Professional Documents
Culture Documents
Allison H 40/50 EP
ALLISON H 40/50 EP CONTROLS INSTALLATION MANUAL
Section E: Input / Output (I/O) Functions
29-Nov-18
• Added new page for “Input Function BI: HUSH™ Mode Request Enabled By: VCM Input Wire 101”
• Added new page for “HUSH™ Pre-Tunnel Charge Request Enabled By: TCM Input Wire 323”
• Replaced “ESS Pre-Tunnel Charge Request” with “HUSH™ Pre-Tunnel Request”
• Updated graphics links
Adaptation Drawings