You are on page 1of 3

PDS (Production Data Structure)

1. Production Data Structure (PDS) in APO 3.1 & Run Time Object (RTO) in 4.0 and above versions

2. Master Data Object

3. Useful for scenarios where the compoenent has got different validity periods

4. Used as Master data Basis for Planning in SAP-APO

5. Contains active Master data from iPPE (Integrated Product and Process Engineering) generated from a p

6. PPDS PDS & SNP PDS can be used as master data for planning

7. Change Management, variant configuration & Phantom assemplies are supported in PDS

8. Sub-contracting in SNP is fully integrated with R/3 is supported in PDS

9. Direct transfer of SNP PDS from R/3 is possible

10.Rapid Planning Matrix can be generated

11. Not possible to maintain PDS directly in APO and can be used only in combination with R/3

12. The transfer of data changes is simpler

13. Not possible to create alternate SNP-PDS in std system for different mode combinations

14. PDS can be automatically generated from two sources ie R/3 and iPPE
PPM (Production Process Model)
 1. Production Process Model

2. Master Data Object

3. Cannot be used for scenarios where the component has got different validity period

4. Used as Master data Basis for Planning in SAP-APO

5. Contains active Master data generated from the combination of routing (BoM & receipe) and production versions

6. PPDS PPM & SNP PPM's can be used as master data for planning

7. Not supported by PPM

8. Not supported by PPM

9. Not possible here. SNP PPMs will be generated via PPDS PPMs

10. Not possible

11. PPMs can be directly created in APO and can be modified without R/3 also.

12. Little Complex when compared to PDS

13. Alternate SNP-PPMs can be easily created

14. PPM can be generated automatically generated only from R/3


nd production versions