You are on page 1of 18

Skinfaks Rimfaks IOR Project

Contract No: 4500954142

Statoil

0A 16.06.2006 Re-Issued for Construction VSC MBJ CMF


0 26.05.2006 Issued for Construction VSC MBJ CMF
2 10.05.2006 Issued for Client Comments VSC MBJ CMF
1 09.05.2006 Issued for IDC VSC MBJ CMF
REVISION DATE DESCRIPTION ORIGINATOR CHECKED APPROVED CLIENT APPR

Document Title:

Welding Procedure Specification - Offshore Tie-In Welds


Document No: C017-4-F-SF-111 File Ref: WPS-Offshore Tie-In Welds
Rev0A.doc
Skinfaks Rimfaks IOR Project
Document Title: Welding Procedure Specification - Offshore Tie-In Welds
Document No: C017-4-F-SF-111

CONTENTS

1. INTRODUCTION ............................................................................................................................................ 3

2. REFERENCES ............................................................................................................................................... 4

APPENDIX I.
ES0063-WPS-03 - 10” AND 8” OFFSHORE TIE-IN
MAIN PROCEDURE - 13% CR
APPENDIX II.
ES0063-WPS-03A - 10” AND 8” OFFSHORE TIE-IN
THROUGH THICKNESS REPAIR PROCEDURE - 13% CR
APPENDIX III.
ES0063-WPS-03B - 10” AND 8” OFFSHORE TIE-IN
MID THICKNESS REPAIR PROCEDURE - 13% CR
APPENDIX IV.
ES0063-WPS-03C - 10” AND 8” OFFSHORE TIE-IN
CAP REPAIR PROCEDURE - 13% CR
APPENDIX V.
ES0063-WPS-22 – 4” OFFSHORE TIE-IN
MAIN PROCEDURE – GAS LIFT LINE
APPENDIX VI.
ES0063-WPS-22A – 4” OFFSHORE TIE-IN
THROUGH THICKNESS REPAIR PROCEDURE – GAS LIFT LINE
APPENDIX VII.
ES0063-WPS-22C – 4” OFFSHORE TIE-IN
CAP REPAIR PROCEDURE – GAS LIFT LINE

Rev No: 0A Page 2


Date: 16.06.2006 O:\40 Projects\40.37 Skinfaks Rimfaks\90 Common\O. S7 Master Documents and Procedures\WPS -
Offshore Tie-In\WPS-Offshore Tie-In Welds Rev0A.doc
Skinfaks Rimfaks IOR Project
Document Title: Welding Procedure Specification - Offshore Tie-In Welds
Document No: C017-4-F-SF-111

1. INTRODUCTION

As part of the development solution for the Tampen area, Statoil as the operator has
decided upon a combined subsea development of the Skinfaks and Rimfaks IOR
prospects.

The concept for the subsea development consists of one (1) new template i.e. Template 'N'
(prepared for 4 wells) producing through two (2) new 10” pipelines to the existing 'L/M'
Templates; the existing 'L/M' Templates are connected to the Gullfaks 'C' Platform via an
existing bundle system (GFSAT2). A new single satellite well i.e. Satellite 'N5' will also be
tied back to Template 'N' by means of a new 8” pipeline.

A new tie-in manifold will be installed next to the existing 'L/M' Templates to enable pigging
of both new and existing pipelines.

An Integrated Service Umbilical (ISU) containing a 3” centre line, hydraulic tubing and
signal/power cables will be installed from the GFSAT2 bundle towhead C4 to Template 'N',
and a second in field umbilical will be installed further to Satellite 'N5'.

A 4" Gas Lift (GL) pipeline will be installed between Template 'N' and the existing
Template 'J'.

The water depth in the area is approximately 135 metres.

Statoil has decided to split the Scope of Work (SOW) into the following three (3) distinct
Work Packages:

A Installation of 8” and 10” pipelines


B Installation of structures, spools and tie-in of spools, umbilicals and GL pipeline
C Installation of umbilicals and 4” GL pipeline

Statoil have awarded the Work scopes for packages A and C to Subsea7.

The scope of work for package B has been awarded to Saipem.

Packages A & C will be run by Subsea7 as an integrated Project under a single Contract
number with Statoil: 4500954142.

Rev No: 0A Page 3


Date: 16.06.2006 O:\40 Projects\40.37 Skinfaks Rimfaks\90 Common\O. S7 Master Documents and Procedures\WPS -
Offshore Tie-In\WPS-Offshore Tie-In Welds Rev0A.doc
Skinfaks Rimfaks IOR Project
Document Title: Welding Procedure Specification - Offshore Tie-In Welds
Document No: C017-4-F-SF-111

2. REFERENCES

Ref Document No. Rev. Title


/1/ OS-F101 2003 Submarine Pipeline Systems , DnV
/2/ DXXX-S-000-R-SF-015 0 Addendum to OS-F101
Welding of Line pipe – 13% Cr steels
/3/ Specification for pipelay welding; Installation by S-
TR 1096 1.01
laying; Amendment to DNV OS-F101
/4/ Specification for Pipeline Welding; Installation by
TR 1097 1.01
Reeling. Amendment to DNV OS-F101.
/5/ Specification Amendment to OS-F101, Submarine
TR 1106 1.01
Pipeline Systems
/6/ C017-4-F-QC-001 2 Welding Procedure Qualification Record –
Offshore Tie-in Welds

Rev No: 0A Page 4


Date: 16.06.2006 O:\40 Projects\40.37 Skinfaks Rimfaks\90 Common\O. S7 Master Documents and Procedures\WPS -
Offshore Tie-In\WPS-Offshore Tie-In Welds Rev0A.doc
Skinfaks Rimfaks IOR Project
Document Title: Welding Procedure Specification - Offshore Tie-In Welds
Document No: C017-4-F-SF-111

APPENDIX I.

ES0063-WPS-03 - 10” AND 8” OFFSHORE TIE-IN

MAIN PROCEDURE - 13% CR

Rev No: 0A Page 1


Date: 16.06.2006 O:\40 Projects\40.37 Skinfaks Rimfaks\90 Common\O. S7 Master Documents and Procedures\WPS -
Offshore Tie-In\WPS-Offshore Tie-In Welds Rev0A.doc
Skinfaks Rimfaks IOR Project
Document Title: Welding Procedure Specification - Offshore Tie-In Welds
Document No: C017-4-F-SF-111

APPENDIX II.

ES0063-WPS-03A - 10” AND 8” OFFSHORE TIE-IN

THROUGH THICKNESS REPAIR PROCEDURE - 13% CR

Rev No: 0A Page 1


Date: 16.06.2006 O:\40 Projects\40.37 Skinfaks Rimfaks\90 Common\O. S7 Master Documents and Procedures\WPS -
Offshore Tie-In\WPS-Offshore Tie-In Welds Rev0A.doc
Skinfaks Rimfaks IOR Project
Document Title: Welding Procedure Specification - Offshore Tie-In Welds
Document No: C017-4-F-SF-111

APPENDIX III.

ES0063-WPS-03B - 10” AND 8” OFFSHORE TIE-IN

MID THICKNESS REPAIR PROCEDURE - 13% CR

Rev No: 0A Page 1


Date: 16.06.2006 O:\40 Projects\40.37 Skinfaks Rimfaks\90 Common\O. S7 Master Documents and Procedures\WPS -
Offshore Tie-In\WPS-Offshore Tie-In Welds Rev0A.doc
Skinfaks Rimfaks IOR Project
Document Title: Welding Procedure Specification - Offshore Tie-In Welds
Document No: C017-4-F-SF-111

APPENDIX IV.

ES0063-WPS-03C - 10” AND 8” OFFSHORE TIE-IN

CAP REPAIR PROCEDURE - 13% CR

Rev No: 0A Page 1


Date: 16.06.2006 O:\40 Projects\40.37 Skinfaks Rimfaks\90 Common\O. S7 Master Documents and Procedures\WPS -
Offshore Tie-In\WPS-Offshore Tie-In Welds Rev0A.doc
Skinfaks Rimfaks IOR Project
Document Title: Welding Procedure Specification - Offshore Tie-In Welds
Document No: C017-4-F-SF-111

APPENDIX V.

ES0063-WPS-22 – 4” OFFSHORE TIE-IN

MAIN PROCEDURE – GAS LIFT LINE

Rev No: 0A Page 1


Date: 16.06.2006 O:\40 Projects\40.37 Skinfaks Rimfaks\90 Common\O. S7 Master Documents and Procedures\WPS -
Offshore Tie-In\WPS-Offshore Tie-In Welds Rev0A.doc
Skinfaks Rimfaks IOR Project
Document Title: Welding Procedure Specification - Offshore Tie-In Welds
Document No: C017-4-F-SF-111

APPENDIX VI.

ES0063-WPS-22A – 4” OFFSHORE TIE-IN

THROUGH THICKNESS REPAIR PROCEDURE – GAS LIFT LINE

Rev No: 0A Page 1


Date: 16.06.2006 O:\40 Projects\40.37 Skinfaks Rimfaks\90 Common\O. S7 Master Documents and Procedures\WPS -
Offshore Tie-In\WPS-Offshore Tie-In Welds Rev0A.doc
Skinfaks Rimfaks IOR Project
Document Title: Welding Procedure Specification - Offshore Tie-In Welds
Document No: C017-4-F-SF-111

APPENDIX VII.

ES0063-WPS-22C – 4” OFFSHORE TIE-IN

CAP REPAIR PROCEDURE – GAS LIFT LINE

Rev No: 0A Page 1


Date: 16.06.2006 O:\40 Projects\40.37 Skinfaks Rimfaks\90 Common\O. S7 Master Documents and Procedures\WPS -
Offshore Tie-In\WPS-Offshore Tie-In Welds Rev0A.doc