You are on page 1of 4

DRAWING LIMIT

FOR CONT. REFER DWG.NO. 17051790-D-M-2140 SHT.02 OF 04


DRAWING LIMIT

UGC UGC

DRAWING LIMIT
PIPELINE ROUTE LAYOUT FOR 4"-FG-008A FROM MF/C3 TO MF/C1
(CHAINAGE: 0+000 TO 1+300)

KEY PLAN
(SCALE 1:40000)

0 50 100 150 200 250m

GRAPHIC SCALE 1:2500

FOR APPROVAL

A ISSUED FOR APPROVAL SENTHIL NR/NK 08.10.18

DRAWN CHECKED CHECKED APPRD


REV AMENDMENTS (GS) (GS) (KCCEC) (KOC) DATE

CONTRACTOR REVISION
KOC APPROVALS
DESIGNATION - GROUP / TEAM NAME SIGNATURE DATE

CLIENT:

MAIN CONTRACTOR:

SUB- CONTRACTOR:

P.O.Box 46551, Fahaheel-64016, Kuwait.


DRAWN SENTHIL CHECKED (GS) NK/RK CHECKED (KCCEC)

APPROVED DATE 08.10.2018 SCALE AS SHOWN

PROJECT TITLE:
UPGRADATION OF GAS & CONDENSATE NETWORK
AT SOUTH KUWAIT
PIPELINE PROFILE DRAWING FOR 4"-FG-008A FROM MF/C3 TO MF/C1
(CHAINAGE: 0+000 TO 1+300) DRAWING TITLE:
SOUTH KUWAIT
PIPELINE PROFILE DRAWINGS FOR
REF. DWGS NO. REFERENCE DRAWINGS TITLE REF. DWGS NO. REFERENCE DRAWINGS TITLE REV AMENDMENTS DRAWN CHECKED APPR'D DATE
REV AMENDMENTS DRAWN CHECKED APPR'D DATE
4"-FG-008A FROM MF/C3 TO MF/C1
(CHAINAGE: 0+000 TO 1+300)

PROJ. No. DRAWING NUMBER


CONTRACTOR DRG. No. REV. KOC DRG. No. REV.
17051790
SHEET 01 OF 04 A SHEET - OF -
-
A1
DRAWING LIMIT

FOR CONT. REFER DWG.NO. 17051790-D-M-2140 SHT.01 OF 04

FOR CONT. REFER DWG.NO. 17051790-D-M-2140 SHT.03 OF 04


UGC UGC

DRAWING LIMIT
PIPELINE ROUTE LAYOUT FOR 4"-FG-008A FROM MF/C3 TO MF/C1
(CHAINAGE: 1+300 TO 2+600)

KEY PLAN
(SCALE 1:40000)

0 50 100 150 200 250m

GRAPHIC SCALE 1:2500

FOR APPROVAL

A ISSUED FOR APPROVAL SENTHIL NR/NK 08.10.18

DRAWN CHECKED CHECKED APPRD


REV AMENDMENTS (GS) (GS) (KCCEC) (KOC) DATE

CONTRACTOR REVISION
KOC APPROVALS
DESIGNATION - GROUP / TEAM NAME SIGNATURE DATE

CLIENT:

MAIN CONTRACTOR:

SUB- CONTRACTOR:

P.O.Box 46551, Fahaheel-64016, Kuwait.


DRAWN SENTHIL CHECKED (GS) NK/RK CHECKED (KCCEC)

APPROVED DATE 08.10.2018 SCALE AS SHOWN

PROJECT TITLE:
UPGRADATION OF GAS & CONDENSATE NETWORK
PIPELINE PROFILE DRAWING FOR 4"-FG-008A FROM MF/C3 TO MF/C1 AT SOUTH KUWAIT
(CHAINAGE: 1+300 TO 2+600) DRAWING TITLE:
SOUTH KUWAIT
PIPELINE PROFILE DRAWINGS FOR
REF. DWGS NO. REFERENCE DRAWINGS TITLE REF. DWGS NO. REFERENCE DRAWINGS TITLE REV AMENDMENTS DRAWN CHECKED APPR'D DATE
REV AMENDMENTS DRAWN CHECKED APPR'D DATE
4"-FG-008A FROM MF/C3 TO MF/C1
(CHAINAGE: 1+300 TO 2+600)

PROJ. No. DRAWING NUMBER


CONTRACTOR DRG. No. REV. KOC DRG. No. REV.
17051790
SHEET 02 OF 04 A SHEET - OF -
-
A1
DRAWING LIMIT

FOR CONT. REFER DWG.NO. 17051790-D-M-2140 SHT.02 OF 04

FOR CONT. REFER DWG.NO. 17051790-D-M-2140 SHT.04 OF 04


UGC UGC

DRAWING LIMIT
PIPELINE ROUTE LAYOUT FOR 4"-FG-008A FROM MF/C3 TO MF/C1
(CHAINAGE: 2+600 TO 3+900)

KEY PLAN
(SCALE 1:40000)

0 50 100 150 200 250m

GRAPHIC SCALE 1:2500

FOR APPROVAL

A ISSUED FOR APPROVAL SENTHIL NR/NK 08.10.18

DRAWN CHECKED CHECKED APPRD


REV AMENDMENTS (GS) (GS) (KCCEC) (KOC) DATE

CONTRACTOR REVISION
KOC APPROVALS
DESIGNATION - GROUP / TEAM NAME SIGNATURE DATE

CLIENT:

MAIN CONTRACTOR:

SUB- CONTRACTOR:

P.O.Box 46551, Fahaheel-64016, Kuwait.


DRAWN SENTHIL CHECKED (GS) NK/RK CHECKED (KCCEC)

APPROVED DATE 08.10.2018 SCALE AS SHOWN

PROJECT TITLE:
UPGRADATION OF GAS & CONDENSATE NETWORK
PIPELINE PROFILE DRAWING FOR 4"-FG-008A FROM MF/C3 TO MF/C1 AT SOUTH KUWAIT
(CHAINAGE: 2+600 TO 3+900) DRAWING TITLE:
SOUTH KUWAIT
PIPELINE PROFILE DRAWINGS FOR
REF. DWGS NO. REFERENCE DRAWINGS TITLE REF. DWGS NO. REFERENCE DRAWINGS TITLE REV AMENDMENTS DRAWN CHECKED APPR'D DATE
REV AMENDMENTS DRAWN CHECKED APPR'D DATE
4"-FG-008A FROM MF/C3 TO MF/C1
(CHAINAGE: 2+600 TO 3+900)

PROJ. No. DRAWING NUMBER


CONTRACTOR DRG. No. REV. KOC DRG. No. REV.
17051790
SHEET 03 OF 04 A SHEET - OF -
-
A1
DRAWING LIMIT

FOR CONT. REFER DWG.NO. 17051790-D-M-2140 SHT.03 OF 04

UGC UGC

DRAWING LIMIT
DRAWING LIMIT
PIPELINE ROUTE LAYOUT FOR 4"-FG-008A FROM MF/C3 TO MF/C1
(CHAINAGE: 3+900 TO 5+117)

KEY PLAN
(SCALE 1:40000)

0 50 100 150 200 250m

GRAPHIC SCALE 1:2500

FOR APPROVAL

A ISSUED FOR APPROVAL SENTHIL NR/NK 08.10.18

DRAWN CHECKED CHECKED APPRD


REV AMENDMENTS (GS) (GS) (KCCEC) (KOC) DATE

CONTRACTOR REVISION
KOC APPROVALS
DESIGNATION - GROUP / TEAM NAME SIGNATURE DATE

CLIENT:

MAIN CONTRACTOR:

SUB- CONTRACTOR:

P.O.Box 46551, Fahaheel-64016, Kuwait.


DRAWN SENTHIL CHECKED (GS) NK/RK CHECKED (KCCEC)

APPROVED DATE 08.10.2018 SCALE AS SHOWN

PROJECT TITLE:
UPGRADATION OF GAS & CONDENSATE NETWORK
PIPELINE PROFILE DRAWING FOR 4"-FG-008A FROM MF/C3 TO MF/C1 AT SOUTH KUWAIT
(CHAINAGE: 3+900 TO 5+117) DRAWING TITLE:
SOUTH KUWAIT
PIPELINE PROFILE DRAWINGS FOR
REF. DWGS NO. REFERENCE DRAWINGS TITLE REF. DWGS NO. REFERENCE DRAWINGS TITLE REV AMENDMENTS DRAWN CHECKED APPR'D DATE
REV AMENDMENTS DRAWN CHECKED APPR'D DATE
4"-FG-008A FROM MF/C3 TO MF/C1
(CHAINAGE: 3+900 TO 5+117)

PROJ. No. DRAWING NUMBER


CONTRACTOR DRG. No. REV. KOC DRG. No. REV.
17051790
SHEET 04 OF 04 A SHEET - OF -
-
A1

You might also like