STRETCH A
KEY PLAN
REFERENCE DRAWINGS
STRETCH A STRETCH C 1. DESIGN IS ACCORDING TO THE KAAR MASTER
PLAN, 25 OCTOBER 2018.
2. FOR DRAWING LIST, REFER TO:
R1 R2 R3 KAAR-COW-PW-IC-STU-FZS-DWG-STR-24103
R4 R5 R6 R7 R8 R9 R10 3. FOR GENERAL NOTES, LEGEND AND
ABBREVIATIONS, REFER TO:
KAAR-COW-PW-IC-STU-FZS-DWG-STR-24107 AND
KAAR-COW-PW-IC-STU-FZS-DWG-STR-24108.
4. FOR GENERAL OVERVIEW PLAN OF ST07 AND
ST08 STRUCTURES, REFER TO:
KAAR-COW-PW-IC-STU-FZS-DWG-STR-24104.
NW1 NW2 NW3 5. FOR ROAD DETAIL REFER DWG. (REV. 01-B).
NW4 NW5 NW6 NW7 NW8 NW9 NW10 KAAR-SET-PW-FD-NTU-FZS-DWG-CIV-45202 AND
KAAR-SET-PW-FD-NTU-FZS-DWG-CIV-45203
6. FOR UTILITIES DETAILS REFER DWG. (REV. 01).
KAAR-SET-PW-FD-USW-FZS-DWG-INF-42102 TO
KAAR-SET-PW-FD-USW-FZS-DWG-INF-42138
B1
B2 B3 B4 B5 B6 B7 B8 B9 B10 KEY PLAN:
WAY
U M AL Q U RA R OA D
ST08
SE CO N D RI N G R OA D
PRESS
A EX
MCJ0
MCC 0
UM AL
ME CC QU R
AH A R OA
JE DD D
4 75
MN1 2
+
6
MN1 0
00 M C09
M0
NORT HROAD
U RA IF R OA D
MN1 1
AB DU LLA H
NORT HROAD
NORT HROAD
CA RP ARK
( BY OTH ERS)
M OSQU E
SOUTH ROAD
AY
PRESSW
MS02
AL MA NS OU R R OA D
AEX
MS03
M ECC
AH
JEDD
SOUTH ROAD
SE CO N D RI N G R OA D
MS01
MS07
SOUTH ROAD
MA20
M004
MA10
SECTION
JE DD AH -K AA R
MC0 6
MC0 7
ABDUL LAH URAIF ROAD
MS05
MCL 0
MCM0
MS09
MS04
M S06
AL MA NS OU R R OA D
MC0 3
0
MC0 MS08
0
M C7
0
MC1
NOTES:
1. DIMENSION : ALL DIMENSION ARE IN MILLIMETERS.
2. LEVELS : ALL LEVELS ARE IN METERS.
3. DO NOT SCALE OFF THE DRAWING.
4. REVIT MODEL :
KAAR-COW-PW-FD-NTU-FZS-MD3-STR-53631.
5. FOR DRAWING LIST, REFER TO:
KAAR-COW-PW-IC-NTU-FZS-DWG-STR-24630.
6. FOR WATERPROOFING DETAILS, REFER
KAAR-COW-PW-IC-STU-FZS-DWG-STR-24109 AND
KAAR-COW-PW-IC-STU-FZS-DWG-STR-24110.
7. LOW WATER LEVEL (LWL) IS TAKEN BELOW
BASE SLAB FOR DESIGN PURPOSES (NO WATER
STRETCH C STRETCH A PRESSURE).
B SECTION
24621 SCALE1 : 250
GRADE OF CONCRETE
Drawing Title
NORTH ROAD TUNNEL ST08 - STRETCH A,
STRUCTURAL DESIGN,
ISSUED FOR CONSTRUCTION,
POURING SEQUENCE 2/2
NOTE:- Engineers
1) CASTING BLOCKS SHALL BE CAST IN SEQUENCE FROM B1 TO B10, R1 TO R10, NW1 TO NW10 AND SW1 TO SW10. Proj.Code
IT IS ASSUMED THAT BEAM OVER OPENING WOULD BE CAST IN ONE GO FOR ENTIRE STRETCH-A. Project ID Orig. Phas. Stag. Area Zone Doc. Disc. Ser. Scale
Type No. AS SHOWN
2) ANY CHANGE IN POURING SEQUENCE SHOULD BE APPROVED BY ENGINEER. AT A1 SIZE