[MAHAWEUI WATER SECURITY INVESTMENT PROGRAM (MWSIP)
LL [CONSTRUCTION OF NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP)
‘CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAMAKITHULA RESERVOIRINLET
TUNNEL (FROM 5+250 KM TO 224300 KM) -NWPCP -1C8-2
[APPROVAL SHEET FOR DOCUMENTS PREPARED BY THE CONTRACTOR
Contact No, [MMDE/MWSIP/ADA/NWPCP/ICB.2/3267-3268.SR/ICB/2017/003
[Home of Convaciar’ | China tate Construction Engineering Corpration td
ents Calibration Report” |
ina he Document” Approval Sheet for * submission of tabortary Ea
T
Submission of laboratary
Drawing Cosment No: | Fe eon | M2" :
quipment
Recehedby tetterRet: | CSCECICB2-PMDSC209.2019 | Date 2019/04/29,
PrevausApprowl Sat ‘pe Sheet NS
Present Aoprovalstats: (AW) ‘Ape sheet Ho. | €SCEC-209-20%9(Tech)
‘actor ete
(On your submission our comments are 38 follows.
1 We have no objection withthe submitted cairation repo copies
2 Keepexignal report at lnboratory for evew and prove valiity on anytime when necessary
3 Please place the laboratory equipment as planned, label the tem and display the calbation
reports much a possible
4 Arrange the next calbation before due date in The presence of Engineer with notification well in
advance
5. Further you are requested to submit detal facility of your laboratory including staf, bulding
(layout) and laboratory equipment available vs equied as per Table 1-4 of Sub Clause 1.7.8.3
Volume I for our evow.
| Tie sera rg nd cameras sal alae Cotas fy fh to BRON Or pS nea
heady POSE
alae ales lzeq
Resident Engineer bate