You are on page 1of 2

New- Bill Preview

Lkgk;rk ds fy;s dky djsa 1912


Dakshinanchal Vidyut Vitaran Nigam Ltd

  For Assistance Dial
enf{k.kkapy fo|qr forj.k fuxe fyfeVsM fcy gsrq Whatsapp No. 5616195

                                  fo|qr chtd@


Electricity Bill                          Pay your bill on  www.upenergy.in
 ij Hkqxrku djsa
 [kkrk la[;k@ Account No : 721803709660  lhvkbZ,u @ CIN :
 uke @ Name : M/s.PINKI  [k.M@ Division : EDD-II ALIGARH
 firk@ifr dk uke@ W/O.SUBHASH LODHI  mi[k.M @ Sub Division : EDSD-II CHHARRA
Father/Husband name
   
 Lohd`r Hkkj@ Sanctioned 1  KW
Load :
 irk@ Address    EkhVj Øe la0@ Meter S.No : 1577219
 LODHI NAGAR CHHARRA RAFATPUR    
 CHHARRA ALIGARH  
 eksckby ua0@ Mobile No: ******6232  VSfjQ@ Tariff : LMV-1
 bZ&esy@ Email:  lIykbZ Vkbi@ Supply Type : 10A
 Laka;kstu frfFk@ Connection Date 02-08-2018
 Tkek izfrHkwfr@ Security 0.00
: Deposit :
 yweksa dh la[;k@ No. of looms <= 0
 yweksa dh la[;k@ No. of 0
60 : looms > 60 :

 fcy la0@ Bill No: 2464221029310634  fcy vk/kkj@ Bill Basis: IDF  ns; frfFk@ Due Date: 13-11-2022

 fcy frfFk@ Bill Date : 29-10-2022  fcYM fMekaM@ Billed Demand: 1.00     

 fcy ekg@ Bill Month: OCTOBER-2022  buvksijsfVo jkf’k@ Inoperative Amount: 0.00  foPNsnu frfFk@ Discon Date: 20-11-2022

  Net Billed unit: 0  izxkeh lfClMh@ Progressive Subsidy: 0

 fo|qr iznk; lafgrk 2005 dh /kkjk 171 ds rgr bl fcy dks vafre uksfVl ekuk tk;sxkA fiNys ekg ds cdk;s ij la;kstu fdlh Hkh frfFk ij dkVk tk ldrk gS
This bill will be constituted as final notice under section 171 of Supply Code 2005. Supply can be disconnected at any date on
old dues
 jkf’k@
 fooj.k@
Details  jkf’k@
Amount  fooj.k@
Details
Amount

 lfClMh jkf'k@  ns; jkf'k@  izfrHkwfr C;kt@ Interest on Security (-)


0.00

 dqy jkf'k@ Subsidy


Gross Amount Net Amount 0.00


 ÅtkZ izHkkj@ Energy charges
Amount  ns; izfrHkwfr@ Due Security

0.00 0.00 0.00


 fQDLM@ekax izHkkj   Fixed/Demand Charges
 Vh-Mh-,l jkf’k&@ TDS Amount
0.00
 U;wure izHkkj@ Min Charge
0.00/50.00 0.00/0.00 0.00/50.00

0.00 0.00 0.00  Vh-lh-,l jkf’k&@ TCS Amount


0.00
 fo|qr dj@ Electricity Duty

2.50  lh-th-,l-Vh-@ CGST


0.00
 vfrfjDr ekax izHkkj@ Excess Demand Penalty

0.00  ,l-th-,l-Vh@ SGST


0.00

 laèkkfj=@de ih-,Q- vf/kHkkj



Capacitor/Low P.F Surcharge


0.00 /
0.00  orZeku foyEc Hkqxrku vf/kHkkj@ Current LPSC
0.70

 vufUre lek;kstu@ Provisional Adjustment (-)


0.00  usV djsUV fcy@ Net Current Bill
53.20

 VSfjQ lek;kstu@ Tariff Adjustments


0.00  Lkjdkj }kjk ns; NwV@ Agriculture Subsidy
0.00

 ØsfMV@ Credit (-)


0.00  lfClMkbTM fcy@ Subsidized Bill
53.20

 MsfcV@ Debit (+)


0.00  ns; frfFk NwV lek;kstu@
0.00


Prev. Due Date Rebate Adj.

 fofo/k pktsZt+@ Misc Charges (+)


0.00


 cdk;k /kujkf’k@ Arrear Amount
186.07
 NwV@ Rebate (-)
0.00


 iwoZ foyEc Hkqxrku vf/kHkkj@ Prev Arrear LPSC
2.80
 jsM fu/kkZj.k@ Raid Assessment 0.00

 ns; jkf’k@ Payable Amount


242.00

 fd'r@ Installment (+)


0.00


 ‘kCnksa esa@ In Words : Two Hundered Fourty Two Rupees Only
 vukfnzr psd /kujkf’k@ Dishonor Cheque (+) 0.00
 vukfnzr izHkkj@ Dishonor Charge(+)
0.00
 ns; frfFk rd jkf’k@ Payable by due date 242.00

 miHkksDrk fo|qr dk;kZy;ksa] jk’ku nqdku] bZlqfo/kk ,oa tulqfo/kk dsUnz rFkk fo++|qr l[kh ,oa ehVj jhMjksa ds ek/;e ls Hkh fcy Hkqxrku dj ldrs gSa
Consumers can also pay bills from Deptt. offices, Fair price shops, e-Suvidha, Jansuvidha Kendra and through Vidyut Sakhi and Meter
Readers.
h h s Z
 Mh-Mh-@psd izkIrdrkZ@
Pay DD/Cheque in favour of EXECUTIVE ENGINEER EDD-II ALIGARH

ehVj ySc la0 ehVj fLFkfr ntZ ekax fiNyh@


Previous orZeku@
Current varj ehVj ehVj ;wfuV vof/k ¼ekg½ ehVj
xq.kkad fVIi.kh
Meter Lab
Meter Status
Recorded
frfFk@
Date jhfMax@ frfFk@ jhfMax@ Diff M.F.
Meter
Period(Months)
Meter
No Demand Read Date Read Units. Remark
Meter Informed 0
1577219 25/09/2022 4855 29/10/2022 4855 0 1 1 OK
Defective KWH
Meter Informed 1.0
1577219 0.00 1 1 OK
Defective KW
Opening Surplus Solar
fu/kkZfjr ;wfuV@ Assessed Unit(A) (0/0)
Units(B)
Closing Surplus Solar Units(B) 0 ehVj ;wfuV@ Meter Units(C) 0

iwoZ Hkqxrku fooj.k@


Last Payment iwoZ Hkqxrku fooj.k@
Current
ÅtkZ ‘kqYd dh x.kuk@
Energy Charges Calculation
Details Payment Details

;wfuV@ VSfjQ njsa@ dqy jkf'k


Gross lfClMh njsa@ lfClMh jkf'k@ Net Energy iwoZ Hkqxrku jkf’k@ 134.00  Paid Amount  
Unit Tarrif Rate Amount Subsidy Rate Subsidy Amount Charge Last Paid Amount

iwoZ Hkqxrku frfFk@


            07/05/2022  Paid Date  
Last Paid Date
             Payment Mode  
jk”Vª fgr esa fctyh cpk;saA Energy Saved
             Receipt No  
is Energy Produced

           

BACK

Powered by Fluentgrid Ltd.(Formerly Phoenix IT Solutions Ltd.) | mPower™ CSS

You might also like