAKITHULA RESERVOIR NET
TUNNEL (FROM 54250 KM TO 224300 KM) “NWPCP =ICB-2
"APPROVAL SHEET FOR DOCUMENTS PREPARED BY THE CONTRACTOR
‘contact No. ‘MMDE/MWSIP/ADB/NWPCP/ICB-2/3267 3268-5Ri/IC8/2017/003
Name of Contra China State Construction Frgineering Corporation Ld
(eam cwsiscaeos
Request fr Source Approval of
Drawing/Oscument Na: | Coarse Aeregate& Fine Agregat, | Reson Rewo
cewsyescec/cos
ecevedbyleternet | ESCECACB2-PMOSCS7 2019 aa rosin
FreiourApproar sits | Tox ShantNe | CSCECST-2019
Present Approve stats: | AND ‘ox sheetno,_| CSCEC-S7-2019(Tech, i)
‘your submission our comments areas Tallow:
1 Your submitted Test Reports satisied with the specication requirement except AW.
2, Therefore, as discussed, our CE with your ME, the proposed source canbe approved for trial mix
‘only on Submission ofthe Gradation and AlV Tet esuts to confirm tha complies with the
requirement specified in Sub Clause 3.2 Volume i, Employer's Requirements of Contract
Aareement
3, Thereafter, we grant you to stockpile the material and cry out test on samples collected from
stockpiles to very thatthe aggregate is of consistent qualty asin the test results prior to
‘commence the site construction work
“he pra dco alot eve th Contactor af ann es obo repo andre Cone
‘Checked by PMOSC
G 26124 (2017
Resident ngncer ate