You are on page 1of 3

LEGENDS AND SYMBOLS: REFERENCE:

SOP(STRUCTURAL) PMI-123(ARCHITECTURAL)
NOTE:
1. ARCHITECTURAL & MEPF PLANS
2. NO AVAILABLE CSD REVIT MODEL
YET BASED ON THE LATEST ISSUED
A B C
MEPF BLOCK-OUT MGW-TRANSMIT-006038 -WCC-AED-AR-DR-000-03-10006_C05 ARE BASED ONLY IN FCD, BUT FOR FCD.
-WCC-M001-ST-SD-000-03-20007_2 PMI-109(MEPF) THE SECTION ARE BASED ONLY IN 3. ELEVATION OF SLEEVES AND
MEPF PIPE SLEEVE -WCC-M001-ST-SD-000-03-20008_2 -WCC-WSP-E4-DR-000-03-44363_C04 THE GIVEN REVIT MODEL BY THE BLOCK-OUT ARE PROPOSED AND
SYΔ-TRANSMIT-000016 -WCC-WSP-F1-DR-000-03-21363_C04 CONSULTANT. SUBJECT FOR APPROVAL.
B.O.S. BOTTOM OF SLEEVE -WCC-M001-ST-SD-000-05-21003_1 -WCC-WSP-F2-DR-000-03-22363_C04 SY2 NOTES:
-WCC-M001-ST-SD-000-05-21004_1
B.O.W.O. BOTTOM OF WALL *FOLLOW TYPICAL WALL OPENING 1 31/05/2022 ISSUED FOR APPROVAL
OPENING DETAIL FOR
Rev. Date (D/M/Y) Description
150X150mm BLOCKOUT FOR BLOCKOUT NOT GREATER THAN 1m.
100MM DIA. G.I. PIPE SLEEVE 80MM DIA. BFS-SPR *VERIFY MEPF AND ARCHITECTURAL
BF FOR Ø80mm BFS-SPR
@+4750mm B.O.S. 50mm DIA. G.I. PIPE SLEEVE
@ +4675mm B.O.W.O. REQUIREMENTS
300X300mm BLOCKOUT FOR
FOR 40MM DIA. BFS-SPR 150MM BFS RISER AND FDAS
#20 N. DOMINGO STREET, BRGY. VALENCIA, QUEZON CITY

100 TEL/FAX : (+632) 655-1111 LOCAL 813

100MM DIA. G.I. PIPE SLEEVE @ +4726mm B.O.S. CONDUIT @ +4600mm B.O.W.O.
TEL : (+632) 655-9164

FOR Ø50mm BFS-SPR General Contractor


@+4750mm B.O.S.
Aedas (Macau) Lda
Avenida Xian Xing Hai No.105 Centro Golden
Dragon 7 andar D, Nape, Macao
T +853 2875 5530
F +853 2875 5531
macau@aedas.com

6th Floor, Paseo Center,


06/07/2022 8757 Paseo de Roxas Avenue, Salcedo
Village, Makati City, 1227, Philippines
50MM DIA. G.I. PIPE SLEEVE T +632 867 8615
FOR Ø40mm BFS-SPR F +632 840 4384
information@casasarchitects.com
@+4775mm B.O.S.
185 Architect
138171 321 650
675 CONSULTING,
FIRETECH,
ENGINEERS
FIRE PROTECTION
CONSULTANTS
INC.
SYSTEMS

BASEMENT-1, MAKATI CINEMA SQUARE PASONG TAMO STREET, MAKATI CITY


TEL NOS. 8811-1777 8811-1778 E-MAIL ADDRESS nbf@globelines.com.ph FAX. NO. 8844-3667

75
BSB-38 (1200x1500mm)
5 B.O.B.+31.800 3 TUV Rheinland
Precisely Right.
R TUV Rheinland Philippines, Inc.
G/F La Fuerza Bldg. 1, Don Chino Roces Ave.

300
1231 Makati City, Philippines

MEP Engineer
6 4
2

150
300
150 1

(CHB DROP/HANGER WALL) Structural Engineer

REFLECT EXTENT OF S.W.

1902

1851

1776
BLOCKOUTS NOT ALLOWED
ON S.W. Project Manager

SUNTRUST HOME
DEVELOPERS, INC.
26th Floor, Alliance Global Tower, 36th St Cor, 11th Av.,
Uptown Bonifacio, Fort Bonifacio, Taguig City 1634
4775
4750

OWNER/DEVELOPER
4726

4675

4600
Project Title

Westside City Phase 1 - Site B


Bagong Nayong Pilipino Entertainment
City, Paranaque City
Status
ISSUED FOR APPROVAL
Discipline
MULTI-DISCIPLINARY

3D VIEW Drawing Title

2 L03 T2-B3a CONCRETE BUILDERS


WORK WALL (SECTION & 3D VIEW)
06
SHEET 03 OF 10
31/05/2022 01:00:00 pm

Drawn by Checked by Approved by


RRF JC/AML GSC
Scale Issue Date Rev.
AS INDICATED MAY 31, 2022 1
SECTION A Drawing Number
1 Scale: 1:40mm WCC-M001-MD-SD-000-03-04048
GENERAL NOTE: DO NOT SCALE FROM DRAWING. USE MARKED DIMENSIONS. TO BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANT'S DRAWINGS. THE CLIENT TO BE IMMEDIATELY NOTIFIED OF ANY DISCREPANCIES. COPYRIGHT ON THE DRAWING RETAINED BY SUNTRUST HOME DEVELOPERS INC.
WF-003959
LEGENDS AND SYMBOLS: REFERENCE:
SOP(STRUCTURAL) PMI-123(ARCHITECTURAL)
NOTE:
1. ARCHITECTURAL & MEPF PLANS
2. NO AVAILABLE CSD REVIT MODEL
YET BASED ON THE LATEST ISSUED
A B C
MEPF BLOCK-OUT MGW-TRANSMIT-006038 -WCC-AED-AR-DR-000-03-10006_C05 ARE BASED ONLY IN FCD, BUT FOR FCD.
-WCC-M001-ST-SD-000-03-20007_2 PMI-109(MEPF) THE SECTION ARE BASED ONLY IN 3. ELEVATION OF SLEEVES AND
MEPF PIPE SLEEVE -WCC-M001-ST-SD-000-03-20008_2 -WCC-WSP-E4-DR-000-03-44363_C04 THE GIVEN REVIT MODEL BY THE BLOCK-OUT ARE PROPOSED AND
SYΔ-TRANSMIT-000016 -WCC-WSP-F1-DR-000-03-21363_C04 CONSULTANT. SUBJECT FOR APPROVAL.
B.O.S. BOTTOM OF SLEEVE -WCC-M001-ST-SD-000-05-21003_1 -WCC-WSP-F2-DR-000-03-22363_C04
-WCC-M001-ST-SD-000-05-21004_1 AED:
B.O.W.O. BOTTOM OF WALL 1 31/05/2022 ISSUED FOR APPROVAL
OPENING others are subject to structural and mep
engineers comments. Rev. Date (D/M/Y) Description

Ryan Douglas E. Rios - C+A 150X150mm BLOCKOUT FOR Contractor shall verify all MEP openings with
100MM DIA. G.I. PIPE SLEEVE 06.30.2022 80MM DIA. BFS-SPR CSD coordination prior to construction
BF FOR Ø80mm BFS-SPR
@+4750mm B.O.S. 50mm DIA. G.I. PIPE SLEEVE
@ +4675mm B.O.W.O.

300X300mm BLOCKOUT FOR


FOR 40MM DIA. BFS-SPR 150MM BFS RISER AND FDAS
#20 N. DOMINGO STREET, BRGY. VALENCIA, QUEZON CITY

100 TEL/FAX : (+632) 655-1111 LOCAL 813

100MM DIA. G.I. PIPE SLEEVE @ +4726mm B.O.S. CONDUIT @ +4600mm B.O.W.O.
TEL : (+632) 655-9164

FOR Ø50mm BFS-SPR General Contractor


@+4750mm B.O.S.
Aedas (Macau) Lda
AED: Avenida Xian Xing Hai No.105 Centro Golden
Dragon 7 andar D, Nape, Macao
adjust all this blockouts at the T +853 2875 5530
F +853 2875 5531
face of the right side wall to macau@aedas.com

clear the stair exit passageway 6th Floor, Paseo Center,


8757 Paseo de Roxas Avenue, Salcedo
Village, Makati City, 1227, Philippines
50MM DIA. G.I. PIPE SLEEVE T +632 867 8615
FOR Ø40mm BFS-SPR F +632 840 4384
information@casasarchitects.com
@+4775mm B.O.S.
185 Architect
138171 321 650
675 CONSULTING,
FIRETECH,
ENGINEERS
FIRE PROTECTION
CONSULTANTS
INC.
SYSTEMS

BASEMENT-1, MAKATI CINEMA SQUARE PASONG TAMO STREET, MAKATI CITY


TEL NOS. 8811-1777 8811-1778 E-MAIL ADDRESS nbf@globelines.com.ph FAX. NO. 8844-3667

75
BSB-38 (1200x1500mm)
5 B.O.B.+31.800 3 TUV Rheinland
Precisely Right.
R TUV Rheinland Philippines, Inc.
G/F La Fuerza Bldg. 1, Don Chino Roces Ave.

300
1231 Makati City, Philippines

MEP Engineer
6 4
2

150
300
150 1

(CHB DROP/HANGER WALL) Structural Engineer

1902

1851

1776
Project Manager

SUNTRUST HOME
DEVELOPERS, INC.
26th Floor, Alliance Global Tower, 36th St Cor, 11th Av.,
Uptown Bonifacio, Fort Bonifacio, Taguig City 1634
4775
4750

OWNER/DEVELOPER
4726

4675

4600
Project Title

Westside City Phase 1 - Site B


Bagong Nayong Pilipino Entertainment
City, Paranaque City
Status
ISSUED FOR APPROVAL
Discipline
MULTI-DISCIPLINARY

3D VIEW Drawing Title

2 L03 T2-B3a CONCRETE BUILDERS


WORK WALL (SECTION & 3D VIEW)
06
SHEET 03 OF 10
31/05/2022 01:00:00 pm

Drawn by Checked by Approved by


RRF JC/AML GSC
Scale Issue Date Rev.
AS INDICATED MAY 31, 2022 1
SECTION A Drawing Number
1 Scale: 1:40mm WCC-M001-MD-SD-000-03-04048
GENERAL NOTE: DO NOT SCALE FROM DRAWING. USE MARKED DIMENSIONS. TO BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANT'S DRAWINGS. THE CLIENT TO BE IMMEDIATELY NOTIFIED OF ANY DISCREPANCIES. COPYRIGHT ON THE DRAWING RETAINED BY SUNTRUST HOME DEVELOPERS INC.
WSP General comments:
- Approval
LEGENDS of this
ANDshop drawing should subject
SYMBOLS: to AED and MCS comments and approval.
REFERENCE:
SOP(STRUCTURAL) PMI-123(ARCHITECTURAL)
NOTE:
- The final CBWD will still subject to coordination with MEFP NSC and approval of ISD & CSD, resubmission of CBWDARCHITECTURAL
1. & MEPF
drawings for review PLANS
and
2. NO AVAILABLE CSD REVIT MODEL
YET BASED ON THE LATEST ISSUED
A B C
MEPFshould
approval is required BLOCK-OUT MGW-TRANSMIT-006038
there is any update -WCC-AED-AR-DR-000-03-10006_C05 ARE BASED ONLY IN FCD, BUT FOR FCD.
-WCC-M001-ST-SD-000-03-20007_2 PMI-109(MEPF) THE SECTION ARE BASED ONLY IN 3. ELEVATION OF SLEEVES AND
- The approval of this shop drawings is only-WCC-M001-ST-SD-000-03-20008_2
MEPF PIPE SLEEVE
applicable to wall penetration, ISD & CSD should be submitted separately for comment and approval
-WCC-WSP-E4-DR-000-03-44363_C04 THE GIVEN REVIT MODEL BY THE BLOCK-OUT ARE PROPOSED AND
- Please indicate the size of pipe sleeve and bolckout.
SYΔ-TRANSMIT-000016 -WCC-WSP-F1-DR-000-03-21363_C04 CONSULTANT. SUBJECT FOR APPROVAL.
- Please indicate
B.O.S. the opening
BOTTOM for which services.
OF SLEEVE -WCC-M001-ST-SD-000-05-21003_1 -WCC-WSP-F2-DR-000-03-22363_C04
- The B.O.W.O.
exact conduit size to
BOTTOM OF WALL
be confirmed by the FS NSC to perform the
-WCC-M001-ST-SD-000-05-21004_1calculation of AFA system.
1 31/05/2022 ISSUED FOR APPROVAL
- Please ensureOPENING
the size and setting out of the proposed blockout allow sufficient installation space and correct elevation for MEPF installation later.
Rev. Date (D/M/Y) Description
150X150mm BLOCKOUT FOR
100MM DIA. G.I. PIPE SLEEVE 80MM DIA. BFS-SPR
BF FOR Ø80mm BFS-SPR
@+4750mm B.O.S. 50mm DIA. G.I. PIPE SLEEVE
@ +4675mm B.O.W.O.

300X300mm BLOCKOUT FOR


FOR 40MM DIA. BFS-SPR 150MM BFS RISER AND FDAS
#20 N. DOMINGO STREET, BRGY. VALENCIA, QUEZON CITY

100 Adjust the blockout to TEL/FAX : (+632) 655-1111 LOCAL 813

100MM DIA. G.I. PIPE SLEEVE @ +4726mm B.O.S.


23/06/2022
TEL : (+632) 655-9164
CONDUIT @ +4600mm B.O.W.O.
FOR Ø50mm BFS-SPR cater for a DN100 General Contractor
@+4750mm B.O.S. SPR. pipe. Aedas (Macau) Lda
Avenida Xian Xing Hai No.105 Centro Golden
Dragon 7 andar D, Nape, Macao
T +853 2875 5530
should be a blockout F +853 2875 5531
macau@aedas.com
for a DN50 FS pipe. Please remove 6th Floor, Paseo Center,
blockout #2. 8757 Paseo de Roxas Avenue, Salcedo
Village, Makati City, 1227, Philippines
50MM DIA. G.I. PIPE SLEEVE T +632 867 8615
FOR Ø40mm BFS-SPR F +632 840 4384
information@casasarchitects.com
@+4775mm B.O.S.
185 Architect
138171 321 650
675 CONSULTING,
FIRETECH,
ENGINEERS
FIRE PROTECTION
CONSULTANTS
INC.
SYSTEMS

BASEMENT-1, MAKATI CINEMA SQUARE PASONG TAMO STREET, MAKATI CITY


TEL NOS. 8811-1777 8811-1778 E-MAIL ADDRESS nbf@globelines.com.ph FAX. NO. 8844-3667

75
BSB-38 (1200x1500mm)
5 B.O.B.+31.800 3 TUV Rheinland
Precisely Right.
R TUV Rheinland Philippines, Inc.
G/F La Fuerza Bldg. 1, Don Chino Roces Ave.

300
1231 Makati City, Philippines

MEP Engineer
6 4
2

150
300
150 1

(CHB DROP/HANGER WALL) Structural Engineer

1902

1851

1776
Please move down
blockout #1 & 3 to below
Project Manager
landing high level.
SUNTRUST HOME
Please confirm if opening for conduit can be cored DEVELOPERS, INC.
26th Floor, Alliance Global Tower, 36th St Cor, 11th Av.,
on site, otherwise please provide pipe sleeve for Uptown Bonifacio, Fort Bonifacio, Taguig City 1634
minimum DN50 FDAS conduit as the exact conduit
4775
4750

OWNER/DEVELOPER
4726

4675

4600
size to be confirmed by the FS NSC to perform the Project Title
calculation of AFA system. (Typical for all FDAS
conduit)
Westside City Phase 1 - Site B
Bagong Nayong Pilipino Entertainment
City, Paranaque City
Status
ISSUED FOR APPROVAL
Discipline
MULTI-DISCIPLINARY

3D VIEW Drawing Title

2 L03 T2-B3a CONCRETE BUILDERS


WORK WALL (SECTION & 3D VIEW)
06
SHEET 03 OF 10
31/05/2022 01:00:00 pm

Drawn by Checked by Approved by


RRF JC/AML GSC
Scale Issue Date Rev.
AS INDICATED MAY 31, 2022 1
SECTION A Drawing Number
1 Scale: 1:40mm WCC-M001-MD-SD-000-03-04048
GENERAL NOTE: DO NOT SCALE FROM DRAWING. USE MARKED DIMENSIONS. TO BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANT'S DRAWINGS. THE CLIENT TO BE IMMEDIATELY NOTIFIED OF ANY DISCREPANCIES. COPYRIGHT ON THE DRAWING RETAINED BY SUNTRUST HOME DEVELOPERS INC.