You are on page 1of 3

REPUBLIC OF THE PHILIPPINES

OFFICE OF THE BUILDING OFFICIAL


MEPZ 1, LAPU-LAPU CITY

RECOMMENDING ISSUANCE:

HEAD SECTION DATE

APPROVED:

THIS SITE
BUILDING OFFICIAL DATE

E VACINITY MAP
1a 6 SCALE: NTS

MDP1

MDP2 (KAIZO) 1000AMPS

E LOAD SCHEDULE COMPUTATION


1b 5 SCALE: NTS

PROJECT TITLE : APPROVED : SHEET CONTENTS : REPUBLIC ACT 9266(SEC 20)5 SHEET
SEAL REG. NO. :

VALID UNTIL :

N.E.G. CONSTRUCTION SERVICES


KENKO TOKINA SLIK CORP., BUILDING 1 MR. HIROKAZU YAMAGUCHI
VICE PRESIDENT AS SHOWN
EE-1
N.E.G.
CONSTRUCTION SERVICES
PROFESSIONAL ELECTRICAL ENGINEER
PTR NO. :

DATE :
ELECTRICAL SYSTEM AS-BUILT PROJECT OWNER

1 OF 5
LOCATION: TIN : ADDRESS : KENKO TOKINA SLIK CORPORATION, MEPZ 1,
PROJECT LOCATION : KENKO TOKINA SLIK CORP., MEPZ 1, BRGY. IBO LAPU-LAPU CITY BRGY. IBO LAPU-LAPU CITY DRAFTED BY : REXVHILLE QUIJANO REV.DATE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
MEPZ 1, LAPU-LAPU CITY

RECOMMENDING ISSUANCE:

HEAD SECTION DATE

APPROVED:

BUILDING OFFICIAL DATE

PBO7/C10

PB14/C1 PB14/C2

WATER SUPPLY WATER SUPPLY


SYSTEM CANTEEN SYSTEM CANTEEN
FP JP PBO7/C10
PB11
10.0HP 3.0HP PB11/C1
PBO7/C10

COMP.1
15HP PB10

PBO3/C9 PB08/C9
PBO9/C3
WAREHOUSE 2 CLINIC WAREHOUSE 2
CLINIC
FEMALE CR

PB09
WASHING AREA WASHING AREA PB09/C2 PB08/C9

WAREHOUSE WAREHOUSE CR
PBO9/C3 MALE CR
PENTAX PENTAX
KAIZO
AREA AREA
INSPECTION PBO6/C4
PBO6/C2 PBO6/C2 PBO8/C4 KAIZO
INSPECTION
PBO6/C2 PB03/C16

PB06
FCU12 FCU9 PBO6/C2 PBO8/C1 FCU4 PBO3/C13 PBO3/C12 PB12/C2
PBO8/C3
5.0HP MDP2/C5 2.0HP PB12/C1 INTERNAL 1.5HP INTERNAL
FCU13 ASSY ASSY PB06/C1
FCU8
0.6HP
1.5HP
PB03/C15
LENS ASSY PBO3/C9 LENS ASSY
PBO8/C2

PBO3/C11
FCU3 PBO8/C3
PBO8/C1
1.5HP

PB10/C1 PBO4/C3
PBO4/C2 PB08

PBO3/C5
FCU11 QA ROOM QA ROOM
CONFERENCE
WAREHOUSE 0.75HP WAREHOUSE PBO7/C3
ROOM CONFERENCE
PBO7/C3
PB04 PBO7/C6
ROOM
PBO7/C3
MDP2/C8 FCU2
1.5HP
PB03/C14 FINALE
PB05

FCU7 PBO3/C2
INSPECTION PBO5/C2
PBO4/C1 BODY ASSY 5.0HP BODY ASSY
MDP2/C7 FINALE PBO5/C2
PBO3/C4
PBO7/C1 INSPECTION
FCU10 PBO5/C5

1.5HP FCU6
MDP2 8.0HP FCU1
MDP2/C6 OFFICE 1.5HP OFFICE PBO7/C3

RECEIVING RECEIVING PBO3/C1


PBO3/C11
CENIMA ASSY PBO3/C3
PBO5/C2 CENIMA ASSY
AREA FCU5 AREA
PB01 PB03

PBO7/C2
7.5HP
PB02 MDP1 PB03 PB07

3 SETS OF 3-25Omm THW IN TRENCH 3 SETS OF 3-25Omm THW IN TRENCH

E POWER LAYOUT PLAN E LIGHTING LAYOUT PLAN


5a 6 SCALE: NTS 5b 6 SCALE: NTS

PROJECT TITLE : APPROVED : SHEET CONTENTS : REPUBLIC ACT 9266(SEC 20)5 SHEET
SEAL REG. NO. :

VALID UNTIL :

N.E.G. CONSTRUCTION SERVICES


KENKO TOKINA SLIK CORP., BUILDING 1 MR. HIROKAZU YAMAGUCHI
VICE PRESIDENT AS SHOWN
EE-5
N.E.G.
CONSTRUCTION SERVICES
PROFESSIONAL ELECTRICAL ENGINEER
PTR NO. :

DATE :
ELECTRICAL SYSTEM AS-BUILT PROJECT OWNER

5 OF 5
LOCATION: TIN : ADDRESS : KENKO TOKINA SLIK CORPORATION, MEPZ 1,
PROJECT LOCATION : KENKO TOKINA SLIK CORP., MEPZ 1, BRGY. IBO LAPU-LAPU CITY BRGY. IBO LAPU-LAPU CITY DRAFTED BY : REXVHILLE QUIJANO REV.DATE:

You might also like