RD 09 N
C20
GENERAL NOTES :
3000
3000
1. THIS DRAWING IS NOT TO BE SCALED.
2. ALL DIM. ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS.
3. SHORING SYSTEM IS TEMPORARY SOLDIER BEAM AND LAGGING BY RC PANELS.
4. SHORING DESIGN IS BASED ON SOIL REPORT REF NO:AS/GI19/404 , REV-0 DATED
(01-10-2019) RECEIVED FROM GEOTECH FOR SOIL INVESTIGATION LABORATORY.
150 GROUND LEVEL
150 GROUND LEVEL
5. SHORING DRAWING IS BASED ON EXCAVATION LAYOUT REV-0 DATED (28-10-2022)
RECEIVED FROM MAIN CONTRACTOR.
6. PRE-CAST CONCRETE PANELS - CONCRETE GRADE 25 MPA FOR REINFORCEMENT :
-0.81 m -0.81 m Fy = 460 N/mm2.
7. GRADE OF STEEL BEAM MEMBER AND SHEET PILE: Fy =355N/mm2.
SOIL PROFILE SOIL PROFILE 8. PRE EXCAVATION TO BE CARRIED OUT THE EXISTING GROUND LEVEL TO REACH THE
50 MEDIUM DENSE SAND 50 MEDIUM DENSE SAND
SITE TILL LEVEL -0.81m BEFORE INSTALLATION OF SHORING BEAMS.
4500
5000
01 17/01/2023 ISSUED FOR APPROVAL
9000
OWNER :
Ɣ=19 KN/m³ MAX EXCAVATION Ɣ=19 KN/m³
LEVEL -5.81m QADHEEB HAMAD SAIF AL AWANI
C=100 KN/m2 C=100 KN/m2
PM :
CONSULTANT :
Y Y Y Y
MAIN CONTRACTOR :
SECTION (1-1) SECTION (2-2)
SCALE 1:50 SCALE 1:50
PROJECT NAME :
RESIDENTIAL BUILDING
ZONE :
MADINAT AL RIYAD, ABU DHABI, UAE
SECTOR NO : PLOT NO :
RD 09 C20
PROJECT DESCRIPTION :
OR Equivalent
T10 @ 200 mm
1950
B B 9.9
1000
100mm THK.
307.9
PRECAST PANEL
50
15.4
PLOT LIMIT Drawing Status :
T10 @ 200 mm
50mm THK. SHOP DRAWINGS
BASEMENT LIMIT TOLERANCE
MAIN REINFORCEMENT Drawing No : Revision :
A 150mm THK. INEX-2207-C20-SD-STR-051 02
100
A APPROVED.
-Use steel rebars form certified factories in Abu Dhabi. C RESUBMIT FOR APPROVAL.
D REJECTED.