= Pending work at 220 KV Substion Balrmapur Details 160 MVA TF-II Data Validation umpering Isolator remaote operation & Alignment Termination oat switchyard and control room end Testing 40 MVA TF- 132 KV Itiyatho! Bay 1&1 132 KV Itiyatho} Bay! & Il [Data Validation Jumpering Isolator remaote operation & Alignment [Termination oat switchyard and control room end |r| sla |oe]en] a feafns]nn) 2 Kk Testing Oil testing [Data Validation umpering ~ 1 k isolator remaote operation & Alignment Data Validation pumpering isolator remaote operation & Alignment SCADA 33 KV side Data Val.dation 01 No system is out of service UPS is 2is0 not working se ]es|refee|eofns ee] frsl en I Proper laying of OFC cable not done status of 220 KV/132 KV side Isolator not display at SCADA system Properiy ‘Termination of 05 No bay Is pending (Connect.on of station 1/Fall with main bus - bar & ACDB is pendi Bank DC Source & battery} Both Dc Source are dead {All Pane’s are connected with 01 No Same DC cable. Termination ~ Commissioning 220 KV /132 KV/33 KV Cable termination are without female & leg also is pending [Cable termination is pending at bus bar protection panel & UFR panel Tnerezy meter is not installed at 40 MVA T/F-ll bay & Check meter is not installed at 400 (Gonda) bay. (Capacitor Bank | & li, UFR and bus-bar protection commissioning is pending [Enerp ization of 132 KV Main bus bar- Il is pending Miscelleneous fetta jsolator alignment is 132 KV Side yared is pending Varios switclyrad lighting are defective

You might also like