You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

OFFICE OF THE BUILDING OFFICIAL


A B C D E CITY ENGINEERING OFFICE

16000 RECOMMENDING APPROVAL

5900 2100 4000 4000

1 HEAD,STRUCTURAL SECTION DATE

APPROVED:

BUILDING OFFICIAL DATE

C1-F1 C1-F2 C1-F1 C1-F1


5925

C1-F1 C1-F2 C1-F1 C1-F1

2
1 FOUNDATION PLAN
SCALE: 1:100
S-1A

3 ISOMETRIC VIEW
SCALE: NTS
S-1A

fokbnni
A B C D E
16000
5900 2100 4000 4000

1 W 410X100 W 410X100 W 410X100 W 410X100


FOOTING F1 FOOTING F2
F'c = 3000 PSI F'c = 3000 PSI
Fy = 60000 PSI Fy = 60000 PSI
Fyv= 33000 PSI Fyv= 33000 PSI
THICKNESS = 550MM THICKNESS = 550MM
2200 4300
W 610X125

W 610X125

W 610X125
W 410X100

W 410X100

W 610X125

W 410X100
5925

S1 S1 S1 S1 S1

17PCS- 16MMØ BARS

33PCS- 16MMØ BARS


1400

1400
10PCS- 16MMØ BARS 10PCS- 16MMØ BARS
fokbnni

2 W 410X100 W 410X100 W 410X100 W 410X100

2 SECOND FLOOR FRAMING PLAN


SCALE: 1:100
S-1A
FOOTING DETAIL
fokbnni

4
SCALE: 1:50
S-1A

FROM THE OFFICE OF: REG. CERT. NO.: SEAL PROJECT TITLE: CLIENT SHEET CONTENTS: PREPARED BY: ALEXANDRIA LONGOS,CE SHEET NO.:

MACTAN ROCK INDUSTRIES, INC. DATE:


-FOUNDATION PLAN
-SECOND FLOOR FRAMING PLAN
DATE: FEBRUARY 09/2020
Manufacturer of Water Treatment Chemicals & Equipment PROPOSED 4500 CMD WATER TREATMENT THRU -ISOMETRIC VIEW
PTR NO.:
SOLAIRE RESORT & CASINO -FOOTING DETAIL CHECKED BY: IOVANNI E. TOMABANG

S-1A
Factory Address: Suba Masulog, Basak, Lapu - Lapu City - Cebu
Main Office: 3rd Flr., FCB Building Alang-Alang Mandaue City - Cebu SWRO WATER SYSTEM DATE:
CIVIL ENGINEER
e-mail: mactan_rock@hotmail.com or sales@chemrock.com DATE:
NOTED BY: ANTONIO P. TOMPAR,PME
Tel. No.: (032) 496-8100, 238-4354
Fax. No.: (032) 414-1483 ADDRESS: TIN.: LOCATION: MANILA ADDRESS: MANILA DATE:

You might also like