You are on page 1of 12

DocuSign Envelope ID: F2A5F820-C328-4034-9095-87F8416E1704

NOTES:

INDEX
REVISION
DRAWING NUMBER DESCRIPTION
00A 00B
T83-P-CBL-CA-256956-FS1 DRAWING INDEX SHEET 02-24-21 11-17-21

T83-P-CBL-CA-256956-001 NGL FRACTIONATION TRAIN 1 02-24-21 11-17-21

T83-P-CBL-CA-256956-002 NGL FRACTIONATION TRAIN 1 02-24-21 11-17-21

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
T83-P-CBL-CA-256956-003 NGL FRACTIONATION TRAIN 1 02-24-21 11-17-21
REFERENCE DRAWINGS

T83-P-CBL-CA-256956-004 NGL FRACTIONATION TRAIN 1 02-24-21 11-17-21

T83-P-CBL-CA-256956-005 NGL FRACTIONATION TRAIN 1 02-24-21 11-17-21

T83-P-CBL-CA-256956-006 NGL FRACTIONATION TRAIN 1 02-24-21 11-17-21

T83-P-CBL-CA-256956-007 NGL FRACTIONATION TRAIN 1 02-24-21 11-17-21

T83-P-CBL-CA-256956-008 NGL FRACTIONATION TRAIN 1 02-24-21 11-17-21

T83-P-CBL-CA-256956-009 NGL FRACTIONATION TRAIN 1 02-24-21 11-17-21

T83-P-CBL-CA-256956-010 NGL FRACTIONATION TRAIN 1 02-24-21 11-17-21

T83-P-CBL-CA-256956-011 NGL FRACTIONATION TRAIN 1 02-24-21 11-17-21

KEY PLAN

00B 11/17/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU

00A 02/24/21 ISSUED FOR DESIGN ACA MMT MSU

REV DATE DESCRIPTION BY CHK APP

SCALE:

REVISION VALIDATION

THIS REVISION NO.00B IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09003-0004-000
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

REV.NO. DATE REVISION DESCRIPTION

00B 11/17/21
ISSUED FOR CONSTRUCTION WITH HOLDS
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE

ELECTRICAL PLAN/LAYOUT/DETAIL CBL


CABLE TRENCH LAYOUT
NGL FRACTIONATION TRAIN 1

TANAJIB SAUDI ARABIA


PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

T83 P CA-256956 FS1 00B

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: F2A5F820-C328-4034-9095-87F8416E1704

NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22.
2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
3.- ALL COORDINATES ARE IN METERS.
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
M AKKA H
E 10123.310 5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
N 11280.393 PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
T83-TR-5110 RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
E 10145.310
W-400 D-1200 N 11280.393 6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
E 10121.421 DRAWING T80-S-UTI-CB-790879
B.O.T EL+98.800 T83-TR-5120
PREVAILING N 11280.393
E 10148.081 W-400 D-1200
WIND T83-TR-5110 LEGEND
T83-DB-525 T83-TR-5110 N 11286.185
W-400 D-1000 B.O.T EL+98.800
W-400 D-1000 E 10099.404
W-580 D-360
N 11287.800 B.O.T EL+99.000
BOT EL +98.800 B.O.T EL+99.000 T83-TR-5120 N.10155046 NORTH
E 10116.048 E 10148.081 W-400 D-1000 TRENCH COORDINATES
W- 2 D-1 E. 5994416 EAST
FOR CONT. SEE DWG. N 11289.700 N 11280.393
150 B.O.T EL+99.000
T83-DC-52002 T83-DC-52001 T83-P-CBL-CA-256958-004 E 10102.695 E 10151.596
N 11289.700 MATCHLINE N 11295.502 N 11289.700 CABLE TRENCH/DUCT BANK NO.

XXX-XX-XXX TYPE OF RACEWAY (SEE BELOW)


W-1000 D-400 WIDTH AND DEPTH
B.O.D. EL.+98.500 ELEVATION
B B * W-6 * D-2 *W= NUMBER OF CONDUIT / D= NUMBER OF LAYER
T83-TR-5120 *150 *CONDUIT DIAMETER

Section A-A E 10096.710


N 11288.500
W-400 D-1000
B.O.T EL+99.000
* ONLY FOR DUCT BANK

(SCALE: 1:25 mm) T83-TR-5100 T83-DB-530 E 10171.195


W-400 D-1200 W-580 D-360 N 11286.740 TYPE OF RACEWAY
B.O.T EL+98.800 BOT EL +98.800 E 10168.235
W- 2 D-1 N 11289.700 XXX-XX-XXXX
E 10096.710
N 11286.035 150 T83-DB-535 SEQUIENTIAL NUMBER
T83-TR-5100 W-580 D-360 TYPE OF RACEWAY:
W-400 D-1000 C D BOT EL +98.800 TR - (CABLE TRENCH)
B.O.T EL+99.000 W- 2 D-1 DB - (DUCT BANK)
150 SU - (STUB-UP)
E 10086.800 SC - (CONDUIT WITHIN STUB-UP)
N 11276.125 C D DC - (CONDUIT WITHIN DUCT BANK)
AC - (ABOVE GROUND CONDUIT)
T83-DC-52502 T83-DC-52501 E 10172.738 UC - (UNDER GROUND CONDUIT)
N 11280.393
PLANT NUMBER

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
T83-TR-5120
W-400 D-1200
B.O.T EL+98.800
ELECTRICAL ELECTRICAL
E 10171.195 CABLE TRENCH DUCT BANK / STUB-UP
N 11280.393 ELECTRICAL

Section B-B CONDUIT

REFERENCE DRAWINGS
(SCALE: 1:25 mm)
POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250

FOR CONT. SEE DWG. T83-P-CBL-CA-256956-006


ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
E 10106.650 CABLE TRAY LAYOUT - NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256937
N 11258.525 CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
T83-TR-5101 CABLE TRENCH LAYOUT - GENERAL BUILDINGS - NGL T83-P-CBL-CA-256958
W-400 D-1000 FRACTIONATION
B.O.T EL+99.000
STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256927
T83-DC-53002 T83-DC-53001

MATCHLINE E 10174.045
GENERAL AREAS
TRENCH FOR GENERAL DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879
AREA LIGHTING
AREA

Section C-C
(SCALE: 1:25 mm)

E 10086.800
N 11244.003
E 10086.350
N 11243.336 THIS DRAWING
E 10086.350
N 11238.278
E 10086.800
T83-DC-53502 T83-DC-53501 N 11237.305
MATCHLINE E 10079.993

Section D-D
(SCALE: 1:25 mm)

KEY PLAN

E 10086.800
N 11220.791 00B 11/17/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU

E 10097.493 00A 02/24/21 ISSUED FOR DESIGN ACA MMT MSU


N 11211.999
T83-TR-5100
W-400 D-1000
B.O.T EL+99.000 E 10094.965 REV DATE DESCRIPTION BY CHK APP
N 11212.627
E 10094.965
N 11211.051
TRENCH FOR 0 5.0 10.0 15.0 20.0

T83-TR-5100 STREET LIGHTING METERS


W-400 D-1200
B.O.T EL+98.800 1 : 200M
SCALE:
T83-DB-520 A A
W-580 D-360
BOT EL +98.800 REVISION VALIDATION

W- 2 D-1 THIS REVISION NO.00B IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
150 MATCHLINE N 11205.000 REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

E 10099.592
N 11209.900
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-002 10-09003-0004-000
T83-TR-5090 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
W-400 D-1000 E 10099.928 (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
N 11209.900 ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
B.O.T EL+99.000
PLAN VIEW
REV.NO. DATE REVISION DESCRIPTION
(SCALE: 1:200 mm) 00B 11/17/21
ISSUED FOR CONSTRUCTION WITH HOLDS
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE

ELECTRICAL PLAN/LAYOUT/DETAIL CBL


CABLE TRENCH LAYOUT
NGL FRACTIONATION TRAIN 1

GENERAL REVISION 00B TANAJIB


PLANT NO. INDEX DRAWING NUMBER
SAUDI ARABIA
SHT. NO. REV. NO.

T83 P CA-256956 001 00B

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: F2A5F820-C328-4034-9095-87F8416E1704

NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22.
2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
E 10104.799 VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
N 11193.306 3.- ALL COORDINATES ARE IN METERS.
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
M AKKA H T83-TR-5081
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
W-400 D-1000
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
T83-DB-520 B.O.T EL+99.000
E 10101.529 RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
W-580 D-360 N 11198.970 6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
BOT EL +98.800 DRAWING T80-S-UTI-CB-790879
W- 2 D-1
E 10104.799
N 11193.089
MATCHLINE N 11205.002
PREVAILING
WIND 150 FOR CONT. SEE DWG. T83-P-CBL-CA-256956-001 LEGEND

E 10094.965
A A N.10155046 NORTH
TRENCH COORDINATES
E. 5994416 EAST
N 11201.050
T83-TR-5080
E 10088.483
CABLE TRENCH/DUCT BANK NO.
W-400 D-1200
N 11198.970
B.O.T EL+98.800 XXX-XX-XXX TYPE OF RACEWAY (SEE BELOW)
E 10086.800 W-1000 D-400 WIDTH AND DEPTH
N 11197.286
B.O.D. EL.+98.500 ELEVATION
T83-TR-5080 * W-6 * D-2 *W= NUMBER OF CONDUIT / D= NUMBER OF LAYER
W-400 D-1000 *150 *CONDUIT DIAMETER
B.O.T EL+99.000 * ONLY FOR DUCT BANK
E 10086.800
N 11193.325
E 10086.250 TYPE OF RACEWAY
N 11191.825
TRENCH FOR XXX-XX-XXXX
E 10086.250 STREET LIGHTING
N 11190.175 SEQUIENTIAL NUMBER
E 10086.800 TYPE OF RACEWAY:
N 11188.675
TR - (CABLE TRENCH)
E 10094.965 DB - (DUCT BANK)
N 11198.970 SU - (STUB-UP)

FOR CONT. SEE DWG. T83-P-CBL-CA-256956-007


SC - (CONDUIT WITHIN STUB-UP)
DC - (CONDUIT WITHIN DUCT BANK)
AC - (ABOVE GROUND CONDUIT)
UC - (UNDER GROUND CONDUIT)
PLANT NUMBER

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
MATCHLINE E 10079.993

MATCHLINE E 10174.045
ELECTRICAL ELECTRICAL
CABLE TRENCH DUCT BANK / STUB-UP
ELECTRICAL
CONDUIT

REFERENCE DRAWINGS
POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
CABLE TRAY LAYOUT - NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256937
CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256927
TRENCH FOR GENERAL GENERAL AREAS
AREA LIGHTING
DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879
AREA

T83-TR-5082
W-400 D-1000
B.O.T EL+99.000
E 10104.100
N 11144.850 E 10107.350
N 11164.511
TRENCH FOR
T83-TR-5083 STREET LIGHTING
W-400 D-1000 T83-TR-5083
B.O.T EL+99.000 W-400 D-1000
B.O.T EL+99.000
E 10086.800
N 11148.490
E 10086.350 THIS DRAWING
N 11147.547
E 10086.350
N 11143.279
E 10095.015
N 11135.065
T83-TR-5080
W-400 D-1000

T83-P-CBL-CA-256956-008
B.O.T EL+99.000

MATCHLINE E 10174.045
E 10095.015

FOR CONT. SEE DWG.


N 11133.251
T83-TR-5080
W-400 D-1200
B.O.T EL+98.800
B B
T83-DB-515
W-580 D-360
BOT EL +98.800 MATCHLINE N 11129.000
W- 2 D-1
150
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-003 KEY PLAN
E 10101.076
N 11134.249
T83-TR-5083 00B 11/17/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
W-400 D-1000 00A 02/24/21 ISSUED FOR DESIGN ACA MMT MSU
B.O.T EL+99.000
E 10104.100
PLAN VIEW
N 11139.487
(SCALE: 1:200 mm) REV DATE DESCRIPTION BY CHK APP

0 5.0 10.0 15.0 20.0

METERS

SCALE:
1 : 200M

REVISION VALIDATION

T83-DC-52002 T83-DC-52001 T83-DC-51502 T83-DC-51501 THIS REVISION NO.00B IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09003-0004-000
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

Section A-A Section B-B REV.NO. DATE REVISION DESCRIPTION

(SCALE: 1:25 mm) (SCALE: 1:25 mm)


00B 11/17/21
ISSUED FOR CONSTRUCTION WITH HOLDS
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE

ELECTRICAL PLAN/LAYOUT/DETAIL CBL


CABLE TRENCH LAYOUT
NGL FRACTIONATION TRAIN 1

GENERAL REVISION 00B TANAJIB


PLANT NO. INDEX DRAWING NUMBER
SAUDI ARABIA
SHT. NO. REV. NO.

T83 P CA-256956 002 00B

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: F2A5F820-C328-4034-9095-87F8416E1704

NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22.
2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
3.- ALL COORDINATES ARE IN METERS.
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
M AKKA H T83-TR-5071
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
T83-DB-515 W-400 D-1000 PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
W-580 D-360 B.O.T EL+99.000 RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
BOT EL +98.800 E 10100.300 MATCHLINE N 11129.002 6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
W- 2 D-1 N 11123.750 DRAWING T80-S-UTI-CB-790879
150 FOR CONT. SEE DWG. T83-P-CBL-CA-256956-002
PREVAILING
WIND
LEGEND

E 10095.015
N 11124.751 B B N.10155046 NORTH
TRENCH COORDINATES
E. 5994416 EAST
T83-TR-5070
W-400 D-1200 T83-TR-5070 TRENCH FOR
STREET LIGHTING CABLE TRENCH/DUCT BANK NO.
B.O.T EL+98.800 W-400 D-1000
B.O.T EL+99.000 XXX-XX-XXX TYPE OF RACEWAY (SEE BELOW)
E 10086.800 W-1000 D-400 WIDTH AND DEPTH
N 11117.617 B.O.D. EL.+98.500 ELEVATION
* W-6 * D-2 *W= NUMBER OF CONDUIT / D= NUMBER OF LAYER
*150 *CONDUIT DIAMETER
E 10095.015
N 11122.360 * ONLY FOR DUCT BANK

E 10095.015
N 11108.350
T83-TR-5070 TYPE OF RACEWAY
W-400 D-1000 E 10086.800
N 11113.092 XXX-XX-XXXX
B.O.T EL+99.000

FOR CONT. SEE DWG. T83-P-CBL-CA-256956-008


SEQUIENTIAL NUMBER
T83-TR-5072
W-400 D-1000 TYPE OF RACEWAY:
B.O.T EL+99.000 TR - (CABLE TRENCH)
DB - (DUCT BANK)
E 10086.800 SU - (STUB-UP)
N 11108.050 SC - (CONDUIT WITHIN STUB-UP)
DC - (CONDUIT WITHIN DUCT BANK)
E 10095.015 AC - (ABOVE GROUND CONDUIT)

MATCHLINE E 10174.045
T83-DB-755 N 11104.075 UC - (UNDER GROUND CONDUIT)
W-580 D-360 T83-TR-5070 PLANT NUMBER

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
BOT EL +98.800 W-400 D-1200
W- 2 D-1 B.O.T EL+98.800
150 ELECTRICAL ELECTRICAL
CABLE TRENCH DUCT BANK / STUB-UP
E 10095.015 C C ELECTRICAL
CONDUIT
N 11095.575
T83-TR-5060 REFERENCE DRAWINGS
W-400 D-1200
POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
B.O.T EL+98.800
POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
T83-TR-5060
CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
W-400 D-1000
B.O.T EL+99.000 ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
CABLE TRAY LAYOUT - NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256937
E 10086.800
N 11085.893 CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256927
E 10095.015 GENERAL AREAS
N 11090.636
DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879
AREA
MATCHLINE E 10079.993

T83-P-CBL-CA-256956-009
THIS DRAWING

MATCHLINE E 10174.045
E 10086.800

FOR CONT. SEE DWG.


N 11067.802
E 10097.542
N 11058.951
T83-TR-5060
W-400 D-1000 E 10095.015
N 11059.587 TRENCH FOR
B.O.T EL+99.000
E 10095.015 STREET LIGHTING
N 11058.001
T83-TR-5060
W-400 D-1200
B.O.T EL+98.800

T83-DB-510 A A
W-580 D-360
BOT EL +98.800
W- 2 D-1 MATCHLINE N 11053.113
150 FOR CONT. SEE DWG. T83-P-CBL-CA-256956-004
E 10099.642
N 11056.850 KEY PLAN
T83-TR-5050
W-400 D-1000 E 10099.978
N 11056.850 00B 11/17/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
B.O.T EL+99.000
00A 02/24/21 ISSUED FOR DESIGN ACA MMT MSU

REV DATE DESCRIPTION BY CHK APP

PLAN VIEW
0 5.0 10.0 15.0 20.0
(SCALE: 1:200 mm)
METERS

SCALE:
1 : 200M

REVISION VALIDATION

THIS REVISION NO.00B IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09003-0004-000
T83-DC-51002 T83-DC-51001 T83-DC-51502 T83-DC-51501 T83-DC-75502 T83-DC-75501
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

REV.NO. DATE REVISION DESCRIPTION

00B 11/17/21
ISSUED FOR CONSTRUCTION WITH HOLDS
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


Section A-A Section B-B Section C-C ELECTRICAL PLAN/LAYOUT/DETAIL
DRAWING TYPE

(SCALE: 1:25 mm) CBL


(SCALE: 1:25 mm) (SCALE: 1:25 mm)
CABLE TRENCH LAYOUT
NGL FRACTIONATION TRAIN 1

GENERAL REVISION 00B TANAJIB


PLANT NO. INDEX DRAWING NUMBER
SAUDI ARABIA
SHT. NO. REV. NO.

T83 P CA-256956 003 00B

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: F2A5F820-C328-4034-9095-87F8416E1704

NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22.
2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
3.- ALL COORDINATES ARE IN METERS.
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
M AKKA H
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
DRAWING T80-S-UTI-CB-790879
PREVAILING E 10104.499
WIND N 11041.641
E 10104.499 LEGEND
T83-DB-510 N 11041.858
W-580 D-360 T83-TR-5041
BOT EL +98.800 E 10101.530 N.10155046 NORTH
W-400 D-1000 TRENCH COORDINATES
N 11047.000 E. 5994416
W- 2 D-1 B.O.T EL+99.000 MATCHLINE N 11053.115 EAST
150
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-003 CABLE TRENCH/DUCT BANK NO.

XXX-XX-XXX TYPE OF RACEWAY (SEE BELOW)


W-1000 D-400 WIDTH AND DEPTH
B B B.O.D. EL.+98.500 ELEVATION

FOR CONT. SEE DWG. T83-P-CBL-CA-256956-009


E 10095.015 *W= NUMBER OF CONDUIT / D= NUMBER OF LAYER
* W-6 * D-2
N 11048.000
*150 *CONDUIT DIAMETER
T83-TR-5040 * ONLY FOR DUCT BANK
W-400 D-1200
B.O.T EL+98.800

T83-TR-5040 TYPE OF RACEWAY


W-400 D-1000 XXX-XX-XXXX

MATCHLINE E 10174.045
B.O.T EL+99.000
SEQUIENTIAL NUMBER
E 10086.800
N 11036.537 TYPE OF RACEWAY:
TR - (CABLE TRENCH)
DB - (DUCT BANK)
SU - (STUB-UP)
SC - (CONDUIT WITHIN STUB-UP)
T83-DC-51002 T83-DC-51001 E 10095.015 DC - (CONDUIT WITHIN DUCT BANK)
N 11046.217 AC - (ABOVE GROUND CONDUIT)
UC - (UNDER GROUND CONDUIT)
TRENCH FOR PLANT NUMBER

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
STREET LIGHTING

ELECTRICAL ELECTRICAL
Section B-B CABLE TRENCH
ELECTRICAL
DUCT BANK / STUB-UP

(SCALE: 1:25 mm) CONDUIT

REFERENCE DRAWINGS
POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
CABLE TRAY LAYOUT - NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256937
CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
T83-TR-5040
STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256927
W-400 D-1000
GENERAL AREAS
B.O.T EL+99.000
DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879
AREA

FOR CONT. SEE DWG. T83-P-CBL-CA-256956-010


T83-DC-50502 T83-DC-50501

Section A-A

MATCHLINE E 10174.045
E 10086.800
N 11000.034 THIS DRAWING
(SCALE: 1:25 mm) E 10086.350
N 10998.454
E 10086.350
N 10993.518
E 10086.800
N 10992.373
MATCHLINE E 10079.993

KEY PLAN

00B 11/17/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU

00A 02/24/21 ISSUED FOR DESIGN ACA MMT MSU


TRENCH FOR
STREET LIGHTING
E 10086.800
N 10973.457 REV DATE DESCRIPTION BY CHK APP
E 10095.015
N 10965.242
T83-TR-5040 0 5.0 10.0 15.0 20.0
W-400 D-1000
B.O.T EL+99.000 METERS

E 10095.015 1 : 200M
SCALE:
N 10964.000

T83-P-CBL-CA-256956-011
T83-TR-5040

MATCHLINE E 10174.045
W-400 D-1200 REVISION VALIDATION

FOR CONT. SEE DWG.


B.O.T EL+98.800 THIS REVISION NO.00B IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

T83-DB-505
A A REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

W-580 D-360 10-09003-0004-000


BOT EL +98.800
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
W- 2 D-1 MATCHLINE N 10959.000 (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

150 FOR CONT. SEE DWG. T83-P-CBL-CA-256956-005 ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

E 10101.437
N 10965.129
T83-TR-5042 REV.NO. DATE REVISION DESCRIPTION

W-400 D-1000 E 10103.046 00B 11/17/21


ISSUED FOR CONSTRUCTION WITH HOLDS
N 10967.915
B.O.T EL+98.940 E 10103.046
JOB ORDER/EWO NO.
N 10969.350 THIS REVISION IS NOT TO BE USED FOR

PLAN VIEW 10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED

(SCALE: 1:200 mm)


SAUDI ARABIAN OIL COMPANY
DRAWING TYPE

ELECTRICAL PLAN/LAYOUT/DETAIL CBL


CABLE TRENCH LAYOUT
NGL FRACTIONATION TRAIN 1

GENERAL REVISION 00B TANAJIB


PLANT NO. INDEX DRAWING NUMBER
SAUDI ARABIA
SHT. NO. REV. NO.

T83 P CA-256956 004 00B

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: F2A5F820-C328-4034-9095-87F8416E1704

NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22.
2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
3.- ALL COORDINATES ARE IN METERS.
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
M AKKA H
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
DRAWING T80-S-UTI-CB-790879
PREVAILING
WIND
LEGEND

T83-DB-505 N.10155046 NORTH


TRENCH COORDINATES
W-580 D-360 E. 5994416 EAST
BOT EL +98.800
E 10099.600
W- 2 D-1 N 10953.885 CABLE TRENCH/DUCT BANK NO.
150 MATCHLINE N 10959.002
XXX-XX-XXX TYPE OF RACEWAY (SEE BELOW)
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-004 W-1000 D-400 WIDTH AND DEPTH
B.O.D. EL.+98.500 ELEVATION
* W-6 * D-2 *W= NUMBER OF CONDUIT / D= NUMBER OF LAYER
*150 *CONDUIT DIAMETER
E 10095.015 A A * ONLY FOR DUCT BANK
N 10954.000
T83-TR-5020 TRENCH FOR
W-400 D-1200 STREET LIGHTING TYPE OF RACEWAY
B.O.T EL+98.800 XXX-XX-XXXX
E 10095.015 SEQUIENTIAL NUMBER
N 10951.850 TYPE OF RACEWAY:
T83-TR-5030
E 10099.600 TR - (CABLE TRENCH)
W-400 D-1000
T83-DC-50502 T83-DC-50501 N 10953.075 DB - (DUCT BANK)
B.O.T EL+99.000 SU - (STUB-UP)
E 10086.350 SC - (CONDUIT WITHIN STUB-UP)
N 10945.490 DC - (CONDUIT WITHIN DUCT BANK)
AC - (ABOVE GROUND CONDUIT)
UC - (UNDER GROUND CONDUIT)
E 10086.350 PLANT NUMBER

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
N 10940.194

Section A-A E 10086.800


N 10939.412 ELECTRICAL ELECTRICAL
(SCALE: 1:25 mm) CABLE TRENCH DUCT BANK / STUB-UP
ELECTRICAL
CONDUIT

REFERENCE DRAWINGS
POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
E 10099.530
POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
N 10919.092 CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
T83-TR-5010
E 10097.980 ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
W-400 D-1000
N 10920.641 CABLE TRAY LAYOUT - NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256937

FOR CONT. SEE DWG. T83-P-CBL-CA-256956-011


B.O.T EL+99.000
E 10092.929 CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
T83-DC-50002 T83-DC-50001 N 10920.875
STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256927
E 10086.800
N 10927.005
GENERAL AREAS
T83-TR-5020 DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879
W-400 D-1000 AREA
B.O.T EL+99.000

MATCHLINE E 10174.045
Section B-B E 10092.929
N 10918.217
(SCALE: 1:25 mm) T83-TR-5020
T83-DB-500 W-400 D-1200
W-580 D-360 B.O.T EL+98.800
BOT EL +98.800 E 10099.530
W- 2 D-1 N 10918.756 TRENCH FOR
150 STREET LIGHTING

E 10092.929 B B
N 10908.216
T83-TR-5000
W-400 D-1200 E 10092.929 THIS DRAWING
B.O.T EL+98.800 N 10906.756

T83-TR-5000
W-400 D-1000
T83-TR-5001
B.O.T EL+99.000
W-400 D-1000 CONDUIT FOR
B.O.T EL+99.000 STREET LIGHTING
E 10086.350
N 10900.256
E 10099.389
N 10906.872
E 10099.389
N 10906.062
E 10099.589
N 10897.500
E 10086.350
N 10894.803
E 10086.800
N 10893.909
T83-UC-0040|150 mm
E 10104.449
N 10897.500
KEY PLAN
MATCHLINE E 10079.993

00B 11/17/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU

00A 02/24/21 ISSUED FOR DESIGN ACA MMT MSU

E 10122.572 E 10126.825
N 10876.336 N 10876.336
E 10121.139 E 10128.291 REV DATE DESCRIPTION BY CHK APP
N 10876.800 N 10876.800

0 5.0 10.0 15.0 20.0

T83-TR-5000
METERS
W-400 D-1000
B.O.T EL+99.000 1 : 200M
SCALE:

E 10086.800 REVISION VALIDATION


N 10884.180
THIS REVISION NO.00B IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
E 10094.180 REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
N 10876.800 MATCHLINE N 10870.000
10-09003-0004-000
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

PLAN VIEW REV.NO.

00B
DATE

11/17/21
REVISION DESCRIPTION

ISSUED FOR CONSTRUCTION WITH HOLDS


(SCALE: 1:200 mm) JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE

ELECTRICAL PLAN/LAYOUT/DETAIL CBL


CABLE TRENCH LAYOUT
NGL FRACTIONATION TRAIN 1

GENERAL REVISION 00B TANAJIB


PLANT NO. INDEX DRAWING NUMBER
SAUDI ARABIA
SHT. NO. REV. NO.

T83 P CA-256956 005 00B

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: F2A5F820-C328-4034-9095-87F8416E1704

NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22.
2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
3.- ALL COORDINATES ARE IN METERS.
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
M AKKA H
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
DRAWING T80-S-UTI-CB-790879
PREVAILING
WIND
LEGEND

N.10155046 NORTH
TRENCH COORDINATES
E. 5994416 EAST

MATCHLINE N 11295.502 CABLE TRENCH/DUCT BANK NO.


FOR CONT. SEE DWG. T83-P-CBL-CA-256958-007 XXX-XX-XXX TYPE OF RACEWAY (SEE BELOW)
W-1000 D-400 WIDTH AND DEPTH
B.O.D. EL.+98.500 ELEVATION
* W-6 * D-2 *W= NUMBER OF CONDUIT / D= NUMBER OF LAYER
*150 *CONDUIT DIAMETER
E 10187.529
N 11289.700 * ONLY FOR DUCT BANK
T83-TR-5130
W-400 D-1000 E 10227.650
B.O.T EL+99.000 E 10186.048 N 11289.700 TYPE OF RACEWAY
N 11288.219
E 10184.738 XXX-XX-XXXX
N 11280.393 E 10229.477
SEQUIENTIAL NUMBER
T83-TR-5130 N 11277.107
T83-TR-5130 TYPE OF RACEWAY:
W-400 D-1200 T83-DB-535 E 10238.185 W-400 D-1000 TR - (CABLE TRENCH)
B.O.T EL+98.800 W-580 D-360 N 11274.641
BOT EL +98.800
A B.O.T EL+99.000 DB - (DUCT BANK)
E 10245.000 SU - (STUB-UP)
W- 2 D-1 N 11276.575 SC - (CONDUIT WITHIN STUB-UP)
150 T83-DB-730 DC - (CONDUIT WITHIN DUCT BANK)
T83-TR-5135
T83-DC-53502 T83-DC-53501 W-580 D-360 AC - (ABOVE GROUND CONDUIT)
W-400 D-1200 UC - (UNDER GROUND CONDUIT)
D B.O.T EL+98.800
BOT EL +98.800
W- 2 D-1 PLANT NUMBER
A

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
FOR CONT. SEE DWG.
150
T83-P-CBL-CA-256957-001
E 10186.048
D
ELECTRICAL ELECTRICAL
N 11280.393 E 10241.534 CABLE TRENCH DUCT BANK / STUB-UP
N 11276.575
Section A-A E 10238.185
T83-TR-5135
W-400 D-1000
ELECTRICAL
CONDUIT
(SCALE: 1:25 mm) N 11273.299
B.O.T EL+99.000 REFERENCE DRAWINGS
T83-TR-5135
B B POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
W-400 D-1200
B.O.T EL+98.800 POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
T83-DB-540 CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
E 10233.893
W-580 D-360 ELECTRICAL CABLE SCHEDULE - SUBSTATION 017
N 11274.557 T83-P-CCS-CD-256969
BOT EL +98.800
E 10227.650 CABLE TRAY LAYOUT - NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256937

FOR CONT. SEE DWG. T83-P-CBL-CA-256956-001


N 11277.107 W- 2 D-1
150 CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
E 10233.706 CABLE TRENCH LAYOUT - GENERAL BUILDINGS - NGL T83-P-CBL-CA-256958
N 11248.213 FRACTIONATION
E 10238.185
T83-DC-54002 T83-DC-54001 N 11252.299 STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256927
T83-TR-5140 GENERAL AREAS
T83-TR-5140 W-400 D-1200
MATCHLINE E 10174.043

DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879


W-400 D-1000 B.O.T EL+98.800
AREA
B.O.T EL+99.000
E 10238.185
N 11250.799

Section B-B E 10245.200


N 11246.749
T83-TR-5141
W-400 D-1000
(SCALE: 1:25 mm) B.O.T EL+99.000
E 10233.706
N 11247.746

MATCHLINE E 10250.995
THIS DRAWING
TRENCH FOR GENERAL
AREA LIGHTING
T83-DC-54502 T83-DC-54501

Section C-C
(SCALE: 1:25 mm)

E 10233.606
N 11221.000
T83-TR-5142
E 10239.138 W-400 D-1000
N 11221.085
B.O.T EL+99.000
KEY PLAN
TRENCH FOR E 10245.200
STREET LIGHTING N 11224.585
00B 11/17/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
T83-TR-5140
00A 02/24/21 ISSUED FOR DESIGN ACA MMT MSU
T83-DC-73002 T83-DC-73001 W-400 D-1000
B.O.T EL+99.000
E 10239.138
N 11215.293 REV DATE DESCRIPTION BY CHK APP
T83-TR-5140
W-400 D-1200
B.O.T EL+98.800 0 5.0 10.0 15.0 20.0

Section D-D METERS

(SCALE: 1:25 mm)


SCALE:
1 : 200M

C C REVISION VALIDATION
T83-DB-545
THIS REVISION NO.00B IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
W-580 D-360
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
BOT EL +98.800
MATCHLINE N 11205.000 W- 2 D-1 10-09003-0004-000
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-007 150 DESIGN CERTIFICATION
(DESIGN AGENCY)
REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO)
OTHER

ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

PLAN VIEW REV.NO.

00B
DATE

11/17/21
REVISION DESCRIPTION

ISSUED FOR CONSTRUCTION WITH HOLDS


(SCALE: 1:200 mm) JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE

ELECTRICAL PLAN/LAYOUT/DETAIL CBL


CABLE TRENCH LAYOUT
NGL FRACTIONATION TRAIN 1

GENERAL REVISION 00B TANAJIB


PLANT NO. INDEX DRAWING NUMBER
SAUDI ARABIA
SHT. NO. REV. NO.

T83 P CA-256956 006 00B

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: F2A5F820-C328-4034-9095-87F8416E1704

NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22.
2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
3.- ALL COORDINATES ARE IN METERS.
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
M AKKA H
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
E 10224.670
N 11193.049 6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
DRAWING T80-S-UTI-CB-790879
E 10227.178
PREVAILING N 11197.394 T83-DB-545
WIND
T83-TR-5160 W-580 D-360 LEGEND
W-400 D-1000 BOT EL +98.800
MATCHLINE N 11205.002 B.O.T EL+99.000 W- 2 D-1 N.10155046 NORTH
TRENCH COORDINATES
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-006 150 E. 5994416 EAST

CABLE TRENCH/DUCT BANK NO.

B B XXX-XX-XXX TYPE OF RACEWAY (SEE BELOW)


W-1000 D-400 WIDTH AND DEPTH
E 10239.138 B.O.D. EL.+98.500 ELEVATION
N 11199.293 * W-6 *W= NUMBER OF CONDUIT / D= NUMBER OF LAYER
* D-2
T83-TR-5160 *150 *CONDUIT DIAMETER
W-400 D-1200 * ONLY FOR DUCT BANK
B.O.T EL+98.800
E 10239.138
N 11197.394 TYPE OF RACEWAY
XXX-XX-XXXX
SEQUIENTIAL NUMBER
TYPE OF RACEWAY:
TR - (CABLE TRENCH)
DB - (DUCT BANK)
SU - (STUB-UP)
E 10224.670
SC - (CONDUIT WITHIN STUB-UP)
N 11187.582
DC - (CONDUIT WITHIN DUCT BANK)
E 10225.009 AC - (ABOVE GROUND CONDUIT)

FOR CONT. SEE DWG. T83-P-CBL-CA-256956-002


N 11185.967 UC - (UNDER GROUND CONDUIT)
PLANT NUMBER

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
ELECTRICAL ELECTRICAL
CABLE TRENCH DUCT BANK / STUB-UP
ELECTRICAL
MATCHLINE E 10174.043

MATCHLINE E 10250.995
CONDUIT

REFERENCE DRAWINGS
POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
CABLE TRAY LAYOUT - NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256937
CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256927
GENERAL AREAS
DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879
AREA

E 10225.009
N 11154.793
T83-TR-5160
W-400 D-1000
B.O.T EL+99.000
E 10231.686
N 11148.116
T83-TR-5160
W-400 D-1000
B.O.T EL+99.000 THIS DRAWING
E 10239.138
N 11148.116
T83-TR-5160
W-400 D-1200
B.O.T EL+98.800
E 10239.138
N 11145.800
A A
T83-DB-550
W-580 D-360
BOT EL +98.800
MATCHLINE N 11138.000 W- 2 D-1
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-008 150

PLAN VIEW KEY PLAN


(SCALE: 1:200 mm)
00B 11/17/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU

00A 02/24/21 ISSUED FOR DESIGN ACA MMT MSU

REV DATE DESCRIPTION BY CHK APP

0 5.0 10.0 15.0 20.0

METERS

SCALE:
1 : 200M

T83-DC-55002 T83-DC-55001 T83-DC-54502 T83-DC-54501


REVISION VALIDATION

THIS REVISION NO.00B IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09003-0004-000
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

Section A-A Section ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

(SCALE: 1:25 mm) (SCALE: 1:25 mm)


REV.NO. DATE REVISION DESCRIPTION

00B 11/17/21
ISSUED FOR CONSTRUCTION WITH HOLDS
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE

ELECTRICAL PLAN/LAYOUT/DETAIL CBL


CABLE TRENCH LAYOUT
NGL FRACTIONATION TRAIN 1

GENERAL REVISION 00B TANAJIB


PLANT NO. INDEX DRAWING NUMBER
SAUDI ARABIA
SHT. NO. REV. NO.

T83 P CA-256956 007 00B

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: F2A5F820-C328-4034-9095-87F8416E1704

NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22.
2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
3.- ALL COORDINATES ARE IN METERS.
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
M AKKA H
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
E 10229.500 RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
N 11133.110 6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL

T83-P-CBL-CA-256956-002
MATCHLINE E 10174.043
E 10229.500 DRAWING T80-S-UTI-CB-790879

FOR CONT. SEE DWG.


N 11132.300
PREVAILING T83-DB-550
WIND
T83-TR-5150 W-580 D-360 LEGEND
W-400 D-1000 BOT EL +98.800
MATCHLINE N 11138.002 B.O.T EL+99.000 W- 2 D-1 N.10155046 NORTH
150 TRENCH COORDINATES
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-007 E. 5994416 EAST

CABLE TRENCH/DUCT BANK NO.


TRENCH FOR
STREET LIGHTING
B B E 10239.138 XXX-XX-XXX
W-1000 D-400
TYPE OF RACEWAY (SEE BELOW)
WIDTH AND DEPTH
N 11133.300
B.O.D. EL.+98.500 ELEVATION
T83-TR-5170 * W-6 * D-2 *W= NUMBER OF CONDUIT / D= NUMBER OF LAYER
W-400 D-1200 *150 *CONDUIT DIAMETER
B.O.T EL+98.800 * ONLY FOR DUCT BANK
T83-TR-5170
E 10245.200 W-400 D-1000
N 11126.832
B.O.T EL+99.000 TYPE OF RACEWAY

E 10239.138
XXX-XX-XXXX
N 11126.832 SEQUIENTIAL NUMBER
TYPE OF RACEWAY:
TR - (CABLE TRENCH)
DB - (DUCT BANK)
SU - (STUB-UP)
SC - (CONDUIT WITHIN STUB-UP)
DC - (CONDUIT WITHIN DUCT BANK)
AC - (ABOVE GROUND CONDUIT)
UC - (UNDER GROUND CONDUIT)

MATCHLINE E 10250.995
PLANT NUMBER

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
ELECTRICAL
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-003
ELECTRICAL
CABLE TRENCH DUCT BANK / STUB-UP
ELECTRICAL
CONDUIT

REFERENCE DRAWINGS
POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
MATCHLINE E 10174.043

CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250


ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
CABLE TRAY LAYOUT - NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256937
CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256927
GENERAL AREAS
E 10233.222 DUCT BANK, POWER TRENCH & LIGHTING - COMMOM
N 11080.369
T80-S-UTI-CB-790879
AREA
E 10233.557
N 11080.369
T83-TR-5180
E 10235.708 W-400 D-1000
N 11082.520
B.O.T EL+99.000
E 10238.185
N 11085.665
T83-TR-5170
W-400 D-1000
B.O.T EL+99.000
E 10245.200
N 11089.716

E 10238.185
TRENCH FOR N 11081.520
STREET LIGHTING T83-TR-5170 THIS DRAWING
W-400 D-1200
B.O.T EL+98.800

A A
T83-DB-555
W-580 D-360
BOT EL +98.800
MATCHLINE N 11073.000 W- 2 D-1
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-009 150

KEY PLAN
PLAN VIEW
00B 11/17/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
(SCALE: 1:200 mm)
00A 02/24/21 ISSUED FOR DESIGN ACA MMT MSU

REV DATE DESCRIPTION BY CHK APP

0 5.0 10.0 15.0 20.0

METERS

SCALE:
1 : 200M
T83-DC-55502 T83-DC-55501 T83-DC-55002 T83-DC-55001

REVISION VALIDATION

THIS REVISION NO.00B IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09003-0004-000

Section A-A Section B-B DESIGN CERTIFICATION


(DESIGN AGENCY)
REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO)
OTHER

(SCALE: 1:25 mm) (SCALE: 1:25 mm) ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

REV.NO. DATE REVISION DESCRIPTION

00B 11/17/21
ISSUED FOR CONSTRUCTION WITH HOLDS
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE

ELECTRICAL PLAN/LAYOUT/DETAIL CBL


CABLE TRENCH LAYOUT
NGL FRACTIONATION TRAIN 1

GENERAL REVISION 00B TANAJIB


PLANT NO. INDEX DRAWING NUMBER
SAUDI ARABIA
SHT. NO. REV. NO.

T83 P CA-256956 008 00B

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: F2A5F820-C328-4034-9095-87F8416E1704

NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22.
2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
3.- ALL COORDINATES ARE IN METERS.
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
M AKKA H
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
DRAWING T80-S-UTI-CB-790879
PREVAILING
WIND
LEGEND
T83-DB-555
W-580 D-360
N.10155046 NORTH
BOT EL +98.800 TRENCH COORDINATES
E. 5994416 EAST
W- 2 D-1
MATCHLINE N 11073.002 150
CABLE TRENCH/DUCT BANK NO.
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-008
B B E 10238.185 XXX-XX-XXX TYPE OF RACEWAY (SEE BELOW)
N 11071.520 W-1000 D-400 WIDTH AND DEPTH
B.O.D. EL.+98.500 ELEVATION
T83-TR-5190
*W= NUMBER OF CONDUIT / D= NUMBER OF LAYER

T83-P-CBL-CA-256956-003
W-400 D-1200
* W-6 * D-2

MATCHLINE E 10174.043
*150 *CONDUIT DIAMETER
B.O.T EL+98.800

FOR CONT. SEE DWG.


T83-TR-5190 * ONLY FOR DUCT BANK
TRENCH FOR E 10245.200 W-400 D-1000
STREET LIGHTING N 11063.840
B.O.T EL+99.000
TYPE OF RACEWAY
XXX-XX-XXXX
E 10238.185 SEQUIENTIAL NUMBER
N 11063.840
T83-TR-5191 TYPE OF RACEWAY:
E 10224.050 W-400 D-1000 TR - (CABLE TRENCH)
N 11063.840 DB - (DUCT BANK)
B.O.T EL+99.000
SU - (STUB-UP)
SC - (CONDUIT WITHIN STUB-UP)
DC - (CONDUIT WITHIN DUCT BANK)

MATCHLINE E 10250.995
AC - (ABOVE GROUND CONDUIT)
UC - (UNDER GROUND CONDUIT)
PLANT NUMBER

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
ELECTRICAL ELECTRICAL
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-004 CABLE TRENCH DUCT BANK / STUB-UP
ELECTRICAL
CONDUIT

REFERENCE DRAWINGS
POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
MATCHLINE E 10174.043

CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250


E 10224.050 ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
N 11034.587
CABLE TRAY LAYOUT - NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256937
T83-TR-5192
CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
W-400 D-1000
B.O.T EL+99.000 STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256927
GENERAL AREAS
E 10245.200
N 11039.320 DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879
T83-TR-5190
AREA
W-400 D-1000
TRENCH FOR B.O.T EL+99.000
STREET LIGHTING E 10238.185
N 11034.680
E 10238.185
N 11027.520
T83-TR-5190
W-400 D-1200
B.O.T EL+98.800

A A
T83-DB-560
W-580 D-360 THIS DRAWING
BOT EL +98.800
MATCHLINE N 11019.000 W- 2 D-1
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-010 150

PLAN VIEW
(SCALE: 1:200 mm)

KEY PLAN

00B 11/17/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU

00A 02/24/21 ISSUED FOR DESIGN ACA MMT MSU

T83-DC-56002 T83-DC-56001 T83-DC-55502 T83-DC-55501


REV DATE DESCRIPTION BY CHK APP

0 5.0 10.0 15.0 20.0

METERS

Section A-A Section B-B SCALE:


1 : 200M

(SCALE: 1:25 mm) (SCALE: 1:25 mm)


REVISION VALIDATION

THIS REVISION NO.00B IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09003-0004-000
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

REV.NO. DATE REVISION DESCRIPTION

00B 11/17/21
ISSUED FOR CONSTRUCTION WITH HOLDS
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE

ELECTRICAL PLAN/LAYOUT/DETAIL CBL


CABLE TRENCH LAYOUT
NGL FRACTIONATION TRAIN 1

GENERAL REVISION 00B TANAJIB


PLANT NO. INDEX DRAWING NUMBER
SAUDI ARABIA
SHT. NO. REV. NO.

T83 P CA-256956 009 00B

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: F2A5F820-C328-4034-9095-87F8416E1704

NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22.
2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
3.- ALL COORDINATES ARE IN METERS.
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
M AKKA H
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
DRAWING T80-S-UTI-CB-790879
PREVAILING
WIND E 10233.557 LEGEND
N 11018.670 T83-DB-560
T83-TR-5200 W-580 D-360
N.10155046 NORTH
W-400 D-1000 BOT EL +98.800 TRENCH COORDINATES
E 10233.222 E. 5994416 EAST
N 11018.670 B.O.T EL+99.000 W- 2 D-1
150
MATCHLINE N 11019.002 CABLE TRENCH/DUCT BANK NO.
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-009 XXX-XX-XXX TYPE OF RACEWAY (SEE BELOW)
B B W-1000 D-400 WIDTH AND DEPTH
B.O.D. EL.+98.500 ELEVATION
T83-TR-5210 * W-6 * D-2 *W= NUMBER OF CONDUIT / D= NUMBER OF LAYER
W-400 D-1200 *150 *CONDUIT DIAMETER
TRENCH FOR B.O.T EL+98.800 * ONLY FOR DUCT BANK
STREET LIGHTING
E 10238.185
N 11017.520
TYPE OF RACEWAY
XXX-XX-XXXX
E 10245.200
N 11007.794 SEQUIENTIAL NUMBER
TYPE OF RACEWAY:
T83-TR-5210 TR - (CABLE TRENCH)
DB - (DUCT BANK)
W-400 D-1000

FOR CONT. SEE DWG. T83-P-CBL-CA-256956-004


SU - (STUB-UP)
B.O.T EL+99.000 SC - (CONDUIT WITHIN STUB-UP)
E 10238.185 DC - (CONDUIT WITHIN DUCT BANK)
N 11014.809 AC - (ABOVE GROUND CONDUIT)
UC - (UNDER GROUND CONDUIT)
E 10235.707
N 11016.520 PLANT NUMBER

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
MATCHLINE E 10174.043

MATCHLINE E 10250.995
ELECTRICAL ELECTRICAL
CABLE TRENCH DUCT BANK / STUB-UP
ELECTRICAL
CONDUIT

REFERENCE DRAWINGS
POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
CABLE TRAY LAYOUT - NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256937
CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256927
GENERAL AREAS
DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879
AREA

E 10245.200
N 10978.775
E 10238.185
N 10971.759
T83-TR-5210
W-400 D-1000
B.O.T EL+99.000

T83-TR-5210
W-400 D-1200
B.O.T EL+98.800
A A E 10238.185
N 10970.001 THIS DRAWING
T83-DB-565
MATCHLINE N 10965.000 W-580 D-360
BOT EL +98.800
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-011
W- 2 D-1
150

PLAN VIEW
(SCALE: 1:200 mm)

KEY PLAN

00B 11/17/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU

00A 02/24/21 ISSUED FOR DESIGN ACA MMT MSU

T83-DC-56502 T83-DC-56501 T83-DC-56002 T83-DC-56001 REV DATE DESCRIPTION BY CHK APP

0 5.0 10.0 15.0 20.0

METERS

1 : 200M
Section A-A Section B-B SCALE:

(SCALE: 1:25 mm) (SCALE: 1:25 mm)


REVISION VALIDATION

THIS REVISION NO.00B IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09003-0004-000
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

REV.NO. DATE REVISION DESCRIPTION

00B 11/17/21
ISSUED FOR CONSTRUCTION WITH HOLDS
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE

ELECTRICAL PLAN/LAYOUT/DETAIL CBL


CABLE TRENCH LAYOUT
NGL FRACTIONATION TRAIN 1

GENERAL REVISION 00B TANAJIB


PLANT NO. INDEX DRAWING NUMBER
SAUDI ARABIA
SHT. NO. REV. NO.

T83 P CA-256956 010 00B

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: F2A5F820-C328-4034-9095-87F8416E1704

NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22.
2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
3.- ALL COORDINATES ARE IN METERS.
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
M AKKA H
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL

T83-P-CBL-CA-256956-004
MATCHLINE E 10174.043
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)

FOR CONT. SEE DWG.


6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
DRAWING T80-S-UTI-CB-790879
PREVAILING
WIND E 10233.557
N 10961.150 T83-DB-565 LEGEND
T83-TR-5220 W-580 D-360
E 10233.222 E 10234.957 W-400 D-1000 BOT EL +98.800 N.10155046 NORTH
N 10961.150 N 10959.750 TRENCH COORDINATES
MATCHLINE N 10965.002 B.O.T EL+99.000 W- 2 D-1 E. 5994416 EAST
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-010 150
CABLE TRENCH/DUCT BANK NO.

XXX-XX-XXX TYPE OF RACEWAY (SEE BELOW)


C C W-1000 D-400 WIDTH AND DEPTH
E 10238.185 B.O.D. EL.+98.500 ELEVATION
N 10960.000 * W-6 * D-2 *W= NUMBER OF CONDUIT / D= NUMBER OF LAYER
T83-TR-5230 *150 *CONDUIT DIAMETER
TRENCH FOR W-400 D-1200 * ONLY FOR DUCT BANK
STREET LIGHTING B.O.T EL+98.800
T83-TR-5230
TYPE OF RACEWAY
W-400 D-1000
B.O.T EL+99.000 XXX-XX-XXXX
T83-DC-73502 T83-DC-73501 E 10245.200 SEQUIENTIAL NUMBER
N 10951.436
TYPE OF RACEWAY:
E 10238.185
N 10958.452 TR - (CABLE TRENCH)
DB - (DUCT BANK)
SU - (STUB-UP)
SC - (CONDUIT WITHIN STUB-UP)
DC - (CONDUIT WITHIN DUCT BANK)

Section A-A AC - (ABOVE GROUND CONDUIT)


UC - (UNDER GROUND CONDUIT)
(SCALE: 1:25 mm) PLANT NUMBER

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
E 10245.200
N 10944.720
E 10231.003 ELECTRICAL ELECTRICAL
N 10926.780 CABLE TRENCH DUCT BANK / STUB-UP
ELECTRICAL
E 10238.185
CONDUIT
N 10937.704
E 10238.185 REFERENCE DRAWINGS
N 10935.641
POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
T83-TR-5230
T83-DB-570
POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
W-400 D-1200
B.O.T EL+98.800 W-580 D-360 CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
E 10231.471
BOT EL +98.800 ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
N 10926.780 W- 2 D-1 CABLE TRAY LAYOUT - NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256937
150 CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2
T83-TR-5240
T83-P-CBL-CA-256957
FOR CONT. SEE DWG. T83-P-CBL-CA-256956-005 STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256927
W-400 D-1000
B B B.O.T EL+99.000 GENERAL AREAS
DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879
TRENCH FOR T83-TR-5250 AREA
STREET LIGHTING W-400 D-1200
T83-DC-57002 T83-DC-57001 B.O.T EL+98.800
MATCHLINE E 10174.043

E 10238.185
N 10925.641 TRENCH FOR
T83-TR-5250 STREET LIGHTING
W-400 D-1000
B.O.T EL+99.000
E 10238.185
Section B-B N 10921.974
E 10245.200
(SCALE: 1:25 mm) N 10914.958
E 10234.092
N 10922.241
E 10220.350
N 10907.000
TRENCH FOR GENERAL T83-TR-5255 THIS DRAWING

MATCHLINE E 10250.995
AREA LIGHTING W-400 D-1000
B.O.T EL+99.000

T83-DC-56502 T83-DC-56501 E 10235.348


N 10884.324
E 10244.014
N 10886.005
T83-TR-5250 KEY PLAN
W-400 D-1000
B.O.T EL+99.000

Section C-C E 10245.200


N 10887.191
T83-DB-735
W-580 D-360
00B

00A
11/17/21

02/24/21
ISSUED FOR CONSTRUCTION WITH HOLDS

ISSUED FOR DESIGN


ACA

ACA
MMT

MMT
MSU

MSU

(SCALE: 1:25 mm) A BOT EL +98.800


W- 2 D-1
FOR CONT. SEE DWG.
T83-P-CBL-CA-256957-005
150
REV DATE DESCRIPTION BY CHK APP
A E 10245.000
N 10884.324
T83-TR-5000
0 5.0 10.0 15.0 20.0
W-400 D-1200
B.O.T EL+98.800 METERS

T83-TR-5000 1 : 200M
SCALE:
T83-TR-5000 W-400 D-1000
W-400 D-1000 B.O.T EL+99.000
B.O.T EL+99.000 E 10231.003 REVISION VALIDATION

E 10176.857 N 10876.350
THIS REVISION NO.00B IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
N 10876.800 E 10227.830
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
N 10876.350
E 10177.865
N 10876.350 E 10226.051 10-09003-0004-000
N 10876.800
E 10181.336 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
N 10876.350 MATCHLINE N 10870.000 ENGG./DATE
(DESIGN AGENCY)
CERTIFIED BY/DATE
REQUIRED
CONST. AGENCY/DATE
(SAUDI ARAMCO)
OPERATIONS/DATE BY/DATE
E 10182.345
N 10876.800
REV.NO. DATE REVISION DESCRIPTION

00B 11/17/21
ISSUED FOR CONSTRUCTION WITH HOLDS
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR

PLAN VIEW 10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED

(SCALE: 1:200 mm)


SAUDI ARABIAN OIL COMPANY
DRAWING TYPE

ELECTRICAL PLAN/LAYOUT/DETAIL CBL


CABLE TRENCH LAYOUT
NGL FRACTIONATION TRAIN 1

GENERAL REVISION 00B TANAJIB


PLANT NO. INDEX DRAWING NUMBER
SAUDI ARABIA
SHT. NO. REV. NO.

T83 P CA-256956 011 00B

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05