Pending work at 220 KV Substion Balrmapur
Details
160 MVA TF-II
Data Validation
umpering
Isolator remaote operation & Alignment
Termination oat switchyard and control room end
Testing
40 MVA TF-
132 KV Itiyatho!
Bay 1&1
132 KV Itiyatho}
Bay! & Il
[Data Validation
Jumpering
Isolator remaote operation & Alignment
[Termination oat switchyard and control room end
|r| sla |oe]en] a feafns]nn) 2
Kk
Testing
Oil testing
[Data Validation
umpering
~ 1
k
isolator remaote operation & Alignment
Data Validation
pumpering
isolator remaote operation & Alignment
SCADA
33 KV side
Data Val.dation
01 No system is out of service
UPS is 2is0 not working
se ]es|refee|eofns ee] frsl en
I
Proper laying of OFC cable not done
status of 220 KV/132 KV side Isolator not display at SCADA system
Properiy
‘Termination of 05 No bay Is pending
(Connect.on of station 1/Fall with main bus - bar & ACDB is pendi
Bank
DC Source & battery}
Both Dc Source are dead
{All Pane’s are connected with 01 No Same DC cable.
Termination
~
Commissioning
220 KV /132 KV/33 KV Cable termination are without female & leg also
is pending
[Cable termination is pending at bus bar protection panel & UFR panel
Tnerezy meter is not installed at 40 MVA T/F-ll bay & Check meter is not
installed at 400 (Gonda) bay.
(Capacitor Bank | & li, UFR and bus-bar protection commissioning is
pending
[Enerp ization of 132 KV Main bus bar- Il is pending
Miscelleneous
fetta
jsolator alignment is 132 KV Side yared is pending
Varios switclyrad lighting are defective