You are on page 1of 1

CIVIL DEFENSE DEPARTMENT

MINISTRY OF INTERIOR STATE OF QATAR


LEGEND
FM 200 GAS NOZZLE (FOR ROOM SPACE)
FM 200 GAS CYLINDER
A ACTUATOR
P PRESSURE SWITCH
PIPE (FOR ROOM SPACE)
FECP FIRE EXITINGUISHING CONTROL PANEL
FIRST STAGE ALARM BELL
SECOND STAGE SIREN
COMBINED HORN & BEACON LIGHT
OPTICAL TYPE SMOKE DETECTOR
OPTICAL TYPE HEAT DETECTOR
1.5 HOUR FIRE RATED DOOR
EMERGENCY LIGHT
EMERGENCY LIGHT WITH EXIT SIGN
PRESSURE SWITCH
SOLONOID VALVE
A/C SHUT DOWN
END OF LINE RESISTOR
ABORT SWITCH
SEQUENCE OF OPERATION
FM-200 SYSTEM IS GAS SUPPRESSION SYSTEM EXTINGUISHED IN THE SPACE
AS GAS VAPOR AT HIGH PRESSURE ( 4-6 ) BAR TO COVER THE PROTECTED
AREA IN THE FOLLOWING SEQUENCE OF OPERATION :-
1- ONCE FIRST DETECTOR IN THE PAEC SENDING SMOKE DIRECTLY
SEND SIGNAL TO CONTROL PANEL .
2. CONTROL PANEL SENDING THE FOLLOWING SIGNALS :-
- ACTUATING 1ST STAGE ALARM
- SHUT DOWN A/C OR VENTILATION SYSTEM . GULF CONSULTING GROUP
- CLOSING AUTOMATIC ROLL UP SHUTTER .
3. ON CONTROL PANEL RECEIVING SIGNAL FROM 2ND DETECTOR
SENDING THE FOLLOWING SIGNALS :-
- ACTUATING 2ND STAGE ALARM SYSTEM
- TO FIRE ALARM SYSTEM IN THE BUILDING
- ACTUATING FM-200 SOLENOID VALE DIRECTLY CONTROLLING THE
FM -200 GAS FLOW
- AFTER (30-60) sec. THE SOLENOID VALE START RELAPSING THE GAS
FROM CYLINDER
- AFTER (20-40) sec. THE SOLENOID VALE START RELAPSING THE GAS
4. ANY ONE IN HTE BUILDING CAN RELEAS MANUALLY THE GAS IN CASE
THERE IS FIRE AND THE SYSTEM NOT RESPONED AUTOMATICALLY .