You are on page 1of 3

LEGENDS AND SYMBOLS: REFERENCE:

SOP(STRUCTURAL) PMI-123(ARCHITECTURAL)
NOTE:
1. ARCHITECTURAL & MEPF PLANS
2. NO AVAILABLE CSD REVIT MODEL
YET BASED ON THE LATEST ISSUED
A B C
MEPF BLOCK-OUT MGW-TRANSMIT-006038 -WCC-AED-AR-DR-000-03-10006_C05 ARE BASED ONLY IN FCD, BUT FOR FCD.
-WCC-M001-ST-SD-000-03-20007_2 PMI-109(MEPF) THE SECTION ARE BASED ONLY IN 3. ELEVATION OF SLEEVES AND
MEPF PIPE SLEEVE -WCC-M001-ST-SD-000-03-20008_2 -WCC-WSP-E4-DR-000-03-44363_C04 THE GIVEN REVIT MODEL BY THE BLOCK-OUT ARE PROPOSED AND
SYΔ-TRANSMIT-000016 -WCC-WSP-F2-DR-000-03-22363_C04 CONSULTANT. SUBJECT FOR APPROVAL.
B.O.S. BOTTOM OF SLEEVE -WCC-M001-ST-SD-000-05-21003_1
-WCC-M001-ST-SD-000-05-21004_1
B.O.W.O. BOTTOM OF WALL 1 31/05/2022 ISSUED FOR APPROVAL
OPENING
Rev. Date (D/M/Y) Description

50mm DIA. G.I. PIPE SLEEVE 06/07/2022


50mm DIA. G.I. PIPE SLEEVE
FOR FDAS CONDUIT 68 FOR FDAS CONDUIT
@ +5100mm B.O.S.
#20 N. DOMINGO STREET, BRGY. VALENCIA, QUEZON CITY
TEL/FAX : (+632) 655-1111 LOCAL 813

@ +5100mm B.O.S. TEL : (+632) 655-9164

General Contractor
L05 Aedas (Macau) Lda
EL. +33.600 M Avenida Xian Xing Hai No.105 Centro Golden
Dragon 7 andar D, Nape, Macao
T +853 2875 5530
F +853 2875 5531
macau@aedas.com

6th Floor, Paseo Center,


8757 Paseo de Roxas Avenue, Salcedo
Village, Makati City, 1227, Philippines
2356 T +632 867 8615
F +632 840 4384
1130 information@casasarchitects.com
600
100

100
BSG-202 (600x1150mm) Architect
B.O.B.+32.150
CONSULTING, INC.
FIRETECH, FIRE PROTECTION SYSTEMS

12 11 2000 ENGINEERS CONSULTANTS


BASEMENT-1, MAKATI CINEMA SQUARE PASONG TAMO STREET, MAKATI CITY
TEL NOS. 8811-1777 8811-1778 E-MAIL ADDRESS nbf@globelines.com.ph FAX. NO. 8844-3667

R TUV Rheinland Philippines, Inc.


TUV Rheinland
G/F La Fuerza Bldg. 1, Don Chino Roces Ave.
Precisely Right.
1231 Makati City, Philippines

MEP Engineer

SY2 NOTES:
*FOLLOW TYPICAL WALL OPENING
Structural Engineer
DETAIL FOR
BLOCKOUT NOT GREATER THAN 1m.
RELOCATE *VERIFY MEPF AND ARCHITECTURAL
REQUIREMENTS Project Manager
BLOCKOUTS
NOT ALLOWED SUNTRUST HOME
ON S.W. DEVELOPERS, INC.
26th Floor, Alliance Global Tower, 36th St Cor, 11th Av.,
5100

5100

Uptown Bonifacio, Fort Bonifacio, Taguig City 1634


OWNER/DEVELOPER

REFLECT EXTENT OF S.W. Project Title


BLOCKOUTS NOT ALLOWED ON S.W. Westside City Phase 1 - Site B
Bagong Nayong Pilipino Entertainment
City, Paranaque City
Status
ISSUED FOR APPROVAL
Discipline
3D VIEW MULTI-DISCIPLINARY
2 Drawing Title
L03 T2-B3 CONCRETE BUILDERS
WORK WALL (SECTION & 3D VIEW)
L03
06
SHEET 06 OF 10
EL. +26.900 M
31/05/2022 01:00:00 pm

Drawn by Checked by Approved by


RRF JC/AML GSC
Scale Issue Date Rev.
AS INDICATED MAY 31, 2022 1
SECTION D Drawing Number
1 Scale: 1:40mm WCC-M001-MD-SD-000-03-04051
GENERAL NOTE: DO NOT SCALE FROM DRAWING. USE MARKED DIMENSIONS. TO BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANT'S DRAWINGS. THE CLIENT TO BE IMMEDIATELY NOTIFIED OF ANY DISCREPANCIES. COPYRIGHT ON THE DRAWING RETAINED BY SUNTRUST HOME DEVELOPERS INC.
WF-003959
LEGENDS AND SYMBOLS: REFERENCE:
SOP(STRUCTURAL) PMI-123(ARCHITECTURAL)
NOTE:
1. ARCHITECTURAL & MEPF PLANS
2. NO AVAILABLE CSD REVIT MODEL
YET BASED ON THE LATEST ISSUED
A B C
MEPF BLOCK-OUT MGW-TRANSMIT-006038 -WCC-AED-AR-DR-000-03-10006_C05 ARE BASED ONLY IN FCD, BUT FOR FCD.
-WCC-M001-ST-SD-000-03-20007_2 PMI-109(MEPF) THE SECTION ARE BASED ONLY IN 3. ELEVATION OF SLEEVES AND
MEPF PIPE SLEEVE -WCC-M001-ST-SD-000-03-20008_2 -WCC-WSP-E4-DR-000-03-44363_C04 THE GIVEN REVIT MODEL BY THE BLOCK-OUT ARE PROPOSED AND
SYΔ-TRANSMIT-000016 -WCC-WSP-F2-DR-000-03-22363_C04 CONSULTANT. SUBJECT FOR APPROVAL.
B.O.S. BOTTOM OF SLEEVE -WCC-M001-ST-SD-000-05-21003_1
-WCC-M001-ST-SD-000-05-21004_1 AED:
B.O.W.O. BOTTOM OF WALL 1 31/05/2022 ISSUED FOR APPROVAL
OPENING Ryan Douglas E. Rios - C+A
no adverse comment, others are subject to
structural and mep engineers comments. Rev. Date (D/M/Y) Description
06.30.2022
Contractor shall verify all MEP openings with
CSD coordination prior to construction
50mm DIA. G.I. PIPE SLEEVE
50mm DIA. G.I. PIPE SLEEVE
FOR FDAS CONDUIT 68 FOR FDAS CONDUIT
@ +5100mm B.O.S.
#20 N. DOMINGO STREET, BRGY. VALENCIA, QUEZON CITY
TEL/FAX : (+632) 655-1111 LOCAL 813

@ +5100mm B.O.S. TEL : (+632) 655-9164

General Contractor
L05 Aedas (Macau) Lda
EL. +33.600 M Avenida Xian Xing Hai No.105 Centro Golden
Dragon 7 andar D, Nape, Macao
T +853 2875 5530
F +853 2875 5531
macau@aedas.com

6th Floor, Paseo Center,


8757 Paseo de Roxas Avenue, Salcedo
Village, Makati City, 1227, Philippines
2356 T +632 867 8615
F +632 840 4384
1130 information@casasarchitects.com
600
100

100
BSG-202 (600x1150mm) Architect
B.O.B.+32.150
CONSULTING, INC.
FIRETECH, FIRE PROTECTION SYSTEMS

12 11 2000 ENGINEERS CONSULTANTS


BASEMENT-1, MAKATI CINEMA SQUARE PASONG TAMO STREET, MAKATI CITY
TEL NOS. 8811-1777 8811-1778 E-MAIL ADDRESS nbf@globelines.com.ph FAX. NO. 8844-3667

R TUV Rheinland Philippines, Inc.


TUV Rheinland
G/F La Fuerza Bldg. 1, Don Chino Roces Ave.
Precisely Right.
1231 Makati City, Philippines

MEP Engineer

Structural Engineer

Project Manager

SUNTRUST HOME
DEVELOPERS, INC.
26th Floor, Alliance Global Tower, 36th St Cor, 11th Av.,
5100

5100

Uptown Bonifacio, Fort Bonifacio, Taguig City 1634


OWNER/DEVELOPER

Project Title

Westside City Phase 1 - Site B


Bagong Nayong Pilipino Entertainment
City, Paranaque City
Status
ISSUED FOR APPROVAL
Discipline
3D VIEW MULTI-DISCIPLINARY
2 Drawing Title
L03 T2-B3 CONCRETE BUILDERS
WORK WALL (SECTION & 3D VIEW)
L03
06
SHEET 06 OF 10
EL. +26.900 M
31/05/2022 01:00:00 pm

Drawn by Checked by Approved by


RRF JC/AML GSC
Scale Issue Date Rev.
AS INDICATED MAY 31, 2022 1
SECTION D Drawing Number
1 Scale: 1:40mm WCC-M001-MD-SD-000-03-04051
GENERAL NOTE: DO NOT SCALE FROM DRAWING. USE MARKED DIMENSIONS. TO BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANT'S DRAWINGS. THE CLIENT TO BE IMMEDIATELY NOTIFIED OF ANY DISCREPANCIES. COPYRIGHT ON THE DRAWING RETAINED BY SUNTRUST HOME DEVELOPERS INC.
WSP General comments:
- Approval
LEGENDS of this
AND shop drawing should subject
SYMBOLS: to AED and MCS comments and approval.
REFERENCE: NOTE: 2. NO AVAILABLE CSD REVIT MODEL A B C
- The final CBWD will still subject to coordination with MEFP NSC and approvalPMI-123(ARCHITECTURAL)
SOP(STRUCTURAL) of ISD & CSD, resubmission of 1. ARCHITECTURAL & MEPF PLANS YET BASED ON THE LATEST ISSUED
CBWD drawings MEPF review and approval isMGW-TRANSMIT-006038
for BLOCK-OUT required should there is any update-WCC-AED-AR-DR-000-03-10006_C05 ARE BASED ONLY IN FCD, BUT FOR FCD.
-WCC-M001-ST-SD-000-03-20007_2 PMI-109(MEPF) THE SECTION ARE BASED ONLY IN 3. ELEVATION OF SLEEVES AND
- The approval MEPF
of thisPIPE
shop drawings is only
SLEEVE
applicable to wall penetration, ISD -WCC-WSP-E4-DR-000-03-44363_C04
-WCC-M001-ST-SD-000-03-20008_2 & CSD should be submitted THE GIVEN REVIT MODEL BY THE BLOCK-OUT ARE PROPOSED AND
separately for comment and approval SYΔ-TRANSMIT-000016 -WCC-WSP-F2-DR-000-03-22363_C04 CONSULTANT. SUBJECT FOR APPROVAL.
- Please indicate
B.O.S. the size
BOTTOM OFof pipe sleeve and
SLEEVE bolckout.
-WCC-M001-ST-SD-000-05-21003_1
- Please indicate the opening for which services.
B.O.W.O. BOTTOM OF WALL
-WCC-M001-ST-SD-000-05-21004_1
1 31/05/2022 ISSUED FOR APPROVAL
- The exact conduit size
OPENING to be confirmed by the FS NSC to perform the calculation of AFA system.
- Please ensure the size and setting out of the proposed blockout allow sufficient installation space and correct Rev. Date (D/M/Y) Description

elevation for MEPF installation later.

50mm DIA. G.I. PIPE SLEEVE


50mm DIA. G.I. PIPE SLEEVE
FOR FDAS CONDUIT 68 FOR FDAS CONDUIT
@ +5100mm B.O.S.
#20 N. DOMINGO STREET, BRGY. VALENCIA, QUEZON CITY
TEL/FAX : (+632) 655-1111 LOCAL 813

@ +5100mm B.O.S. TEL : (+632) 655-9164

23/06/2022 General Contractor


L05 Aedas (Macau) Lda
EL. +33.600 M Avenida Xian Xing Hai No.105 Centro Golden
Dragon 7 andar D, Nape, Macao
T +853 2875 5530
F +853 2875 5531
macau@aedas.com

6th Floor, Paseo Center,


8757 Paseo de Roxas Avenue, Salcedo
Village, Makati City, 1227, Philippines
2356 T +632 867 8615
F +632 840 4384
1130 information@casasarchitects.com
600
100

100
BSG-202 (600x1150mm) Architect
B.O.B.+32.150
CONSULTING, INC.
FIRETECH, FIRE PROTECTION SYSTEMS

12 11 2000 ENGINEERS CONSULTANTS


BASEMENT-1, MAKATI CINEMA SQUARE PASONG TAMO STREET, MAKATI CITY
TEL NOS. 8811-1777 8811-1778 E-MAIL ADDRESS nbf@globelines.com.ph FAX. NO. 8844-3667

R TUV Rheinland Philippines, Inc.


TUV Rheinland
G/F La Fuerza Bldg. 1, Don Chino Roces Ave.
Precisely Right.
1231 Makati City, Philippines

MEP Engineer
Please confirm if opening for conduit can be cored
on site, otherwise please provide pipe sleeve for
minimum DN50 FDAS conduit as the exact conduit Structural Engineer
size to be confirmed by the FS NSC to perform the
calculation of AFA system. (Typical for all FDAS
conduit)
Project Manager

SUNTRUST HOME
DEVELOPERS, INC.
26th Floor, Alliance Global Tower, 36th St Cor, 11th Av.,
5100

5100

Uptown Bonifacio, Fort Bonifacio, Taguig City 1634


OWNER/DEVELOPER

Project Title

Westside City Phase 1 - Site B


Bagong Nayong Pilipino Entertainment
City, Paranaque City
Status
ISSUED FOR APPROVAL
Discipline
3D VIEW MULTI-DISCIPLINARY
2 Drawing Title
L03 T2-B3 CONCRETE BUILDERS
WORK WALL (SECTION & 3D VIEW)
L03
06
SHEET 06 OF 10
EL. +26.900 M
31/05/2022 01:00:00 pm

Drawn by Checked by Approved by


RRF JC/AML GSC
Scale Issue Date Rev.
AS INDICATED MAY 31, 2022 1
SECTION D Drawing Number
1 Scale: 1:40mm WCC-M001-MD-SD-000-03-04051