Completion Instructions:
District : __________________________________________
State : ___________________________________________
No of transactions /day
No of pump islands (IMPORTANT)
Total no. of Dispenser Units (IMPORTANT)
Canopy coverage for all islands
(IMPORTANT)
Whether Sales room has sufficient space
to accommodate Cabinet (IMPORTANT)
Confirm availability of proper ventilation in
Sales room (YES/NO) (IMPORTANT)
Availability of connectivity
(VSAT/Dialup/Broadband/GPRS), if Yes
mention service provider (IMPORTANT)
Future Plans (new pump & Island addition,
replacement, canopy modifications, etc.)
DU DETAILS
TOTAL
DUS = Ready for
DU MAKE DUS UNDER STATUS PUMP TYPE
Automation
GVR/ MIDCO/
DU 1 Yes/No TOKHIEM/ DW/ Replacement/
OTHERS Modernization/ Realignment (Mono/Dual/MPP/MPD)
GVR/ MIDCO/
DU 2 Yes/No TOKHIEM/ DW/ Replacement/
OTHERS Modernization/ Realignment (Mono/Dual/MPP/MPD)
GVR/ MIDCO/
DU 3 Yes/No TOKHIEM/ DW/ Replacement/
OTHERS Modernization/ Realignment (Mono/Dual/MPP/MPD)
GVR/ MIDCO/
DU 4 Yes/No TOKHIEM/ DW/ Replacement/
OTHERS Modernization/ Realignment (Mono/Dual/MPP/MPD)
GVR/ MIDCO/
DU 5 Yes/No TOKHIEM/ DW/ Replacement/
OTHERS Modernization/ Realignment (Mono/Dual/MPP/MPD)
GVR/ MIDCO/
DU 6 Yes/No TOKHIEM/ DW/ Replacement/
OTHERS Modernization/ Realignment (Mono/Dual/MPP/MPD)
GVR/ MIDCO/
DU 7 Yes/No TOKHIEM/ DW/ Replacement/
OTHERS Modernization/ Realignment (Mono/Dual/MPP/MPD)
TOTAL
TANKS DETAILS
TANKS =
Site Survey Format for System Integration
SPACE B/W
SEPRATE
Probe
MS HSD Tank CHAMBER TANKS UNDER Spare feeder available for installation of two
Nos installation
(PETROL) Nos (DIESEL) Modified FOR PROBES REPLACEMENT nos. UPS (Yes/No) (32 Amp MCB)
& STP
INSTALLATION
(400mm)
Probe Probe
Length Nos Length Nos T1 Yes/No Yes/No Yes/No Yes/No Yes/No
1500 mm 1500 mm
Probe Probe
Length Nos Length Nos T2Yes/No Yes/No Yes/No Yes/No BROAD BAND Yes/No
1750 mm 1750 mm
Probe Probe
Length Nos Length Nos T3Yes/No Yes/No Yes/No Yes/No VSAT Yes/No
2000 mm 2000 mm
Probe Probe
Length Nos Length Nos T4Yes/No Yes/No Yes/No Yes/No
2250 mm 2250 mm SPACE FOR CABNIET
Yes/No
Probe Probe INSTALLATION
Length Nos Length Nos T5Yes/No Yes/No Yes/No Yes/No
2500 mm 2500 mm
Probe Probe
Length Nos Length Nos T6Yes/No Yes/No Yes/No Yes/No
SPACE FOR (8)
2750 mm 2750 mm
BATTERIES Yes/No
Probe Probe
INSTALLATION
Length Nos Length Nos T7Yes/No Yes/No Yes/No Yes/No
3000 mm 3000 mm
Probe Probe
DG Set standard/non
Length Nos Length Nos T7Yes/No Yes/No Yes/No Yes/No
standard
3200 mm 3200 mm
Full
Tank Diameter Capacity Height Height Height Height Height Height No. Of
Grade Volume
No. (mm) (KL) A B C D E E1 Manholes
(KL)
1
2
3
4
5
6
7
8
9
Availability of 32 AMP double pole MCB for giving UPS output to DU : YES / NO
Site Survey Format for System Integration
Phase-Neutral (Vac)
Phase-Earth (Vac)
Neutral-Earth (Vac)
Frequency (Hz)
Note : For checking main supply voltage, if transformer is present, then measure power parameters at
power stabiliser output and for checking Generator supply voltage, switch off main power (transformer if
present) & then measure power parameters at power stabiliser output.
Forecourt Layout : Forecourt Layout should be asked to Site people. If not available at site, same to be
asked to respective HPCL Regional office.
Cable Routing Distances for Forecourt Equipment’s (With 1 Mtr extra at both ends
for Glanding / Termination)
HPCL
Representative
GVR Representative