Contract 2
Region of Peel, Ontario Canada
Andrew G. Cushing, P.Eng.
Andrew.Cushing@arup.com
• Construction of new sewer along Erin Mills Parkway to twin existing trunk sewer
• Starts at NW corner Erin Mills & Burnhamthorpe Rd., south under Erin Mills
• Turns east under Lincoln Green Way (and Close)
• Connects to existing West Trunk Sewer at east side of Loyalist Creek
• CC2: 3800m length of 3m (ID) tunneling – 80% Rock, 20% Soft Ground
• Each of two drives (two TBMs) had known Soft Ground → PCTL Required
• Known buried valley segment comprised primarily of sand and clayey silt to silty clay
(Source: Wu, L. et al. (2018). The Sustainability of Concrete in Sewer Tunnel—A Narrative Review
of Acid Corrosion in the City of Edmonton, Canada, Sustainability, 24 p.)
(Source: Wu, L. et al. (2018). The Sustainability of Concrete in Sewer Tunnel—A Narrative Review
of Acid Corrosion in the City of Edmonton, Canada, Sustainability, 24 p.)
(Source: Wu, L. et al. (2018). The Sustainability of Concrete in Sewer Tunnel—A Narrative Review
of Acid Corrosion in the City of Edmonton, Canada, Sustainability, 24 p.)
(Source: Wu, L. et al. (2018). The Sustainability of Concrete in Sewer Tunnel—A Narrative Review
of Acid Corrosion in the City of Edmonton, Canada, Sustainability, 24 p.)
• Pozzolans: i.e., granulated blast furnace slag, silica fume, low calcium fly ash, etc.
- Consume calcium hydrate Ca(OH)2, which is believed to be the primary reason for the
poor acid resistance of plain concrete
- Act to reduce the porosity of concrete (reduced penetration of aggressive ions)
• GeoPolymer Concrete
- Complete replacement of Portland cement component with Pozzolans (as above) and
proprietary geopolymer binder system
- Hardened product is an aluminosilicate
(Source: Wu, L. et al. (2018). The Sustainability of Concrete in Sewer Tunnel—A Narrative Review
of Acid Corrosion in the City of Edmonton, Canada, Sustainability, 24 p.)
11 Twinning of West Trunk Sewer CC No. 2
Improvements in Concrete Mix Design to Resist MIC
• Biocides: i.e., Conshield®
- Highly charged cationic polymer that kills the gram-negative SOB Thiobacillus on a
concrete surface.
- Inhibits the conversion of H2S into Sulfuric Acid, and hence inhibits MIC.
- However, the cationic polymer is consumptive over time, and the SOB may finally
colonize the concrete surface when it is depleted.
(Source: Hurt, J. and Hart, J. (2011) – Chapter 3 Precast Concrete Segmental Linings in Concrete for
Underground Structures, Society for Mining, Metallurgy, and Exploration, p. 48.)
EPDM gasket
integrated in the
frame
HDPE liner 2 to 5
mm thick with
anchor studs
5 mm
2.5 mm
PDCPD
Plastic EPDM
Gasket
AGRU SureGrip®
HDPE Liner
Test of the
bonding
between
HDPE and
PDCPE
Log. (Horizontal)
1.0
Log. (Vertical)
0.8
0.6
0.4
0.2
0.0
0.001 0.01 0.1 1 10
Stress (MPa)
Time Dependent Deformation (TDD) Test data by Prof. K.Y. Lo (University of Western Ontario)
Highest GWT +145.5 (GDR) +94 (GBR) +131 (GBR) +118 (GDR) +108
(Interpolated)
Lowest GWT (3.5m below 142 90.5 127.5 114.5 104.5
high)
Top of Rock (Drill Log) +98.41 Below the +129.55 +130 +92.6
tunnel
Springline (3.4m- O.D.) +126.7 +91.7 +93.2 +123.5 +91.8
GSI 30 80 60
mi 6(+-)2 for Shale, 9(+-)3 for Dolomite
Ei = 250 MPa
Ei = 50 MPa
(Source: Hurt, J., et al. (2017) Innovations on West Trunk Sewer Contract 2, RETC, pp. 989-998.)
(Source: Hurt, J., et al. (2017) Innovations on West Trunk Sewer Contract 2, RETC, pp. 989-998.)
4000
Hoop Thrust (kN/m)
3000
2000
1000
0
0 20 40 60 80 100 120 140 160