Professional Documents
Culture Documents
NOTES:
INDEX
REVISION
DRAWING NUMBER DESCRIPTION
00A 00B 00C
T83-P-CBL-CA-256958-FS1 DRAWING INDEX SHEET 02-18-21 11-04-21 25-03-22
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
T83-P-CBL-CA-256958-003 NGL FRACTIONATION GENERAL AREA 02-18-21 11-04-21 25-03-22
REFERENCE DRAWINGS
KEY PLAN
00C 03/25/22 ISSUED FOR CONSTRUCTION WITH HOLDS MMB MMT RRG
00B 11/04/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
SCALE:
REVISION VALIDATION
10-09003-0004-000
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
00C 03/25/22
ISSUED FOR CONSTRUCTION WITH HOLDS
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED
ACCU-01
ACCU-02
W-600 D-1400 DC - (CONDUIT WITHIN DUCT BANK)
B.O.T EL+98.600 AC - (ABOVE GROUND CONDUIT)
E 10138.424 UC - (UNDER GROUND CONDUIT)
N 11528.485
T83-TR-0097
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
PLANT NUMBER
T83-DB-111 W-800 D-1400 OME-004
W-580 D-580 E 10139.444 ELECTRICAL ELECTRICAL
B.O.T EL+98.600
N 11528.071 CABLE TRENCH DUCT BANK / STUB-UP
BOT EL +98.600 T83-SU-135
W- 4 D-2 T83-TR-0097 W-580 D-580 ELECTRICAL BOTTOM OF
E 10136.750 D D B.O.C.
6 W-800 D-1400 BOT EL +98.620 CONDUIT EL+XX.XXX CONDUIT
N 11528.885
B.O.T EL+98.600 W- 4 D-2
MATCHLINE E 10079.993
Detail A
B.O.T EL+99.000 DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879
W-2100 D-1000
E 10137.010
AREA
B.O.T EL+99.000
N 11513.651
E 10165.000
N 11512.601
T83-P-CBL-CA-256958-005
MATCHLINE E 10174.045
E 10107.840
N 11512.801
T83-TR-5100
T83-TR-5140
W-400 D-1200
W-400 D-1000
B.O.T EL+98.800 KEY PLAN
B.O.T EL+99.000
E 10094.990
N 11487.500 E 10165.000
N 11487.001
T83-DB-520 A A 00C 03/25/22 ISSUED FOR CONSTRUCTION WITH HOLDS MMB MMT RRG
W-580 D-360 00B 11/04/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
BOT EL +98.800 00A 02/18/21 ISSUED FOR DESIGN ACA MMT MSU
W- 2 D-1 MATCHLINE N 11480.500
150
FOR CONT. SEE DWG. T83-P-CBL-CA-256958-002 REV DATE DESCRIPTION BY CHK APP
METERS
15.0 20.0
TO WELDNG
T83-UC-0042|100 mm
E 10137.677 SOCKET
REVISION VALIDATION
N 11523.010
E EL+100.140 THIS REVISION NO.00C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
T83-DC-11003
T83-DC-11004 T83-DC-11002 10-09003-0004-000
T83-SC-13501 T83-SC-13502 T83-DC-11005 T83-DC-11001 T83-DC-11101 T83-DC-11102 EL+99.700 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
T83-DC-52001 T83-DC-52002 T83-TR-0090 ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
00C 03/25/22
ISSUED FOR CONSTRUCTION WITH HOLDS
T83-SC-13503 T83-SC-13504 T83-DC-11010 T83-DC-11006 T83-DC-11103 T83-DC-11104 JOB ORDER/EWO NO.
T83-DC-11009 T83-DC-11007
E 10-09003-0004
THIS REVISION IS NOT TO BE USED FOR
CONSTRUCTION UNTIL CERTIFIED AND DATED
T83-DC-11008
SAUDI ARABIAN OIL COMPANY
Section A-A Section B-B Section C-C Section D-D Detail A Section E-E ELECTRICAL PLAN/LAYOUT/DETAIL
DRAWING TYPE
CBL
(SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm)
CABLE TRENCH LAYOUT
NGL FRACTIONATION GENERAL AREA
NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22. 2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º
CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
3.- ALL COORDINATES ARE IN METERS.
M AKKA H
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
DRAWING T80-S-UTI-CB-790879
PREVAILING 7.- UNDERGROUND CONDUIT SHALL BE PVC CONDUIT TYPE
E 10107.005
WIND
N 11475.150
DB-120 (MINIMUM MODULUS OF ELASTICITY 500,000 PSI) PER
E 10156.634 NEMA TC 6 & 8 OR TYPE EPC-40-PVC PER NEMA TC 2.
T83-TR-5080 B.O.C. N 11466.478
LEGEND
W-400 D-1200 EL+98.800 T83-TR-0047
B.O.T EL+98.800 T83-UC-5004|150 mm W-400 D-1000
N.10155046 NORTH
E 10112.894 E 10127.005 E 10138.109 B.O.T EL+99.000 TRENCH COORDINATES
N 11467.543 N 11475.150 N 11475.150 E. 5994416 EAST
E 10156.634
T83-TR-5080 T83-TR-5070 T83-TR-5070 N 11466.478
T83-DB-660 CABLE TRENCH/DUCT BANK NO.
W-400 D-1000 MATCHLINE N 11480.502 W-400 D-1200 W-400 D-1000 E 10163.067
W-580 D-360 N 11469.738
B.O.T EL+99.000 B.O.T EL+98.800 B.O.T EL+99.000 XXX-XX-XXX TYPE OF RACEWAY (SEE BELOW)
BOT EL +98.800 FOR CONT. SEE DWG. E 10164.284
W-1000 D-400 WIDTH AND DEPTH
W- 2 D-1 N 11469.036
150
T83-P-CBL-CA-256958-001 T83-TR-5070
B.O.D. EL.+98.500 ELEVATION
* W-6 * D-2 *W= NUMBER OF CONDUIT / D= NUMBER OF LAYER
W-400 D-1000 *150 *CONDUIT DIAMETER
T83-TR-0048 XXX-XX-XXXX
E 10098.443 W-600 D-1000
N 11475.150 SEQUIENTIAL NUMBER
B.O.T EL+99.000
T83-TR-5090 TYPE OF RACEWAY:
W-400 D-1200 MATCHLINE E 10174.045 TR - (CABLE TRENCH)
B.O.T EL+98.800 DB - (DUCT BANK)
E 10094.990
FOR CONT. SEE DWG. SU - (STUB-UP)
SC - (CONDUIT WITHIN STUB-UP)
N 11473.500 T83-P-CBL-CA-256958-006 DC - (CONDUIT WITHIN DUCT BANK)
E 10094.990 E 10147.482 AC - (ABOVE GROUND CONDUIT)
E 10113.131 N 11469.738
N 11471.697 T83-TR-0048 UC - (UNDER GROUND CONDUIT)
N 11467.306
T83-TR-5080 E 10153.800 E 10156.634
W-600 D-1000
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
N 11466.478 N 11466.478 PLANT NUMBER
W-400 D-1000 B.O.T EL+99.000
B.O.T EL+99.000 T83-TR-0045 ELECTRICAL ELECTRICAL
W-700 D-1400 T83-TR-0045 CABLE TRENCH DUCT BANK / STUB-UP
E 10086.350
B.O.T EL+98.600 T83-TR-0046 W-700 D-1000
N 11463.057 E 10113.131 ELECTRICAL BOTTOM OF
E 10153.800 FUEL W-600 D-1000 B.O.T EL+99.000
B.O.C.
N 11460.650 B B CONDUIT CONDUIT
N 11464.500 B.O.T EL+99.000 EL+XX.XXX
T83-TR-5085 T83-DB-130 TANK
W-400 D-1000 W-800 D-580 T83-TR-0046 REFERENCE DRAWINGS
B.O.T EL+99.000 BOT EL +98.600 W-800 D-1500
W- 6 D-2 B.O.T EL+98.500 T83-SU-110 POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
TRENCH FOR STREET LIGHTING W-800 D-580
E 10098.450 6 POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
N 11454.565 C C E 10166.000 BOT EL +98.500
T83-TR-0045 N 11456.800 CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
E 10086.350 W- 6 D-2
N 11454.565 W-700 D-1400 ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
150
B.O.T EL+98.600 ELECTRICAL CABLE SCHEDULE - SUBSTATION 018 T83-P-CCS-CD-256970
E 10153.800
EDG-067 FOR ADITIONAL DETAILS OF EMBEDDED T83-EDG-067 FLOOR PLAN NGLFRACTIONATION T83-R-ARC-CA-255447
N 11455.500 CONDUITS REFER TO ARCHITECTURE
DRAWING T83-R-ARC-CA-255447 CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256956
T83-TR-0045
CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
W-700 D-1000
B.O.T EL+99.000 E 10166.026 STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256929
N 11448.180 GENERAL AREAS
MATCHLINE E 10079.993
E 10166.026
N 11442.870
T83-TR-0050
SS-017 W-1500 D-1000
B.O.T EL+99.000
E 10154.400
N 11437.570 E 10159.975
E 10154.400 N 11436.820
N 11437.570
T83-TR-0060
FOR CONT. SEE DWG.
T83-P-CBL-CA-257011 W-3200 D-1000
B.O.T EL+99.000
THIS DRAWING
MATCHLINE N 11429.235
FOR CONT. SEE DWG. T83-P-CBL-CA-256958-003
T83-TR-0040
W-1900 D-1000
T83-TR-5090
B.O.T EL+99.000
W-400 D-1000
B.O.T EL+99.000
PLAN VIEW
(SCALE: 1:200 mm)
KEY PLAN
00C 03/25/22 ISSUED FOR CONSTRUCTION WITH HOLDS MMB MMT RRG
00B 11/04/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
EL+100.140
00A 02/18/21 ISSUED FOR DESIGN ACA MMT MSU
TO WELDNG
T83-SC-11002 T83-UC-0041|150 mm
T83-DC-13002 E 10156.634 SOCKET
T83-SC-11001 T83-SC-11003 REV DATE DESCRIPTION BY CHK APP
T83-DC-13001 T83-DC-13003 N 11468.253
EL+99.700
T83-DC-66001 T83-DC-66002
T83-TR-0047
W-400 D-1000 0 5.0 10.0 15.0 20.0
D D
B.O.T EL+99.000
METERS
SCALE:
1 : 200M
T83-DC-13004 T83-DC-13006
T83-DC-13005 T83-SC-11004 T83-SC-11006
T83-SC-11005 REVISION VALIDATION
Section A-A Section B-B Section C-C Detail A Section D-D REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-09003-0004-000
(SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm)
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
HOLD ENGG./DATE
(DESIGN AGENCY)
CERTIFIED BY/DATE
REQUIRED
CONST. AGENCY/DATE
(SAUDI ARAMCO)
OPERATIONS/DATE BY/DATE
00C 03/25/22
ISSUED FOR CONSTRUCTION WITH HOLDS
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED
NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22. T83-TR-5090 T83-TR-0040 2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º
W-400 D-1000 W-1900 D-1000
CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
B.O.T EL+99.000 B.O.T EL+99.000
MATCHLINE N 11429.237 3.- ALL COORDINATES ARE IN METERS.
M AKKA H
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
FOR CONT. SEE DWG. T83-P-CBL-CA-256958-002 5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
PREVAILING
WIND Detail C T83-TR-0060
W-3200 D-1000
DRAWING T80-S-UTI-CB-790879
7.- UNDERGROUND CONDUIT SHALL BE PVC CONDUIT TYPE
DB-120 (MINIMUM MODULUS OF ELASTICITY 500,000 PSI) PER
NEMA TC 6 & 8 OR TYPE EPC-40-PVC PER NEMA TC 2.
FOR CONT. SEE DWG. B.O.T EL+99.000
T83-P-CBL-CA-257011 LEGEND
E 10160.487
N 11421.617
N.10155046 NORTH
E 10160.487 TRENCH COORDINATES
E. 5994416 EAST
N 11420.702
FOR CONT. SEE CABLE TRAY PLAN
FOR CONT. SEE CABLE TRAY PLAN CABLE TRENCH/DUCT BANK NO.
DWG. T83-P-CBL-CA-256937
DWG. T83-P-CBL-CA-256937
E 10154.400 XXX-XX-XXX TYPE OF RACEWAY (SEE BELOW)
Detail D
N 11437.570 W-1000 D-400 WIDTH AND DEPTH
B.O.D. EL.+98.500 ELEVATION
T83-DC-10503 * W-6 * D-2 *W= NUMBER OF CONDUIT / D= NUMBER OF LAYER
T83-DC-10502 T83-DC-10504 *150 *CONDUIT DIAMETER
T83-DC-10501 T83-DC-10505
T83-P-CBL-CA-256958-006
* ONLY FOR DUCT BANK
MATCHLINE E 10174.045
E 10097.500
N 11403.078 TYPE OF RACEWAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
N 11403.078 PLANT NUMBER
ELECTRICAL ELECTRICAL
MATCHLINE E 10079.993
T83-TR-5090
FOR CONT. SEE DWG.
Section B-B W-400 D-1000
B.O.T EL+99.000
T83-P-CBL-CA-256958-007
(SCALE: 1:25 mm)
E 10103.180
N 11369.778
E 10131.890
E 10117.933 N 11369.778
N 11369.778
E 10134.390
E 10117.533 N 11367.078
T83-TR-0001 N 11367.078
W-1200 D-1400 T83-TR-0005 T83-DB-106
B.O.T EL+98.600 W-1500 D-1400 W-1460 D-580
B.O.T EL+98.600 BOT EL +98.600
T83-DB-105 A A B B W- 12 D-2
W-1240 D-580 THIS DRAWING
6
BOT EL +98.600
E 10134.390
W- 10 D-2
N 11360.078
6
T83-TR-0015
E 10117.533 W-1500 D-1400
N 11357.078 B.O.T EL+98.600
T83-TR-0010 E 10133.890
W-1200 D-1400 N 11357.218
B.O.T EL+98.600 T83-TR-0015
T83-TR-0010 W-2500 D-1000
W-2200 D-1000 B.O.T EL+99.000
B.O.T EL+99.000 E 10124.343
N 11357.218
MATCHLINE N 11349.862
FOR CONT. SEE DWG. T83-P-CBL-CA-256958-004
E 10119.683
N 11352.558
F KEY PLAN
PLAN VIEW T83-TR-0020
W-4500 D-1000
B.O.T EL+99.000 00C 03/25/22 ISSUED FOR CONSTRUCTION WITH HOLDS MMB MMT RRG
T83-UC-0023|150 mm T83-UC-0033|150 mm (SCALE: 1:200 mm)
00B 11/04/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
E 10131.893 E 10134.390
N 11381.801 N 11381.801 T83-UC-0008|150 mm T83-UC-0007|150 mm 00A 02/18/21 ISSUED FOR DESIGN ACA MMT MSU
T83-UC-0024|150 mm T83-UC-0032|150 mm T83-UC-0034|150 mm E 10154.350 E 10154.570
E 10132.113 E 10134.170 E 10134.610 N 11423.140 N 11423.140 T83-UC-0015|150 mm T83-UC-0020|150 mm
T83-UC-0022|150 mm N 11381.801 N 11381.801 N 11381.801 T83-UC-0009|150 mm T83-UC-0006|150 mm E 10159.089 E 10159.539 REV DATE DESCRIPTION BY CHK APP
E 10131.673 T83-UC-0025|150 mm T83-UC-0031|150 mm T83-UC-0035|150 mm E 10154.130 E 10154.790 N 11420.440 N 11420.440
N 11381.801 E 10132.333 E 10133.950 E 10134.830 N 11423.140 N 11423.140 T83-UC-0014|150 mm T83-UC-0019|150 mm
T83-UC-0021|150 mm N 11381.801 N 11381.801 N 11381.801 T83-UC-0010|150 mm T83-UC-0001|150 mm E 10159.089 E 10159.539
E 10131.453 E 10153.910 E 10154.790 N 11420.220 N 11420.220 0 5.0 10.0 15.0 20.0
N 11381.801 N 11423.140 N 11422.550 T83-UC-0013|150 mm T83-UC-0018|150 mm
T83-UC-0026|150 mm E 10159.089 E 10159.539 METERS
E 10131.453 N 11420.000 N 11420.000
N 11381.351 C C D D T83-UC-0012|150 mm T83-UC-0017|150 mm
1 : 200M
E 10159.089 E 10159.539 SCALE:
N 11419.780 N 11419.780
E E T83-UC-0011|150 mm T83-UC-0016|150 mm
T83-UC-0027|150 mm T83-UC-0030|150 mm E 10159.089 E 10159.539 REVISION VALIDATION
E 10131.673 E 10132.333 N 11419.560 N 11419.560
N 11381.351 N 11381.351 T83-UC-0036|150 mm T83-UC-0040|150 mm THIS REVISION NO.00C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
T83-UC-0028|150 mm T83-UC-0029|150 mm E 10133.950 E 10134.830 T83-UC-0005|150 mm T83-UC-0002|150 mm REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
E 10131.893 E 10132.113 N 11381.351 N 11381.351 E 10153.910 E 10154.570
N 11381.351 N 11381.351 T83-UC-0037|150 mm T83-UC-0039|150 mm N 11422.550 N 11422.550 F 10-09003-0004-000
E 10134.170 E 10134.610 T83-UC-0004|150 mm T83-UC-0003|150 mm
N 11381.351 N 11381.351 E 10154.130 E 10154.350 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
Detail A
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
Detail B T83-UC-0038|150 mm
E 10134.390
N 11381.351
N 11422.550
Detail C N 11422.550
Detail D ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
(SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm)
REV.NO. DATE REVISION DESCRIPTION
EL+100.140 EL+100.140 EL+100.140 EL+100.140 00C 03/25/22
ISSUED FOR CONSTRUCTION WITH HOLDS
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED
EL+99.700 EL+99.700 EL+99.700 EL+99.700
T83-TR-0001 T83-TR-0005 T83-TR-0040 T83-TR-0060
SAUDI ARABIAN OIL COMPANY
W-2000 D-1000 W-2500 D-1000 W-1900 D-1000 DRAWING TYPE
W-3200 D-1000 ELECTRICAL PLAN/LAYOUT/DETAIL CBL
B.O.T EL+99.000 B.O.T EL+99.000 B.O.T EL+99.000 B.O.T EL+99.000
CABLE TRENCH LAYOUT
NGL FRACTIONATION GENERAL AREA
Section C-C Section D-D Section E-E Section F-F TANAJIB SAUDI ARABIA
(SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm)
GENERAL REVISION 00C PLANT NO.
P
INDEX DRAWING NUMBER
CA-256958
SHT. NO.
003
REV. NO.
00C
T83
Saudi Aramco 2615 ENG. (05/05)
NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22. 2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º
CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
T83-TR-0025 VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
E 10124.010 W-1000 D-1500 3.- ALL COORDINATES ARE IN METERS.
M AKKA H
N 11342.925 B.O.T EL+98.500 4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
T83-TR-0025
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
E 10125.030
N 11342.810 PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
W-3500 D-1000
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
B.O.T EL+99.000
6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
T83-TR-0020 T83-SU-120 DRAWING T80-S-UTI-CB-790879
PREVAILING W-4500 D-1000 W-1020 D-580 7.- UNDERGROUND CONDUIT SHALL BE PVC CONDUIT TYPE
WIND B.O.T EL+99.000 BOT EL +99.690 DB-120 (MINIMUM MODULUS OF ELASTICITY 500,000 PSI) PER
W- 8 D-2 NEMA TC 6 & 8 OR TYPE EPC-40-PVC PER NEMA TC 2.
150 LEGEND
MATCHLINE N 11349.864
FOR CONT. SEE DWG. T83-P-CBL-CA-256958-003 N.10155046 NORTH
TRENCH COORDINATES
MATCHLINE E 10079.993
E. 5994416 EAST
T83-P-CBL-CA-256958-007
T83-TR-0025
MATCHLINE E 10174.045
W-800 D-1500 TYPE OF RACEWAY:
B
W-1020 D-580
BOT EL +98.500
Detail A UC - (UNDER GROUND CONDUIT)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
PLANT NUMBER
W- 8 D-2
150 ELECTRICAL ELECTRICAL
CABLE TRENCH DUCT BANK / STUB-UP
T83-TR-0035
W-1000 D-1500 ELECTRICAL B.O.C. BOTTOM OF
CONDUIT EL+XX.XXX CONDUIT
E 10092.724 B.O.T EL+98.500
N 11323.500
E 10123.750 FOR CONT. SEE CABLE TRAY PLAN
REFERENCE DRAWINGS
N 11331.400 DWG. T83-P-CBL-CA-256937
E 10116.597 T83-TR-0035 POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
N 11323.500
E 10086.800
W-800 D-1000 E 10162.392 POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
B.O.T EL+99.000 N 11318.821
N 11317.576 CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
E 10105.612 ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
N 11300.716
PIB-038
T83-TR-0140 ELECTRICAL CABLE SCHEDULE - SUBSTATION 018 T83-P-CCS-CD-256970
E 10103.327
N 11304.675 W-500 D-1000 T83-EDG-067 FLOOR PLAN NGLFRACTIONATION T83-R-ARC-CA-255447
B.O.T EL+99.000
T83-TR-5010 CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256956
W-400 D-1000 E 10161.532
N 11318.821 CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
B.O.T EL+99.000
STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256929
E 10086.800 GENERAL AREAS
N 11310.397
T83-TR-5000 DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879
W-400 D-1000 AREA
B.O.T EL+99.000
E 10096.710
N 11304.675
T83-TR-5000
W-400 D-1200 T83-TR-5020
B.O.T EL+98.800 W-400 D-1000
B.O.T EL+99.000
E 10096.710
N 11301.500
C C
PLAN VIEW
(SCALE: 1:200 mm)
KEY PLAN
00C 03/25/22 ISSUED FOR CONSTRUCTION WITH HOLDS MMB MMT RRG
00B 11/04/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
T83-SC-10001
1 : 200M
T83-SC-12002 T83-SC-12003 T83-SC-10002 T83-SC-10502 T83-SC-10503 SCALE:
00C 03/25/22
ISSUED FOR CONSTRUCTION WITH HOLDS
Section A-A Section B-B Section C-C Detail A Section D-D JOB ORDER/EWO NO.
10-09003-0004
THIS REVISION IS NOT TO BE USED FOR
CONSTRUCTION UNTIL CERTIFIED AND DATED
(SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm)
SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22. 2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º
CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
T83-DB-500
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
W-580 D-360
E 10216.000 3.- ALL COORDINATES ARE IN METERS.
BOT EL +98.800 N 11559.686 4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
M AKKA H W- 2 D-1
T83-TR-5610 5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
150 W-400 D-1200 PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
T83-TR-5110 B.O.T EL+98.800 RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
W-400 D-1200 MATCHLINE N 11569.139 6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
T83-TR-5610 DRAWING T80-S-UTI-CB-790879
B.O.T EL+98.800 W-400 D-1000
PREVAILING 7.- UNDERGROUND CONDUIT SHALL BE PVC CONDUIT TYPE
WIND E 10200.000 B.O.T EL+99.000 DB-120 (MINIMUM MODULUS OF ELASTICITY 500,000 PSI) PER
N 11559.686 E 10220.305 NEMA TC 6 & 8 OR TYPE EPC-40-PVC PER NEMA TC 2.
T83-SC-02 E 10194.449 N 11563.650
N 11563.650
LEGEND
T83-SC-01 T83-SC-03 E 10187.127 T83-DC-54001 T83-DC-54002
N 11547.221
T83-TR-5610 N.10155046 NORTH
T83-TR-5110 TRENCH COORDINATES
W-400 D-1000 E. 5994416 EAST
W-400 D-1000
B.O.T EL+99.000
E T83-TR-5610 B.O.T EL+99.000
W-400 D-1000 CABLE TRENCH/DUCT BANK NO.
E 10198.413
B.O.T EL+99.000
N 11559.686
E E 10220.305
N 11559.686
Section G-G XXX-XX-XXX
W-1000 D-400
TYPE OF RACEWAY (SEE BELOW)
WIDTH AND DEPTH
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
T83-TR-0130 N 11542.800 PLANT NUMBER
T83-DB-220
Section B-B
B.O.T EL+98.820
D D
C C
T83-DB-120
W-580 D-580
W-600 D-1400
B.O.T EL+98.600
W-580 D-580
BOT EL +98.600
H H T83-SU-345
W-800 D-360
B.O.T EL+98.800
Section H-H ELECTRICAL
CABLE TRENCH
ELECTRICAL
DUCT BANK / STUB-UP
(SCALE: 1:25 mm)
E 10176.595 BOT EL +98.600 I I BOT EL +99.900
(SCALE: 1:25 mm)
N 11540.602 W- 4 D-2 ELECTRICAL BOTTOM OF
W- 4 D-2 B.O.C.
6 W- 3 D-1 CONDUIT CONDUIT
T83-SU-150 6 EL+XX.XXX
W-800 D-360 T83-TR-0125 150
E 10187.027 T83-TR-1125
BOT EL +99.900 W-600 D-1400 E 10239.395 REFERENCE DRAWINGS
N 11536.003 W-600 D-1400 N 11540.602
T83-DB-12001 T83-DB-12002 W- 3 D-1 B.O.T EL+98.600 T83-DB-22002 T83-DB-22001 POWER TYPICAL INSTALLATION DETAILS
B.O.T EL+98.600 T80-P-EDT-CA-792479
150 T83-TR-0125 POWER PLAN - NGL FRACTIONATION GENERAL AREA
T83-SU-145 T83-TR-1125
E 10228.865
OME-003 T83-P-EPD-CA-256984
W-600 D-1000 N 11536.002
W-800 D-360 W-600 D-1000 T83-SU-340 CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
T83-TR-0125 B.O.T EL+99.000
BOT EL +98.820 W-600 D-1400 B.O.T EL+99.000 W-800 D-360 T83-DB-22004 T83-DB-22003 ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
W- 3 D-1 B.O.T EL+98.600 BOT EL +99.900 ELECTRICAL CABLE SCHEDULE - SUBSTATION 018 T83-P-CCS-CD-256970
T83-DB-115 T83-TR-1125
150 E 10187.027 E 10228.865 W- 3 D-1 T83-EDG-067 FLOOR PLAN NGLFRACTIONATION
T83-DB-12003 T83-DB-12004 W-580 D-580 W-600 D-1400 T83-R-ARC-CA-255447
E 10177.748 N 11528.303 B B N 11528.267 150
BOT EL +98.600 B.O.T EL+98.600
J J CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256956
N 11523.702
W- 4 D-2 E 10237.550 Section I-I CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
Section C-C E 10177.748
N 11521.702 A A 8
T83-DB-215
W-580 D-580 K K
N 11523.702
E 10237.550
(SCALE: 1:25 mm) STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256929
(SCALE: 1:25 mm) T83-TR-0120 BOT EL +98.600 GENERAL AREAS
T83-TR-0110 T83-TR-1120 N 11521.702
W-600 D-1400 W- 4 D-2
W-800 D-1180 W-600 D-1400 T83-TR-1110 DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879
B.O.T EL+98.600 8
B.O.T EL+98.820 T83-TR-0110 B.O.T EL+98.600 W-800 D-1200 AREA
W-300 D-1000 E 10187.027
E 10228.865 B.O.T EL+98.800
N 11523.303 T83-DC-21502 T83-DC-21501
B.O.T EL+99.000 N 11523.267
T83-TR-0120 T83-TR-1110
T83-SC-02 E 10177.748 W-600 D-1000
W-600 D-1000 T83-TR-1120
T83-SC-01 T83-SC-03 N 11514.701
B.O.T EL+99.000 W-600 D-1000 B.O.T EL+99.000
E 10176.562
N 11514.701 E 10187.027 B.O.T EL+99.000
T83-TR-0090 N 11514.401 T83-DC-21504 T83-DC-21503
T83-TR-0080 E 10228.865 T83-TR-1100
W-2100 D-1000 T83-TR-0120 N 11513.235
B.O.T EL+99.000 W-2500 D-1000 W-600 D-1000 W-1000 D-1000
B.O.T EL+99.000 B.O.T EL+99.000 B.O.T EL+99.000
T83-P-CBL-CA-256958-008
(SCALE: 1:25 mm) N 11505.578 (SCALE: 1:25 mm)
MATCHLINE E 10250.995
T83-TR-0076 THIS DRAWING
00A
11/04/21
02/18/21
ISSUED FOR CONSTRUCTION WITH HOLDS
ACA
MMT
MMT
MSU
MSU
(SCALE: 1:25 mm) B.O.T EL+98.600
G G
L L B.O.T EL+98.800
T83-DB-100 E 10229.125 REV DATE DESCRIPTION BY CHK APP
W-2120 D-580 N 11486.416
BOT EL +98.600
MATCHLINE N 11480.500 T83-DB-540
W- 18 D-2 FOR CONT. SEE DWG. W-580 D-360 0 5.0 10.0 15.0 20.0
T83-TR-5155
E 10180.401 T83-TR-5160 B.O.T EL+98.800 150 1 : 200M
W-400 D-1000 SCALE:
N 11486.350 E 10199.999 W-400 D-1000
B.O.T EL+99.000 E 10216.000
N 11490.912 B.O.T EL+99.000 N 11490.912
T83-TR-5160 REVISION VALIDATION
W-400 D-1200 T83-DB-530
B.O.T EL+98.800 W-580 D-360
BOT EL +98.800
PLAN VIEW THIS REVISION NO.00C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
EL+100.140
REV.NO. DATE REVISION DESCRIPTION
Detail A Section M-M Section L-L GENERAL REVISION 00C TANAJIB SAUDI ARABIA
(SCALE: 1:25 mm)
(SCALE: 1:25 mm) (SCALE: 1:25 mm) PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
NOTES:
PLANT
UTM
T83-DB-540 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
NORTH T83-TR-5060
GRID NORTH W-580 D-360 COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
W-400 D-1000 BOT EL +98.800
T83-DB-100 ABD 1970 DATUM, ZONE -39N.
B.O.T EL+99.000
22. W-2120 D-580 W- 2 D-1 2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º E 10206.792 E 10223.805
BOT EL +98.600 150 CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
N 11475.150 N 11473.124
W- 18 D-2
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
8
E 10199.474 E 10221.779 MATCHLINE N 11480.502 3.- ALL COORDINATES ARE IN METERS.
N 11467.832 N 11475.150
M AKKA H FOR CONT. SEE DWG. 4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
T83-P-CBL-CA-256958-005 PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
B B
D D DRAWING T80-S-UTI-CB-790879
PREVAILING 7.- UNDERGROUND CONDUIT SHALL BE PVC CONDUIT TYPE
WIND DB-120 (MINIMUM MODULUS OF ELASTICITY 500,000 PSI) PER
E 10238.044 NEMA TC 6 & 8 OR TYPE EPC-40-PVC PER NEMA TC 2.
N 11473.124
LEGEND
E 10176.962 T83-TR-5050
N 11470.001 E 10229.125 W-400 D-1000
T83-TR-0065 N 11474.414 B.O.T EL+99.000 N.10155046 NORTH
TRENCH COORDINATES
W-2000 D-1400 T83-TR-5060 E 10244.945 E. 5994416 EAST
B.O.T EL+98.600 W-400 D-1200 N 11464.055
T83-TR-0048 B.O.T EL+98.800 T83-TR-5050
CABLE TRENCH/DUCT BANK NO.
W-600 D-1000 E 10229.125 T83-DB-560 W-400 D-1200
N 11473.124 XXX-XX-XXX TYPE OF RACEWAY (SEE BELOW)
B.O.T EL+99.000 W-580 D-360 B.O.T EL+98.800
C BOT EL +98.800
W-1000 D-400 WIDTH AND DEPTH
B.O.D. EL.+98.500 ELEVATION
W- 2 D-1 * W-6 * D-2 *W= NUMBER OF CONDUIT / D= NUMBER OF LAYER
150 *150 *CONDUIT DIAMETER
T83-TR-0065
W-3300 D-1000 C * ONLY FOR DUCT BANK
B.O.T EL+99.000 TYPE OF RACEWAY
E 10245.200
T83-TR-0065 N 11460.729
XXX-XX-XXXX
W-2200 D-1400 T83-TR-5050
SEQUIENTIAL NUMBER
B.O.T EL+98.600 W-400 D-1000
A A TYPE OF RACEWAY:
E 10176.962 B.O.T EL+99.000
N 11460.212 E 10243.280 TR - (CABLE TRENCH)
N 11464.055 DB - (DUCT BANK)
SU - (STUB-UP)
MATCHLINE E 10174.043 SC - (CONDUIT WITHIN STUB-UP)
DC - (CONDUIT WITHIN DUCT BANK)
FOR CONT. SEE DWG. AC - (ABOVE GROUND CONDUIT)
UC - (UNDER GROUND CONDUIT)
T83-P-CBL-CA-256958-002
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
PLANT NUMBER
E 10199.474 ELECTRICAL ELECTRICAL
N 11448.657 CABLE TRENCH DUCT BANK / STUB-UP
T83-DB-125
T83-P-CBL-CA-256958-009
ELECTRICAL B.O.C. BOTTOM OF
MATCHLINE E 10250.995
W-2120 D-580
CONDUIT EL+XX.XXX CONDUIT
BOT EL +98.600
MATCHLINE E 10250.995
T83-P-CBL-CA-256958-003
MATCHLINE E 10174.043
FOR CONT. SEE DWG.
KEY PLAN
00C 03/25/22 ISSUED FOR CONSTRUCTION WITH HOLDS MMB MMT RRG
00B 11/04/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
T83-DC-54001 T83-DC-54002 T83-DC-56002 T83-DC-56001 ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
00C 03/25/22
ISSUED FOR CONSTRUCTION WITH HOLDS
T83-DC-12510 T83-DC-12518 T83-DC-10018 T83-DC-10010
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
T83-DC-12511 T83-DC-12517 T83-DC-10017 T83-DC-10011 10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED
T83-DC-12512 T83-DC-12516 T83-DC-10016 T83-DC-10012
T83-DC-12513 T83-DC-12515 T83-DC-10015 T83-DC-10013 SAUDI ARABIAN OIL COMPANY
T83-DC-12514 T83-DC-10014 DRAWING TYPE
NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22. 2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º
CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
3.- ALL COORDINATES ARE IN METERS.
M AKKA H
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
DRAWING T80-S-UTI-CB-790879
PREVAILING 7.- UNDERGROUND CONDUIT SHALL BE PVC CONDUIT TYPE
WIND DB-120 (MINIMUM MODULUS OF ELASTICITY 500,000 PSI) PER
MATCHLINE N 11388.002 NEMA TC 6 & 8 OR TYPE EPC-40-PVC PER NEMA TC 2.
T83-TR-5040
FOR CONT. SEE DWG. T83-P-CBL-CA-256958-006 W-400 D-1000 LEGEND
B.O.T EL+99.000
N.10155046 NORTH
T83-SC-13002 TRENCH COORDINATES
T83-SC-13001 T83-SC-13003 E. 5994416 EAST
MATCHLINE E 10250.995
T83-SC-13004 T83-SC-13006 * ONLY FOR DUCT BANK
T83-SC-13005 TYPE OF RACEWAY
XXX-XX-XXXX
MATCHLINE E 10174.043
SEQUIENTIAL NUMBER
Section A-A TYPE OF RACEWAY:
(SCALE: 1:25 mm) TR - (CABLE TRENCH)
DB - (DUCT BANK)
SU - (STUB-UP)
SC - (CONDUIT WITHIN STUB-UP)
DC - (CONDUIT WITHIN DUCT BANK)
AC - (ABOVE GROUND CONDUIT)
UC - (UNDER GROUND CONDUIT)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
PLANT NUMBER
REFERENCE DRAWINGS
POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
E 10200.121 POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
N 11341.650 Section B-B CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
T83-TR-0140 (SCALE: 1:25 mm) ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
W-700 D-1000
ELECTRICAL CABLE SCHEDULE - SUBSTATION 018 T83-P-CCS-CD-256970
B.O.T EL+99.000
T83-EDG-067 FLOOR PLAN NGLFRACTIONATION T83-R-ARC-CA-255447
T83-TR-0140
CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256956
W-500 D-1000
B.O.T EL+99.000 CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
T83-TR-0140 T83-TR-5030
STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256929
W-700 D-1000 GENERAL AREAS
W-400 D-1000
B.O.T EL+99.000 B.O.T EL+99.000 DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879
E 10183.585 E 10221.485
AREA
N 11341.650 N 11341.800
T83-TR-0140
W-500 D-1000
B.O.T EL+99.000
T83-P-CBL-CA-256958-011
MATCHLINE E 10250.995
FOR CONT. SEE DWG.
E 10200.218
N 11335.059
T83-SU-130 T83-TR-0140
W-800 D-580 W-800 D-1800
BOT EL +98.200 B.O.T EL+98.200 A A
W- 6 D-2
150
THIS DRAWING
E 10200.218 T83-TR-5020
N 11333.608 W-400 D-1000
B.O.T EL+99.000 CS-054
T83-P-CBL-CA-256958-004
MATCHLINE E 10174.043
FOR CONT. SEE DWG.
E 10245.200
N 11317.000
T83-DB-580
W-580 D-360
B BOT EL +98.800
W- 2 D-1
150
B
E 10245.000 KEY PLAN
N 11313.839
T83-TR-5030 00C 03/25/22 ISSUED FOR CONSTRUCTION WITH HOLDS MMB MMT RRG
W-400 D-1000
00B 11/04/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
B.O.T EL+99.000
00A 02/18/21 ISSUED FOR DESIGN ACA MMT MSU
T83-TR-5020 E 10245.092
W-400 D-1000 N 11316.812
B.O.T EL+99.000 E 10221.485 REV DATE DESCRIPTION BY CHK APP
N 11313.839
E 10177.835
N 11300.716
0 5.0 10.0 15.0 20.0
T83-TR-5020
W-400 D-1000 METERS
B.O.T EL+99.000
1 : 200M
E 10183.585 SCALE:
N 11310.676
REVISION VALIDATION
MATCHLINE N 11295.500
THIS REVISION NO.00C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-09003-0004-000
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
00C 03/25/22
ISSUED FOR CONSTRUCTION WITH HOLDS
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED
NOTES:
B.O.C.
PLANT E 10279.851 EL+98.800 E 10299.851
NORTH UTM
N 11563.650
1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH N 11563.650
T83-UC-5006|150 mm COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
T83-TR-5610 T83-TR-5600 ABD 1970 DATUM, ZONE -39N.
22.
W-400 D-1200 W-400 D-1200 2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º
B.O.T EL+98.800 B.O.T EL+98.800 CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
MATCHLINE N 11569.139 3.- ALL COORDINATES ARE IN METERS.
M AKKA H
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
DRAWING T80-S-UTI-CB-790879
PREVAILING T83-TR-5610 7.- UNDERGROUND CONDUIT SHALL BE PVC CONDUIT TYPE
T83-TR-5600
WIND
W-400 D-1000 DB-120 (MINIMUM MODULUS OF ELASTICITY 500,000 PSI) PER
E 10285.900 W-400 D-1000
B.O.T EL+99.000 N 11544.680 NEMA TC 6 & 8 OR TYPE EPC-40-PVC PER NEMA TC 2.
B.O.T EL+99.000
T83-TR-1080 E 10303.091 LEGEND
N 11563.650
W-600 D-1400
B.O.T EL+98.600 T83-TR-5605 N.10155046 NORTH
TRENCH COORDINATES
E 10279.200 W-400 D-1000 E. 5994416 EAST
N 11544.680 B.O.T EL+99.000
T83-TR-1080 CABLE TRENCH/DUCT BANK NO.
W-600 D-1000 E 10279.200 E 10293.250
N 11543.480 XXX-XX-XXX TYPE OF RACEWAY (SEE BELOW)
B.O.T EL+99.000 N 11553.809
E 10293.250 W-1000 D-400 WIDTH AND DEPTH
MATCHLINE E 10344.601
B.O.T EL+99.000 SEQUIENTIAL NUMBER
E 10274.716 E 10295.900 BOT EL +98.600
N 11528.087 B N 11544.680 W- 4 D-2 TYPE OF RACEWAY:
T83-TR-1097 6 TR - (CABLE TRENCH)
W-600 D-1400 DB - (DUCT BANK)
SU - (STUB-UP)
B.O.T EL+98.600 SC - (CONDUIT WITHIN STUB-UP)
E 10272.921 DC - (CONDUIT WITHIN DUCT BANK)
N 11528.087 AC - (ABOVE GROUND CONDUIT)
UC - (UNDER GROUND CONDUIT)
T83-SU-335
ACCU-01
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
W-580 D-580 PLANT NUMBER
BOT EL +98.620
OME-003
W- 4 D-2
ACCU-02 ELECTRICAL
CABLE TRENCH
ELECTRICAL
DUCT BANK / STUB-UP
6
ELECTRICAL B.O.C. BOTTOM OF
E 10272.887 CONDUIT CONDUIT
N 11526.260 A EL+XX.XXX
T83-SU-330 REFERENCE DRAWINGS
W-580 D-580
E 10281.225 POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
BOT EL +98.620 N 11528.275
W- 4 D-2
T83-TR-1097
POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
6 W-1200 D-1000 CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
E 10276.250
N 11526.260 A B.O.T EL+99.000 ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
E 10281.225 ELECTRICAL CABLE SCHEDULE - SUBSTATION 018 T83-P-CCS-CD-256970
T83-TR-1096
N 11527.065 CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 1
W-600 D-1400 T83-P-CBL-CA-256956
B.O.T EL+98.600 CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
T83-TR-1096
W-600 D-1000
B.O.T EL+99.000
T83-TR-1090
W-1800 D-1000
Detail A STREET LIGHTING LAYOUT - NGL FRACTIONATION
GENERAL AREAS
DUCT BANK, POWER TRENCH & LIGHTING - COMMOM
T83-P-CBL-CA-256929
T80-S-UTI-CB-790879
E 10311.344
B.O.T EL+99.000 N 11508.763 AREA
E 10237.250
N 11513.435 T83-TR-1070
W-3200 D-1000
T83-TR-1100
B.O.T EL+99.000
W-1000 D-1000
B.O.T EL+99.000
E 10345.050
E 10281.625 N 11514.535
N 11514.535
E 10311.344
T83-TR-5630 N 11508.468
W-400 D-1000
B.O.T EL+99.000
E 10252.420
N 11503.410
E 10307.350 THIS DRAWING
N 11501.550
E 10254.640
N 11499.565 T83-TR-5650
W-400 D-1000
B.O.T EL+99.000
TRENCH FOR STREET LIGHTING E 10307.350
N 11501.255
T83-TR-5630
W-400 D-1000
E 10341.000
B.O.T EL+99.000 N 11487.450
E 10254.640 T83-TR-5595
N 11490.912 W-400 D-1000
B.O.T EL+99.000
E 10341.000
N 11486.350 KEY PLAN
00C 03/25/22 ISSUED FOR CONSTRUCTION WITH HOLDS MMB MMT RRG
MATCHLINE N 11480.500 00B 11/04/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
METERS
(SCALE: 1:200 mm)
SCALE:
1 : 200M
REVISION VALIDATION
T83-UC-0542|100 mm
TO WELDNG
THIS REVISION NO.00C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
E 10280.208 SOCKET EL+100.140
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
N 11522.991
10-09003-0004-000
T83-SC-33002 T83-SC-33501 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
T83-SC-33001 T83-SC-33502 T83-DC-21102 T83-DC-21101 EL+99.700 (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
T83-TR-1090
C C W-1800 D-1000
B.O.T EL+99.000 REV.NO. DATE REVISION DESCRIPTION
00C 03/25/22
ISSUED FOR CONSTRUCTION WITH HOLDS
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
T83-SC-33003 T83-SC-33504 T83-DC-21104 T83-DC-21103 10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED
T83-SC-33004 T83-SC-33503
SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
Section A-A Section B-B Detail A Section C-C CABLE TRENCH LAYOUT
(SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm) NGL FRACTIONATION GENERAL AREA
NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22. 2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º
CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
3.- ALL COORDINATES ARE IN METERS.
M AKKA H
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
B.O.C. T83-TR-5550 DRAWING T80-S-UTI-CB-790879
PREVAILING EL+98.800 W-400 D-1000 7.- UNDERGROUND CONDUIT SHALL BE PVC CONDUIT TYPE
WIND
B.O.T EL+99.000
DB-120 (MINIMUM MODULUS OF ELASTICITY 500,000 PSI) PER
T83-UC-5003|150 mm
NEMA TC 6 & 8 OR TYPE EPC-40-PVC PER NEMA TC 2.
E 10283.631 E 10317.873
N 11467.306 N 11469.801 LEGEND
E 10277.505 E 10308.609
N 11475.150 N 11475.150 N.10155046 NORTH
T83-TR-5560 TRENCH COORDINATES
E 10297.505 E. 5994416 EAST
W-400 D-1200 N 11475.150
B.O.T EL+98.800 T83-TR-5550 CABLE TRENCH/DUCT BANK NO.
E 10275.786 W-400 D-1200 MATCHLINE N 11480.502
N 11475.150 B.O.T EL+98.800 XXX-XX-XXX TYPE OF RACEWAY (SEE BELOW)
FOR CONT. SEE DWG. W-1000 D-400 WIDTH AND DEPTH
T83-P-CBL-CA-256958-008 B.O.D. EL.+98.500 ELEVATION
* W-6 * D-2 *W= NUMBER OF CONDUIT / D= NUMBER OF LAYER
*150 *CONDUIT DIAMETER
MATCHLINE E 10344.601 * ONLY FOR DUCT BANK
FOR CONT. SEE DWG. TYPE OF RACEWAY
T83-P-CBL-CA-256958-013 XXX-XX-XXXX
E 10327.334
E 10266.122 SEQUIENTIAL NUMBER
N 11466.628
N 11475.150
T83-TR-1047 TYPE OF RACEWAY:
W-800 D-1000 TR - (CABLE TRENCH)
B.O.T EL+99.000 DB - (DUCT BANK)
E 10258.545 T83-TR-1045 SU - (STUB-UP)
N 11464.055 T83-TR-1046 W-700 D-1000 SC - (CONDUIT WITHIN STUB-UP)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
T83-TR-1048 PLANT NUMBER
BOT EL +98.800 W-400 D-1000 A N 11464.500 E 10324.300
W-600 D-1000
B.O.T EL+99.000 N 11466.278 ELECTRICAL ELECTRICAL
W- 2 D-1 T83-TR-1045 B.O.T EL+99.000 CABLE TRENCH DUCT BANK / STUB-UP
150 T83-TR-5565 W-700 D-1400 T83-DB-130
E 10256.945 E 10326.530
N 11464.055
A W-400 D-1000 B.O.T EL+98.600 W-800 D-580
N 11466.278 ELECTRICAL B.O.C. BOTTOM OF
BOT EL +98.600 CONDUIT CONDUIT
T83-TR-5560
B.O.T EL+99.000 FUEL E 10336.499
T83-TR-1049 EL+XX.XXX
E 10283.631 W- 6 D-2 W-600 D-1000
W-400 D-1200 N 11460.332 6 TANK N 11459.120
B.O.T EL+99.000 REFERENCE DRAWINGS
B.O.T EL+98.800 T83-TR-1049
TRENCH FOR STREET LIGHTING T83-SU-320 POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
E 10268.950 W-800 D-1500
N 11454.565 E 10324.300 B B B.O.T EL+98.500 W-800 D-580 POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
N 11455.500 C C BOT EL +99.690
T83-TR-5570 E 10336.499 CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
T83-TR-1045 W- 6 D-2
W-400 D-1000
W-700 D-1400
EDG-068 N 11456.800 ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
B.O.T EL+99.000 150
B.O.T EL+98.600 ELECTRICAL CABLE SCHEDULE - SUBSTATION 018 T83-P-CCS-CD-256970
E 10258.545
N 11454.565 FOR ADITIONAL DETAILS OF EMBEDDED T83-EDG-067 FLOOR PLAN NGLFRACTIONATION T83-R-ARC-CA-255447
T83-TR-1045 CONDUITS REFER TO ARCHITECTURE
W-700 D-1000 CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256956
DRAWING T83-R-ARC-CA-255247
B.O.T EL+99.000 CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256929
GENERAL AREAS
DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879
T83-P-CBL-CA-256958-006
T83-TR-1050
MATCHLINE E 10250.993
B.O.T EL+99.000
E 10336.526
N 11442.870
SS-018 T83-TR-1050
E 10324.900 W-1500 D-1000
N 11437.570 B.O.T EL+99.000
E 10330.475
N 11436.820
E 10324.300
N 11454.500
T83-TR-1060
FOR CONT. SEE DWG. W-2800 D-1000 THIS DRAWING
T83-P-CBL-CA-257012 B.O.T EL+99.000
MATCHLINE N 11429.235
FOR CONT. SEE DWG. T83-P-CBL-CA-256958-010
T83-TR-5570 T83-TR-1040
W-400 D-1000 W-1900 D-1000
B.O.T EL+99.000 B.O.T EL+99.000
PLAN VIEW
(SCALE: 1:200 mm)
KEY PLAN
00C 03/25/22 ISSUED FOR CONSTRUCTION WITH HOLDS MMB MMT RRG
00B 11/04/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
10-09003-0004-000
Section A-A Section B-B Section C-C Detail A Section E-E DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm) (SCALE: 1:25 mm) (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
HOLD REV.NO.
00C
DATE
03/25/22
REVISION DESCRIPTION
NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22. T83-TR-5570 T83-TR-1040 T83-TR-1060 2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º
W-400 D-1000 W-1900 D-1000 W-2800 D-1000 CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
E 10324.900
B.O.T EL+99.000 B.O.T EL+99.000 N 11437.570 B.O.T EL+99.000 VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
MATCHLINE N 11429.237 3.- ALL COORDINATES ARE IN METERS.
M AKKA H
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
FOR CONT. SEE DWG. T83-P-CBL-CA-256958-009 5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
DRAWING T80-S-UTI-CB-790879
PREVAILING
WIND
Detail C 7.- UNDERGROUND CONDUIT SHALL BE PVC CONDUIT TYPE
DB-120 (MINIMUM MODULUS OF ELASTICITY 500,000 PSI) PER
NEMA TC 6 & 8 OR TYPE EPC-40-PVC PER NEMA TC 2.
E 10330.787 LEGEND
N 11421.619
N.10155046 NORTH
E 10330.787 TRENCH COORDINATES
N 11420.666 E. 5994416 EAST
MATCHLINE E 10250.993
FOR CONT. SEE CABLE TRAY PLAN * ONLY FOR DUCT BANK
DWG. T83-P-CBL-CA-256938
MATCHLINE E 10344.601
TYPE OF RACEWAY
XXX-XX-XXXX
SEQUIENTIAL NUMBER
T83-DC-20506 T83-DC-20510 TYPE OF RACEWAY:
T83-DC-20507 T83-DC-20509 TR - (CABLE TRENCH)
T83-DC-20508 DB - (DUCT BANK)
SU - (STUB-UP)
SC - (CONDUIT WITHIN STUB-UP)
FOR CONT. SEE DWG. DC - (CONDUIT WITHIN DUCT BANK)
Section A-A T83-P-CBL-CA-257012
AC - (ABOVE GROUND CONDUIT)
UC - (UNDER GROUND CONDUIT)
(SCALE: 1:25 mm)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
PLANT NUMBER
ELECTRICAL ELECTRICAL
CABLE TRENCH DUCT BANK / STUB-UP
MATCHLINE E 10344.601
E 10268.950
N 11374.508 T83-TR-1005
T83-TR-5570 W-2500 D-1000
W-400 D-1000 B.O.T EL+99.000
B.O.T EL+99.000 E 10302.390
E 10273.680
N 11369.778
N 11369.778 E 10288.433 E 10304.890
N 11369.778 N 11367.078 T83-DB-206
T83-TR-1001 T83-TR-1005 W-1460 D-580
T83-DB-205 W-1200 D-1400 W-1500 D-1400 BOT EL +98.600
W-1240 D-580 B.O.T EL+98.600 B.O.T EL+98.600 W- 12 D-2
BOT EL +98.600 6
E 10288.033
W- 10 D-2 N 11367.078 B B THIS DRAWING
6 E 10304.890
N 11360.078
A A T83-TR-1015
E 10288.033 W-1500 D-1400
N 11357.078 B.O.T EL+98.600
T83-TR-1010 E 10304.390
W-1200 D-1400 N 11357.218
B.O.T EL+98.600 T83-TR-1015
MATCHLINE E 10250.993 T83-TR-1010 W-2500 D-1000
FOR CONT. SEE DWG. W-2200 D-1000 B.O.T EL+99.000
MATCHLINE N 11349.862
FOR CONT. SEE DWG.
E 10288.033 E 10290.183
T83-P-CBL-CA-256958-011 N 11356.278 N 11352.558 F
T83-TR-1020 KEY PLAN
W-4500 D-1000
B.O.T EL+99.000
PLAN VIEW T83-UC-0508|150 mm
E 10324.850
N 11423.140 T83-UC-0515|150 mm T83-UC-0520|150 mm 00C 03/25/22 ISSUED FOR CONSTRUCTION WITH HOLDS MMB MMT RRG
T83-UC-0523|150 mm T83-UC-0533|150 mm (SCALE: 1:200 mm) T83-UC-0509|150 mm T83-UC-0507|150 mm E 10329.589 E 10330.039
N 11420.440 00B 11/04/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
E 10302.393 E 10304.890 E 10324.630 E 10325.070 N 11420.440
N 11381.801 N 11423.140 N 11423.140 T83-UC-0514|150 mm T83-UC-0519|150 mm 00A 02/18/21 ISSUED FOR DESIGN ACA MMT MSU
N 11381.801
T83-UC-0532|150 mm T83-UC-0534|150 mm T83-UC-0510|150 mm T83-UC-0506|150 mm E 10329.589 E 10330.039
T83-UC-0522|150 mm T83-UC-0524|150 mm
E 10304.670 E 10305.110 E 10324.410 E 10325.290 N 11420.220 N 11420.220
E 10302.173 E 10302.613
N 11381.801 N 11381.801 N 11423.140 N 11423.140 T83-UC-0513|150 mm T83-UC-0518|150 mm REV DATE DESCRIPTION BY CHK APP
N 11381.801 N 11381.801
T83-UC-0531|150 mm T83-UC-0535|150 mm E 10329.589 E 10330.039
T83-UC-0521|150 mm T83-UC-0525|150 mm
E 10304.450 E 10305.330 N 11420.000 N 11420.000
E 10301.953 E 10302.833
N 11381.801 N 11381.801 T83-UC-0512|150 mm T83-UC-0517|150 mm
N 11381.801 N 11381.801
E 10329.589 E 10330.039 0 5.0 10.0 15.0 20.0
N 11419.780 N 11419.780
E E T83-UC-0511|150 mm T83-UC-0516|150 mm
C C E 10329.589 E 10330.039
METERS
N 11419.560 N 11419.560
D D SCALE:
1 : 200M
T83-UC-0528|150 mm
E 10302.393 Detail A N 11381.351
T83-UC-0538|150 mm
E 10304.890
Detail B N 11381.351
T83-UC-0503|150 mm
E 10324.850
Detail C Detail D 10-09003-0004-000
N 11381.351 (SCALE: 1:25 mm) N 11381.351 (SCALE: 1:25 mm) N 11422.550 (SCALE: 1:25 mm) (SCALE: 1:25 mm) DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
00C 03/25/22
ISSUED FOR CONSTRUCTION WITH HOLDS
JOB ORDER/EWO NO.
EL+99.700 EL+99.700 EL+99.700 EL+99.700 THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED
T83-TR-1001 T83-TR-1040
T83-TR-1005 T83-TR-1060
W-2000 D-1000 W-2500 D-1000
W-1900 D-1000
B.O.T EL+99.000
W-2800 D-1000 SAUDI ARABIAN OIL COMPANY
B.O.T EL+99.000 B.O.T EL+99.000 B.O.T EL+99.000 DRAWING TYPE
NOTES:
PLANT E 10295.580
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH N 11342.810
COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
T83-TR-1025 ABD 1970 DATUM, ZONE -39N.
22. W-1000 D-1500 2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º
B.O.T EL+98.500 T83-SU-125 CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
W-1020 D-580 E 10297.770 VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
T83-TR-1025 BOT EL +98.500 N 11341.015 3.- ALL COORDINATES ARE IN METERS.
W-3500 D-1000 W- 8 D-2 4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
M AKKA H T83-SU-110
B.O.T EL+99.000 150 5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
W-800 D-580
T83-TR-1020 E 10297.770 BOT EL +98.500
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
N 11342.810 RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
W-4500 D-1000 W- 6 D-2 MATCHLINE N 11349.864 6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
B.O.T EL+99.000 150
FOR CONT. SEE DWG. DRAWING T80-S-UTI-CB-790879
PREVAILING 7.- UNDERGROUND CONDUIT SHALL BE PVC CONDUIT TYPE
WIND T83-P-CBL-CA-256958-010 DB-120 (MINIMUM MODULUS OF ELASTICITY 500,000 PSI) PER
NEMA TC 6 & 8 OR TYPE EPC-40-PVC PER NEMA TC 2.
T83-P-CBL-CA-256958-007
MATCHLINE E 10250.993
LEGEND
MATCHLINE E 10344.601
N 11340.500
B.O.T EL+99.000
C N 11331.400 SU - (STUB-UP)
T83-TR-1035
SC - (CONDUIT WITHIN STUB-UP)
E 10258.797 W-1000 D-1500 DC - (CONDUIT WITHIN DUCT BANK)
N 11313.839 B.O.T EL+98.500 AC - (ABOVE GROUND CONDUIT)
E 10258.797 UC - (UNDER GROUND CONDUIT)
E 10294.250
N 11318.898 N 11331.400
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
PLANT NUMBER
T83-TR-5510
ELECTRICAL ELECTRICAL
W-400 D-1000 E 10287.097 CABLE TRENCH DUCT BANK / STUB-UP
B.O.T EL+99.000 N 11323.500
E 10257.001 ELECTRICAL B.O.C. BOTTOM OF
N 11313.839 CONDUIT EL+XX.XXX CONDUIT
T83-TR-5500
REFERENCE DRAWINGS
W-400 D-1200
B.O.T EL+98.800
A POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
T83-DB-725 POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
W-580 D-360 CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
BOT EL +98.800 A ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
W- 2 D-1
ELECTRICAL CABLE SCHEDULE - SUBSTATION 018 T83-P-CCS-CD-256970
150
B.O.C. T83-EDG-067 FLOOR PLAN NGLFRACTIONATION T83-R-ARC-CA-255447
E 10265.745 EL+99.400
N 11306.449 CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256956
T83-TR-5510 T83-UC-5002|150 mm
CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
W-400 D-1000 E 10258.797
N 11306.449 E 10294.132 STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256929
B.O.T EL+99.000 N 11306.449
T83-TR-5510
GENERAL AREAS
E 10297.441
W-400 D-1000 N 11300.716 DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879
B.O.T EL+99.000 AREA
T83-TR-5510
W-400 D-1200
B.O.T EL+98.800 T83-TR-5530
W-400 D-1000
E 10265.745
N 11302.500 B.O.T EL+99.000
T83-DB-720 B B
W-580 D-360
BOT EL +98.800
W- 2 D-1
150 MATCHLINE N 11295.500
FOR CONT. SEE DWG.
T83-TR-5520 T83-TR-5520 T83-TR-5530
W-400 D-1000 W-400 D-1200 W-400 D-1200 T83-P-CBL-CA-256957-001
B.O.T EL+99.000 B.O.T EL+98.800 B.O.T EL+98.800 THIS DRAWING
E 10282.880 E 10292.880
N 11306.449 N 11306.449
PLAN VIEW
(SCALE: 1:200 mm)
KEY PLAN
00C 03/25/22 ISSUED FOR CONSTRUCTION WITH HOLDS MMB MMT RRG
00B 11/04/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
T83-SC-11001 00A 02/18/21 ISSUED FOR DESIGN ACA MMT MSU
T83-SC-11502 T83-SC-11503 T83-SC-12502 T83-SC-12503 T83-SC-11002
T83-DC-72502 T83-DC-72501 T83-DC-59001 T83-DC-59002 T83-SC-11501 T83-SC-11504 T83-SC-12501 T83-SC-12504 T83-SC-11003
REV DATE DESCRIPTION BY CHK APP
METERS
SCALE:
1 : 200M
T83-SC-11505 T83-SC-11508 T83-SC-12505 T83-SC-12508 T83-SC-11006
T83-SC-11506 T83-SC-11507 T83-SC-12506 T83-SC-12507 T83-SC-11005
T83-SC-11004 REVISION VALIDATION
00C 03/25/22
ISSUED FOR CONSTRUCTION WITH HOLDS
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED
NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
MATCHLINE N 11569.139 ABD 1970 DATUM, ZONE -39N.
22. 2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º
CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
E 10396.683
N 11563.650
3.- ALL COORDINATES ARE IN METERS.
M AKKA H
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
T83-TR-5600 5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
W-400 D-1000 PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
T83-TR-5600
B.O.T EL+99.000 RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
W-400 D-1000 E 10408.849
6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
N 11556.626 DRAWING T80-S-UTI-CB-790879
B.O.T EL+99.000
PREVAILING E 10411.999
7.- UNDERGROUND CONDUIT SHALL BE PVC CONDUIT TYPE
WIND
N 11551.540 DB-120 (MINIMUM MODULUS OF ELASTICITY 500,000 PSI) PER
NEMA TC 6 & 8 OR TYPE EPC-40-PVC PER NEMA TC 2.
T83-TR-5600
W-400 D-1200 LEGEND
B.O.T EL+98.800
T83-DB-510 N.10155046 NORTH
TRENCH COORDINATES
W-580 D-360 E. 5994416 EAST
C
MATCHLINE E 10344.599
B.O.T EL+99.000 * ONLY FOR DUCT BANK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
PLANT NUMBER
T72-P-CBL-CA-256954-013
ELECTRICAL ELECTRICAL
MATCHLINE E 10420.995
CABLE TRENCH DUCT BANK / STUB-UP
REFERENCE DRAWINGS
POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
ELECTRICAL CABLE SCHEDULE - SUBSTATION 018 T83-P-CCS-CD-256970
T83-EDG-067 FLOOR PLAN NGLFRACTIONATION T83-R-ARC-CA-255447
E 10347.260
N 11514.535 CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256956
CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256929
T83-TR-1070 GENERAL AREAS
W-3200 D-1000 DUCT BANK, POWER TRENCH & LIGHTING - COMMOM T80-S-UTI-CB-790879
B.O.T EL+99.000 T83-TR-5640 AREA
W-400 D-1000
B.O.T EL+99.000
E 10397.506
N 11486.300
E 10404.090
N 11490.101
T83-TR-5580
W-400 D-1000
B.O.T EL+99.000
THIS DRAWING
E 10353.225
N 11486.300
E 10415.750
T83-TR-5640 N 11496.833
W-400 D-1000
B.O.T EL+99.000
E 10351.233
N 11487.450
E 10350.939
N 11487.450
E 10342.100
N 11487.450
T83-TR-5595 T83-TR-5580
W-400 D-1000 W-400 D-1200
T83-TR-1070
B.O.T EL+99.000 B.O.T EL+98.800
W-2200 D-1400
B.O.T EL+98.600 E 10404.090
N 11487.500
E 10347.260 B B
N 11486.000 A A T83-DB-550
T83-DB-200 W-580 D-360
KEY PLAN
W-2120 D-580 BOT EL +98.800
BOT EL +98.600
MATCHLINE N 11480.500 W- 2 D-1
W- 18 D-2 FOR CONT. SEE DWG. T83-P-CBL-CA-256958-013 150 00C 03/25/22 ISSUED FOR CONSTRUCTION WITH HOLDS MMB MMT RRG
6 00B 11/04/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
PLAN VIEW
REV DATE DESCRIPTION BY CHK APP
(SCALE: 1:200 mm)
METERS
SCALE:
1 : 200M
T83-DC-20005
T83-DC-20004 T83-DC-20006
T83-DC-20003 T83-DC-20007
REVISION VALIDATION
T83-DC-20002 T83-DC-20008
T83-DC-20001 T83-DC-20009 T83-DC-55001 T83-DC-55002 T83-DC-51002 T83-DC-51001 THIS REVISION NO.00C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-09003-0004-000
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22. 2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º
CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
3.- ALL COORDINATES ARE IN METERS.
M AKKA H
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
DRAWING T80-S-UTI-CB-790879
PREVAILING 7.- UNDERGROUND CONDUIT SHALL BE PVC CONDUIT TYPE
WIND T83-DB-200 E 10398.620 DB-120 (MINIMUM MODULUS OF ELASTICITY 500,000 PSI) PER
W-2120 D-580 N 11474.700
NEMA TC 6 & 8 OR TYPE EPC-40-PVC PER NEMA TC 2.
BOT EL +98.600 T83-TR-5540 LEGEND
T83-DC-22504 T83-DC-22505 W- 18 D-2 W-400 D-1000
T83-DC-22503 T83-DC-22506 MATCHLINE N 11480.502
6 B.O.T EL+99.000
T83-DC-22502 T83-DC-22507 FOR CONT. SEE DWG. N.10155046 NORTH
T83-DC-22501 T83-DC-22508 TRENCH COORDINATES
E. 5994416 EAST
T83-P-CBL-CA-256958-012
T83-DB-550
W-580 D-360
CABLE TRENCH/DUCT BANK NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
PLANT NUMBER
T83-TR-1065
ELECTRICAL ELECTRICAL
W-2000 D-1400 CABLE TRENCH DUCT BANK / STUB-UP
B.O.T EL+98.600
E 10347.260 ELECTRICAL B.O.C. BOTTOM OF
N 11460.211 CONDUIT EL+XX.XXX CONDUIT
T83-DC-20005
T83-DC-20004 T83-DC-20006 REFERENCE DRAWINGS
T83-DB-225
T83-DC-20003 T83-DC-20007
W-1900 D-580 POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
T83-DC-20002 T83-DC-20008
BOT EL +98.600
T83-DC-20001 T83-DC-20009 POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
W- 16 D-2
150
CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
E 10370.016
ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
N 11448.699 ELECTRICAL CABLE SCHEDULE - SUBSTATION 018 T83-P-CCS-CD-256970
T83-EDG-067 FLOOR PLAN NGLFRACTIONATION T83-R-ARC-CA-255447
MATCHLINE E 10344.599 CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256956
T83-DC-20010 T83-DC-20018 A A CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
T83-DC-20011 T83-DC-20017 FOR CONT. SEE DWG.
STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256929
T83-DC-20012 T83-DC-20016 T83-P-CBL-CA-256958-009 GENERAL AREAS
T83-DC-20013 T83-DC-20015
DUCT BANK, POWER TRENCH & LIGHTING - COMMOM
MATCHLINE E 10420.995
T83-DC-20014 T80-S-UTI-CB-790879
T83-TR-1060 AREA
W-1900 D-1400
Section B-B B.O.T EL+98.600
E 10347.260
(SCALE: 1:25 mm) N 11440.211
T83-TR-1060
W-2800 D-1000 E 10347.260
B.O.T EL+99.000 N 11438.092
E 10351.073
N 11440.208
T83-TR-5540
W-400 D-1000
B.O.T EL+99.000 THIS DRAWING
E 10351.395
N 11440.530
E 10361.847
T83-DC-55001 T83-DC-55002 N 11440.530
FOR CONT. SEE DWG. T83-P-CBL-CA-256958-010
Section C-C
MATCHLINE E 10344.599
KEY PLAN
00C 03/25/22 ISSUED FOR CONSTRUCTION WITH HOLDS MMB MMT RRG
00B 11/04/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
METERS
SCALE:
1 : 200M
REVISION VALIDATION
10-09003-0004-000
MATCHLINE N 11388.000 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
FOR CONT. SEE DWG. T83-P-CBL-CA-256958-014 ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
T83-TR-5530
W-400 D-1000
00C
DATE
03/25/22
REVISION DESCRIPTION
NOTES:
PLANT
NORTH UTM 1.- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM
GRID NORTH COORDINATES E.267448.465 N.3077346.084 BASED ON AIN AL
ABD 1970 DATUM, ZONE -39N.
22. 2.- H.P.P. (HIGH POINT PAVEMENT) ELEVATION 100.000
5º
CORRESPONDS TO +22.05 M BASED ON SAUDI ARAMCO
VERTICAL DATUM OF 1978 (SAVD78), 1994 ADJUSTMENT.
3.- ALL COORDINATES ARE IN METERS.
M AKKA H
4.- ALL DIMENSION AND ELEVATIONS ARE IN MILLIMETERS.
5.- SAND TO BE USED TO FILL THE TRENCH SHALL BE CLEAN,
PROPERLY COMPACTED AND WITH A SUITABLE THERMAL
RESISTIVITY TO FULFILL 1.2 k-m/W (MAXIMUM)
6.- FOR ADDITIONAL DETAILS OF DUCT BANKS REFER TO CIVIL
DRAWING T80-S-UTI-CB-790879
PREVAILING 7.- UNDERGROUND CONDUIT SHALL BE PVC CONDUIT TYPE
WIND DB-120 (MINIMUM MODULUS OF ELASTICITY 500,000 PSI) PER
NEMA TC 6 & 8 OR TYPE EPC-40-PVC PER NEMA TC 2.
T83-TR-5530 LEGEND
W-400 D-1000
B.O.T EL+99.000
MATCHLINE N 11388.002 N.10155046 NORTH
TRENCH COORDINATES
E. 5994416 EAST
FOR CONT. SEE DWG. T83-P-CBL-CA-256958-013
CABLE TRENCH/DUCT BANK NO.
TYPE OF RACEWAY
XXX-XX-XXXX
SEQUIENTIAL NUMBER
MATCHLINE E 10344.599
TYPE OF RACEWAY:
TR - (CABLE TRENCH)
DB - (DUCT BANK)
SU - (STUB-UP)
SC - (CONDUIT WITHIN STUB-UP)
DC - (CONDUIT WITHIN DUCT BANK)
AC - (ABOVE GROUND CONDUIT)
UC - (UNDER GROUND CONDUIT)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
PLANT NUMBER
ELECTRICAL ELECTRICAL
CABLE TRENCH DUCT BANK / STUB-UP
REFERENCE DRAWINGS
POWER TYPICAL INSTALLATION DETAILS T80-P-EDT-CA-792479
POWER PLAN - NGL FRACTIONATION GENERAL AREA T83-P-EPD-CA-256984
CABLE TRENCH LAYOUT- KEY PLAN PACKAGE 11 T80-P-CBL-CA-258250
ELECTRICAL CABLE SCHEDULE - SUBSTATION 017 T83-P-CCS-CD-256969
ELECTRICAL CABLE SCHEDULE - SUBSTATION 018 T83-P-CCS-CD-256970
T83-EDG-067 FLOOR PLAN NGLFRACTIONATION T83-R-ARC-CA-255447
CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 1 T83-P-CBL-CA-256956
CABLE TRENCH LAYOUT NGL FRACTIONATION TRAIN 2 T83-P-CBL-CA-256957
STREET LIGHTING LAYOUT - NGL FRACTIONATION T83-P-CBL-CA-256929
GENERAL AREAS
DUCT BANK, POWER TRENCH & LIGHTING - COMMOM
MATCHLINE E 10420.995
T80-S-UTI-CB-790879
AREA
FOR CONT. SEE DWG. T83-P-CBL-CA-256958-011
THIS DRAWING
MATCHLINE E 10344.599
KEY PLAN
00C 03/25/22 ISSUED FOR CONSTRUCTION WITH HOLDS MMB MMT RRG
E 10415.750 00B 11/04/21 ISSUED FOR CONSTRUCTION WITH HOLDS ACA MMT MSU
N 11311.378
00A 02/18/21 ISSUED FOR DESIGN ACA MMT MSU
T83-TR-5530
W-400 D-1000 0 5.0 10.0 15.0 20.0
B.O.T EL+99.000
METERS
SCALE:
1 : 200M
E 10405.088
T83-TR-5530 N 11300.716
W-400 D-1000
B.O.T EL+99.000 REVISION VALIDATION
10-09003-0004-000
MATCHLINE N 11295.500 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
00C 03/25/22
ISSUED FOR CONSTRUCTION WITH HOLDS
(SCALE: 1:200 mm)
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED