You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

REFERENCE DRAWINGS KEY PLAN


A B C D E
SR. DOCUMENT TITLE DOCUMENT NO.

29°
3529 2672 3220 2806
MCR - ARCHITECTURAL DETAILS, ELEVATIONS, SECTIONS AND FINISHING (INCLUDING
2100 2100 2100 01
EQUIPMENT LAYOUT)
SECI-DVC-KTPS6MW-GWG-CIV-32
3529 285 759 913 441 MCR
(L2) (L2) (L2) 02 MCR - PLINTH BEAM GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-GWG-CIV-35 LOCATION

H 1050 03 MCR - LINTEL BEAM GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-GWG-CIV-36 H
525 525
(L5) 04 MCR - ROOF GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-GWG-CIV-37

05 MCR - CABLE TRENCH GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-GWG-CIV-40

450
W EX W W NOTES:
5 1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.

412
2. THIS DRAWING IS NOT TO BE SCALED ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
648

3. EL(+) 2.55M CORRESPONDS TO BOTTOM OF THE LINTEL BEAM.


CONCRETE MIX GRADE MAX.AGGREGATE SIZE

PCC M10 20mm


LINTEL BEAM M30 20mm } (CONFIRMING TO
IS 456:2000)
4. ALL REINFORCEMENT STEEL SHALL BE HYSD (FE 500D) CONFIRMING TO IS 1786.
G G

2100
(L2)
5. DEVELOPMENT LENGTH/LAP LENGTH FOR REINFORCEMENT BARS SHALL BE 50XDIA OF THE LARGEST BAR AND NOT MORE THAN 50% OF
W
3331

BARS SHALL BE SPLICED AT ANY ONE SECTION.


2100
(L2)

W 6. CLEAR COVER FOR MAIN REINFORCEMENT BARS SHALL BE AS FOLLOWS:


(a) LINTEL BEAM = 40MM.
7. LAPPING OF BARS SHALL BE SUITABLY STAGGERED AND IN NO CASE MORE THAN 50% OF BARS SHALL BE LAPPED AT ANY SECTION.
8. ALL HOOKS, BENDS,LAPS,SPLICES SHALL BE AS PER RELEVANT IS CODES.
9. MINIMUM 20MM SPACER BAR SHALL BE PROVIDED AT ALL DOUBLE LAYER REINFORCEMENT.
10. DOWEL BARS SHALL BE LEFT FROM COLUMNS FOR BEAMS WHEREVER REQUIRED.
11. 50 THK PCC SHALL BE PROVIDED BELOW THE LINTEL FOR THE BEARING AREA UPON WALL.

D2 D1 LEGEND:-
1215
(L1)

D3 230
4 115 T.O.C.:- TOP OF CONCRETE

F 1576 3-Y10 F.G.L.:- FINISH GROUND LEVEL


F

2150
1363 2-Y10 T.O.F.:- TOP OF FOOTING
(L1) (L1)
2198

B.O.F.:- BOTTOM OF FOOTING


Y8@75mmC/C Y8@ 75mmC/C T.P.L.:- TOP OF PLINTH LEVEL

150

150
1781

D1 B.S.L.:- BOTTOM OF SLAB

1576
(L1)
1588 LvL.+2.55m LvL.+2.55m T.P.P.L.:- TOP OF PARAPET LEVEL
2315
750 (L6)
F.F.L.:- FINISH FLOOR LEVEL
(L1) 50mm Thk. PCC L.L. :- LINTEL LEVEL
50mm Thk. PCC

525
D2 3-Y10 2-Y12

79
D3

50
3 D3

50
SL/EX1
1215
1593
SL
(L1) W
L3 L1

2100
E E

1050
(L5)

(L2)
(L3) L
1778
(L3)

EX

1576
2100

(L1)
1800

(L4)

D3 230 3-Y10
SL/EX1

2009

D4
(L6)

(L7)
900
EX1 D1
1663 3-Y10

525
(L3) L.L.
Y8@75mmC/C

150
2

795
D2 SL/EX1 LvL.+3.90m
15

3-Y10
904 50MM

1876
(L1)
(L6) D1 50mm Thk. PCC THK.PCC
D 3-Y10 8Ø 75 C/C D

50
2100
(L2)

TYP. DETAIL OF CUT LINTEL BEAM


W
L6 (WITH WALL ON BOTH SIDES)
1215
(L1)

2100
(L2)
(SUITABLY CONSIDERED FOR DOORS, WINDOWS)
3594

D3 W
L
3-Y10
115
450
2-Y10 L.L.
1344

C D C

849
Y8@ 75mmC/C

150
3-Y10
LvL.+3.90m 50MM
1 COLUMN
THK.PCC
450

V/EX W W 50mm Thk. PCC 8Ø 75 C/C


2-Y12 TYP. DETAIL OF CUT LINTEL BEAM
257

50
1050 2100 2100 (WALL ON ONE SIDE AND COLUMN ON OTHER SIDES)
2210 554 3956
(L5) (L2) (L2)
L7 (SUITABLY CONSIDERED FOR DOORS, WINDOWS)
LINTEL BEAM LAYOUT 01 SECOND SUBMISSION KK 07.03.24 LT 07.03.24 LT 07.03.24

B 00 FIRST SUBMISSION KK 27.02.24 LT 27.02.24 LT 27.02.24 B


230 230 NAME DATE NAME DATE NAME DATE
230 REV. DESCRIPTION
Y8@75mmC/C Y8@75mmC/C DRAWN CHECKED APPROVED
AS-BUILT APPROVAL INFORMATION PROPOSAL
3-Y10 5-Y10 3-Y10 DRAWING ISSUED FOR

Y10@75mmC/C Y10@75mmC/C Ld Y10@75mmC/C PROJECT : 6 MWac FLOATING SOLAR PV (FSPV) PLANTS ON RAW WATER RESERVOIRS OF
80

KODERMA THERMAL POWER PLANT

Y8@75mmC/C CLIENT:- NAME SIGN. DATE


DAMODAR VALLEY CORPORATION (DVC)
Ld Ld DRN. JS 07.03.2024
150

150
100

100

100

CONSULTANT:- SCALE
DGN. JS 07.03.2024
LvL.+2.55m LvL.+2.55m LvL.+3.90m SOLAR ENERGY CORPORATION OF INDIA LTD N.T.S
A CKD. KA 07.03.2024 A
Y8@75 C/C Y8@75 C/C Y8@75 C/C EPC CONTRACTOR:-
GENSOL ENGINEERING LTD.
APPD. SC 07.03.2024

450 3-Y10 3-Y10 450 3-Y10 DRAWING NO. REV.


750 DRAWING TITLE: SECI-DVC-KTPS6MW-GWG-CIV-36

L2 L4
R1

L5 MCR - LINTEL BEAM GENERAL ARRANGEMENT AND


REINFORCEMENT DETAILS SHT. No. 01 No. OF SHT. 01 OF 01
1 2 3 4 5 6 7 8 9 10 11 12