FINAL SURVEY REPORT

CARGO : GABBRO AGGREGATE SIZE: 5-20 MM BULK


MOTHER VESSEL : MV-SAN NICOLAS
B/L QUANTITY : 20,000.00 M/TONS ON ACCOUNT CHINA PETROLEUM PIPELINE BUREAU
ACCOUNT : Sultan Lagoon Hub Bangladesh Ltd
PORT OF LOADING : MINA SAQR, RAS AL KHAIMAH, UAE
DISCHARGING PORT : CHATTOGRAM, BANGLADESH
IMPORT ROT NO. : 2019/3489 VOYAGE NO.:SGTC1907

We MNS Inspection Company, in accordance with the instruction received from Sultan Lagoon Hub BD. Ltd, vide
their mail dated 17.10.2019, attended on board the mother vessel on 24.10.2019 to 02.11.2019, for discharging
supervision, load draft survey, part draft survey & light draft survey at Chattogram Outer Anchorage/Kutubdia &
on board the following lighter vessels between 24.10.2019 to 02.11.2019, for ascertaining of quantity by load &
light draft survey as per conventional method.

DRAFT SURVEY OF MOTHER VESSEL MV-SAN NICOLAS AT CHATTOGRAM O/A & KUTUBDIA :

Attending Surveyor:

Part Draft Survey & Final Draft Survey CAPT. Abdul Karim & CAPT.Md. Abdullah Al Mamun , Surveyor of MNS
INSPECTION Company on behalf of Sultan Lagoon, Chief Officer of the vessel.

According to the findings of the pre-discharge Part draft survey of the vessel at Chattogram Outer Anchorage the
vessel was found to be carrying 20,000 M/Tons of Crushed Stone based on a declared ship’s constant 350.000
M/Tons, against the Bill of Lading quantity of 20,000.000 M/Tons.

On completion of discharge CPPB cargo from MV-SAN NICOLAS. A final draft survey was conducted by the Chief
Officer of the vessel and us at Chittagong Kutubdia. As per final draft survey estimated quantity of cargo
discharged at Chattogram Kutubdia 20,0000 M/Tons

DRAFT SURVEY OF LIGHTER VESSEL:

We attended on board the below lighter vessels at Matarbari to carry out light & load draft survey of each lighter
vessel in presence of Master/Seacunny of lighter vessel through conventional method.
Date: 03.11.2019
Report No: MNS/SL/CPPB/19/04
Page no. 2 of 2
FINAL DRAFT SURVEY QUANTITY OF EACH LIGHTER/BARGE VESSEL FOUND AS UNDER:
SL Name of Lighter/Barge Commenced Complete Estimated
NO Vessel Discharging Discharging Quantity of Destination
Cargo Loaded
as per Draft
Survey Basis
Conventional
Method
01 MV-SS HELENCHA-7 1815 HRS=29.10.19 2250 HRS=29.10.19 1975.000 MATARBARI

02 MV-MARINTRUST-01 1940 HRS=29.10.19 0310 HRS=30.10.19 1540.000 MATARBARI

03 MV-FAEJULLAH-1 0500 HRS=30.10.19 1150 HRS=30.10.19 2495.000 MATARBARI

04 MV-SS HELENCHA-7 0200 HRS=31.10.19 0650 HRS=31.10.19 2064.000 MATARBARI


(2ND TRIP)
05 MV.LUA-2802 0440 HRS=31.10.19 1500 HRS=31.10.19 1575.000 MATARBARI

06 MV-MARINTRUST-01 0900 HRS=31.10.19 1915 HRS=31.10.19 1507.000 MATARBARI


(2ND TRIP)
07 MV-SS HELENCHA-7 0420 HRS=01.11.19 0700 HRS=01.11.19 2136.000 MATARBARI
(3RD TRIP)
08 MV-LUA 2801 0800 HRS=01.11.19 0140 HRS=01.11.19 2100.000 MATARBARI

09 MV-FAEJULLAH-1 1420 HRS=01.11.19 2100 HRS=01.11.19 1600.000 MATARBARI


(2ND TRIP)
10 MV-MARINTRUST-01 2240 HRS=01.11.19 0240 HRS=02.11.19 1050.000 MATARBARI
(3RD TRIP)
11 MV-SS HELENCHA-7 1120 HRS=02.11.19 2130 HRS=02.11.19 1958.000 MATARBARI
(4RD TRIP)
Total 20,000.000
Discharging commenced at 1815 hrs on 29.10.2019 & completed at 2130 hrs on 02.11.2019.

Total Delivered quantity 20,000.000 M/Tons to China Petroleum Pipeline Bureau.

This Report comprises of 2 (Two) pages and is not valid unless all pages bear the following signature.

This survey has been carried out to the best of our knowledge and ability and our responsibility is limited to the
exercise of due care.

THIS REPORT IS ISSUED WITHOUT PREJUDICE TO ANY AND ALL PARTIES CONCERNED.
Issued By:

Pijush Talukder
Chief Surveyor