Professional Documents
Culture Documents
NF (K.Kkapy Fo - QR Forj.K Fuxe Fyfevsm: Electricity Bill Cum Disconnection Notice Duplicate Bill
NF (K.Kkapy Fo - QR Forj.K Fuxe Fyfevsm: Electricity Bill Cum Disconnection Notice Duplicate Bill
fcy la0@Bill No: 20233721804126359 fcy vk/kkj@Bill Basis: MU ns; frfFk@Due Date: 20-03-2023
13-03-2023 fcYM fMekaM@Billed Demand: 0.75
fcy frfFk@Bill Date: buvksijsfVo jkf’k@Inoperative ns; frfFk rd NwV@Due date rebate: 0
fcy ekg@Bill Month: MARCH-2023 Amount: 0.00
izxkeh lfClMh@Progressive ns; frfFk rd jkf’k@Payable by Due 13,270.00
usV fcYM ;wfuV/@Net Billed 29.0 Subsidy: 0.00 date:
Unit: foPNsnu frfFk@Discon. Date: 28-03-2023
fo|qr iznk; lafgrk 2005 dh /kkjk 171 ds rgr bl fcy dks vafre uksfVl ekuk tk;sxkA fiNys ekg ds cdk;s ds Hkqxrku u gksus ij la;kstu fdlh Hkh frfFk ij dkVk tk ldrk gSA
This bill will be constituted as final notice under section 171 of Supply Code 2005. Supply can be disconnected at any date on non-payment of old dues.
fQDLM@ekax izHkkj Fixed/Demand Charges 0.00/37.50 0.00/0.00 0.00/37.50 Vh-lh-,l jkf'k@ TCS Amount 0.00
U;wure izHkkj@ Min Charges 0.0 0.00 0.00 lh-th-,l-Vh-@ CGST 0.00
miHkksDrk fo|qr dk;kZy;ksa] jkku nqdku] bZlqfo/kk ,oa tulqfo/kk dsUnz rFkk fo++|qr l[kh ,oa ehVj jhMjksa ds ek/;e ls Hkh fcy Hkqxrku dj ldrs gSaconsumers can also pay bills from
Deptt. offices, Fair price shops, e-Suvidha, Jansuvidha Kendra and through Vidyut Sakhi and Meter Readers
Mh-Mh-@psd izkIrdrkZ@Pay DD/Cheque in favour of Executive Engineer. EDD-II MAHOBA
ehVj ySc la0 ehVj fLFkfr ntZ ekax fiNyh@Previous orZeku@Current varj ehVj xq.kkad ehVj ;wfuV vof/k ¼ekg½ ehVj fVIi.kh
Meter Badge Meter Recorded frfFk@ jhfMax@ frfFk@ jhfMax@ Diff. MF Meter Period(mon Meter
No. Status Demand. Date Read Date Read Units ths) Remark
MBF7894 Normal 11-02-2023 1270 13-03-2023 1299 29 1 29 1 ok
1 KWH
MBF7894 Normal 0.28 1 0.75 1 ok
KW
fu/kkZfjr ;wfuV@Assessed (0/0) Opening Surplus 0 Closing Surplus 0 ehVj ;wfuV@Meter Units(C) 29
Unit(A) Solar Units Solar Units