You are on page 1of 2
MAHAWELI WATER SECURITY INVESTMENT PROGRAM (MWSIP CONSTRUCTION OF NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP) ‘CONSTRUCTION OF WAIN CANAL FROM NEBADAGAHAWATIA TO MAHAKITHULA RESERVOIR | INLET TUNNEL (PROM 6+250 KM TO 224300 KH} = NWPCP ~10B-2 [APPROVAL SHEET FOR DOCUMENTS PREPARED BY THE CONTRACTOR cn Na DENTWSIPADBNWFCPICR ARE <98 SRNCBAOTTON [ones contac | Chin Sai Cnstcion Enireing Corson Us — Tse Cosunent appre Set Mees Stents Dettng craving Document | MA. - 919 Revise Reve eave ater at. | SEGECHWPCP CBT POST. — pz | JOD reves pop San | RR op Shes [ers Presi Armal Situs | AN op Seana | PCP ICEEAS- | We herent forward our Technical Comments on Beta? As agreed by you pase take immediate actin fo submt reports relevant to dewatering, (PMOSC-NWP SteCB2ICSCECION2 dates on 23h August 2076) + As snown in Plan Drawings. New drain, Sit taps may have to be located outside gven ROW. Strely aban consents fom land owners trough a leter before commencing any constuction fr cain. + In Plan Drawing of dewatering from Ch 114500 to Ch11+800, natural shoot fow of ain water vil be blocked as a resut of proposed tm height embankment constucted. Arrange to keep “paces between excavation In Wented water cossng paths considerng exstng levels to ‘acliate water flow in order to avo inundation of upsream landslacces fad use by You. “+ woul be proposed to name he “Mthod Statement fr Dewatering” to “Method Statement {or Groundwater Cnt an Dewatering o! Consbucton Pt + From your submission appears tat the sump pumping method wl be apple to maintain the drawn downed water table. Please note Pat selected method doesnot alow fo perform the excavation nth entra dap and naeds fo bo reet afar each excavation aye ‘+ The proposed size of sump tm (Lx 0.5m (W) x OmyDepth wi not sufcient to Keep a redueed water lve! meter under coneiicton aa. Increase the sump size depending on ‘nation ate “+ In your future eubmission of Dewatering Systems, ised the layout, depth of excavaton pit nd ie period for constuction 25 well, “+ According to Chapter 60 of your MS and Employers Specieatons, kis mentioned thatthe totaled MS shouldbe aubmitad tothe Engineer least 42 dare per dewatering forthe pariular constuction secon. Please arrange to send detaed MS at your east as this is ‘ready delayed fr consderabe prod of tine. Please note that you flo submit detaled IMSin reasonable tne we wil thaw approval sus ofthis MS. ‘+ your neat submission of location specie Method Statements for Dewatering, include the method that you are using to montor GL 25 The GWL shal be reduced by up 101 mater ‘below excavation depth to permit the construction in dry sae ‘+ owoud be recommended io take he soi samples ard tb pera he Wevng tees The grain | | ‘ze dstrbvtion envelope wil alow to apply most stable dewatemng method rather than ‘rect going for sump purging metnod + CSCEC shouts develop the method how te GWL ging tobe menitore. The watar level the well or sump shall be Kept tte level which allows to ensure the GWL drop of 1 mete under te working surface. The water level at tte pumpag pont shall be maintained considering te permeability of so¥ and be subsequert changes of water tale. The locations for GWL montoring shad te selected to aowing to manta the GWL haveg executed the fxcavaton & console works The GINL shale reduced by 1 meter blow excavation depth In case of dewatering system is selected sump see shal be dimensioned in a way to prevent the local eresion ofthe sump snes, yirsrsiee | natin, please adhere to Comments sent send under Envtonmenal Safeguard Management The approval of drawings ad documents shal not alive te Contactor of ay of his dul, abigatons responsibities under the Contact ‘Checked by PDSC ais 5 ))2019 siden’ Enginaee ate

You might also like