yy)
SAP Certified Application Associate - SAP S/4HANA
Production Planning and Manufacturing - Mini
You got 33 of 40 possible points.
Your score: 83 %
Question Results
Question:
Which of the following are included as SAP S/4HANA Sales Simp!
There are 3 correct answers to this question,
Response:
WO Settlement Management replaces ERP SD Rebates
YK. sar sales Support replaces SAP CRM
VO SAP Revenue Accounting replaces ERP SD Revenue Recognition
YK sa? order Fulfillment replaces ERP SD Availability Checking
v
SAP GTS replaces ERP SD Foreign Trade
Question: Score 1 of 1
What are properties of MRP Live?
There are 2 correct answers to this question
Response:
Data is read sequentially from the database tables
The code is written in SQL ScriptIt uses the same BAdis as classic MRP
WO itis executed on the database server
Score 0 of 1
Question:
What are benefits of the Engineering Workbench?
There are 2 correct answers to this question
Response:
YK. undo/redo functionality of planned changes
Simulation of planned changes for costing and mater all requirements planning
WO Detailed selection of bill of materials (BOM)items and operations
Simultaneous processing of different bill of materials (BOM) items and operations
Score 1 of 1
Question:
Advanced Planning uses master data and transaction data from SAP S/4HANA. In
which data objects can you set the advanced planning flag?
There are 2 correct answers to this question.
Response:
Production version
VS Material
SO Work center
Plant
Question: Score 1 of 1
d Scheduling Board have?
Which functional capabilities does the Detai
There are 2 correct answers to this questionResponse:
Change sales order quantities
Enter time-ticket confirmation for production orders
MW Undo for drag & Drop planning activities
VW Change planned order quantities
Question:
Which
There are 2 correct answers to this question.
Response:
Work Center BOM
VM Sales Order BOM
Class BOM
Functional Location 80M
Score 1 of 1
ill of material (BOM) categories can you define in SAP S/4HANA?
Question:
What steps are possible in a PP/DS production planning run?
There are 3 correct answers to this question.
Response:
MO Deteted senecutng functions
optimization
Demand consumption
VM Heuristics
Score 1 of 1Backorder processing
Score 1 of 1
Question:
You run MRP for a material that was planned using Demand-Driven Replenishment.
‘Towards which buffer level does the MRP run create a replenishment proposal?
Please choose the correct answer.
Response:
Top of Green
Top of Red Base
Top of Yellow
Top of Red
Score 1 of 1
Question:
‘ely, without moving other operations. Which
You want to schedule an operation
scheduling strategy do you select?
Please choose the correct answer.
Response:
Insert operation
Squeezing
VS Find slot
Scheduling working time only
Score 1 of 1
Question:
Which task list types can have parallel sequences?
There are 2 correct answers to this question
Response:Master recipes (2)
SO Rate routings (R)
Reference operation sets (S)
VS Routings (N)
Score 1 of 1
Question:
In Make-to-order production, which field controls whether the components will be
planned as sales order specific stock?
Please choose the correct answer.
Response:
The item category of the component in the BOM
The Planning Strategy of the finished product
The Individual/Collective indicator of the component
The MRP Type of the component
Score 1 of 1
Question:
How can SAP S/4HANA support a GMP compliant production process?
There are 3 correct answers to this question
Response:
\C- Documentation of quality data with Quality Management
Predefined GMP compliant process order types to meet audit requirements
SO Recipe approval with Engineering Change Management
Vv Use of the digital signature function to check and run business processes
Use of the GMP compliant flag in relevant master data applicationsQuestion: Score 1 of 1
You want to integrate an existing planned order into Advanced Production
Planning. Which report do you use?
Please choose the correct answer.
Response:
\@_/SAPAPO/PPDS_DELTA_ORD_TRANS
/SAPAPO/CURTO_CREATE
/SAPAPO/UPD_LOC_SP_PL
/SAPAPO/CREATE_LOCATION
Score 0 of 1
Question:
What are the possible categories for the Business Partner master data object in SAP
S/4HANA?
There are 3 correct answers to this question.
Response:
*
Vendor
Group
Organization
v
v
MO Person
x
Customer
Question: Score 1 of 1
Which characteristics should a material have for re-order point planning?
There are 2 correct answers to this questionResponse:
Replenishment lead time is known and relatively constant.
Seasonal demand is relatively volatile
Demand remains relatively constant.
Material replenishment is managed by the vendor (VMI).
Score 0 of 1
Question:
Which of the following objects can you release so that the business transactions for
process order execution and process management can be executed?
There are 2 correct answers to this question.
Response:
VW Individual operations
Individual phases
Individual process instructions
YK individual contro! recipes
Question: Score 1 of 1
‘A material in your company is planned with planning strategy 70 (Planning at
assembly level). The consumption mode has been set to backwards with a
consumption period of 12 days.
Starting from when are the 12 days counted backwards?
Please choose the correct answer,
Response:
VO From the dependent requirement date of the material
From the requested delivery date of the related finished goodFrom the planned independent requirement date of the material
From the availability date of the related finished good
Question:
Score 1 of 1
Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.
Response:
Net change planning
MRP list
Planning horizon
Parallel processing across servers
Question:
Which SAP solu'
There are 2 correct answers to this question.
Response:
Integrated Business Planning (1BP)
Material Requirements Planning (MRP)
Capacity Requirements Planning (CRP)
Supply Chain Management (SCM)
Score 1 of 1
ns can be used for forecasting in Supply Chain Planning?
Question:
What new technology is used in SAP S/4HANA Embedded Analytics?
Please choose the correct answer.
Score 1 of 1Response:
‘Smart Business Cockpit
HANA Live
Multidimensional Reporting client (MDRC)
Apap Managed Core Data Services (CDS)
Question: Score 1 of 1
If the stock level drops below the reorder stock in reorder point planning, what is
the system logic to trigger procurement?
Please choose the correct answer.
Response:
Fill up to the maximum stock level
VW Fill up based on the lot size procedure
Fill up to the reorder stock level
Fill up to the safety stock level
Question: Score 1 of 1
Your customer is using storage location is in SAP ECC and wants to switch to SAP
S/4HANA. What do you have to consider?
Please choose the correct answer.
Response:
You have to set one MRP area for every storage location.
MRP Live does NOT support storage locations, but classic MRP still does.
Storage location MRP is replaced by MRP area functionality.Storage locations are NO longer supported,
Question: Score 1 of 1
You are working with planning strategy 40 (Planning-with-final assembly). When
does consumption of planned independent requirements take place?
Please choose the correct answer.
Response:
When the MRP results are saved
When you deliver a sales order
MO when you create a sales order
When you create a planned order
Question: Score 1 of 1
Which master data object governs the relationship between supply source and
demand source in the Kanban process?
Please choose the correct answer.
Response:
Rate routing
Production supply area
control cycle
Replenishment strategy
Score 0 of 1
Question:
Which automotive-specific functionality is embedded in SAP S/4HANA?
There are 3 correct answers to this question.
Response:YK Enhanced characteristics based processes
Equipment and Tools Management
Parts interchangeability
VM Packaging Logistics
Enhanced Kanban Processing
Question: Score 1 of 1
Mode selection is one of the scheduling options available in Advanced Planning in
SAP S/4HANA, When can you use mode selection?
Please choose the correct answer,
Response:
When multiple planned orders exist on one resource
When multiple operations are maintained for one product
When multiple production versions are maintained for one product
When alternate resources are used within one operation
Score 1 of 1
Question:
SAP
Which warehouse management functions are available in SAP EWM but NOT
wn?
There are 3 correct answers to this question.
Response:
Yard Management
Labor Management
Handling Unit ManagementSO Slotting
Expected goods receipt
Score 1 of 1
Question:
You want to insert an operation at a certain time on a work center. The planning
direction is forward. The desired dispatching time coincides with an operation that
has previously been dispatched.
How does the insertion take place?
Please choose the correct answer.
Response:
a9 THe Nem operation Is Inserted at the desired time the previously dispatched eperation
is moved backward.
The previously dispatched operation stays as is the new operation is inserted after the
dispatched operation,
The previously dispatched operation stays assist the new operation is inserted before
the dispatched operation.
The new operation is inserted at the desired time; the previously dispatched operation
is moved forward.
Score 1 of 1
Question:
Which chart types does the tabular planning table provide in SAP S/4HANA?
There are 2 correct answers to this question
Response:
VM capacity requirements chart
Order (pool) chart
WO Work center capacities chart
Orders (dispatched) chartScore 1 of 1
Question:
The production plan Is being disrupted by last minute demands that are entered in
the system. Which is the most efficient way to handle last minute demands and
protect the current production plan?
There are 2 correct answers to this question
Response:
Gh Mznually firm all planned orders for materials within the replenishment lead time of
the material
9h ihe stock requirements Ist set a manual Arming fence for a date based on the
replenishment lead time of the material
In the material master record, set MRP type to P4 and a planning time fence on the
replenishment lead time of the material
In the material master record, set MRP type to P1 and a planning time fence on the
replenishment lead time of the material
Question: Score 1 of 1
ive manufacturing relevant work
In which data object is the production line (Repeti
center) maintained?
Please choose the correct answer.
Response:
MO Prosvetion version
Bil of materia
Cost collector
Repetitive manufacturing profile
Score 1 of 1
Question:What does it mean for the production planner when MRP works with infinite
capacities?
Please choose the correct answer.
Response:
MRP creates capacity requirements only if the work center has sufficient capacity.
Opp creates capacity requirements without checking the capacity of a work center.
MRP assigns capacity requirements automatically after the last scheduled order on a
work center,
MRP assigns capacity requirements automatically to work center is with the earliest
available capacity.
Score 0 of 1
Question:
You define forecast consumption as an integral part of your Production Planning
and Detailed Scheduling process. Which of the following order types consume the
forecast?
There are 2 correct answers to this question
Response:
MU sates order
YK Pienned order
Purchase order
Dependent demand
Score 1 of 1
Question:
Which of the following business processes are controlled by production order type-
dependent parameters?
There are 2 correct answers to this question.
Response:
Engineering change managementVM Planning
Implementation
Inspection during production
Question: Score 1 of 1
How can you set up the supply source for the SAP Kanban process?
There are 3 correct answers to this question
Response:
Using quotations for internal and external procurement
Using stock transfer reservations for stock transfer
Using run schedule quantities for in-house production
VO using purchase orders for external procurement
Using purchasing costs for automated source prioritization
Score 1 of 1
Question:
The method in which a production order is credited or debited depends on the
variant of cost object controlling (COC). What basis can be used to carry this out?
There are 2 correct answers to this question
Response:
Cost-related
VO order-related
Milestone-related
VM Product-relatedScore 1 of 1
Question:
Your project uses process orders for the production of Ii chemicals, What can
you define to ensure that the production flow happens only in physically connected
tanks?
Please choose the correct answer.
Response:
Setup matrix
Work center hierarchy
Operation network
MO Resource network
Score 0 of 1
Question:
Which advanced functionality has been embedded in SAP S/4HANA?
There are 3 correct answers to this question,
Response:
VS pvailable-to-promise
YK Demand planning
Supply Network Planning
Backorder processing
capacity planning
Question: Score 1 of 1
What is a typical transportation processing SAP Transportation Management?
Please choose the correct answer.
Response:Transportation Planning, Transportation Execution, Order Management, Freight Costing
and Settlement, Analytics and Reporting
Order Management, Transportation Planning, Freight Costing and Settlement,
Transportation Execution, Analytics and Reporting
VE _ Order Management, Transportation Planning, Transportation Execution, Freight Costing
and Settlement, Analytics and Reporting
Transportation Planning, Order Management, Transportation Execution, Freight Costing
and Settlement, Analytics and Reporting
Question: Score 1 of 1
An issue storage location was NOT found through the work center, bill of material
(BOM) item, or material master. What determines whether the storage location can
be derived from the production version?
Please choose the correct answer.
Response:
MRP Controller
mee Group
MRP Profile
Plant Data
Money Back Guarantee | Testimonial | Links | FAQs | Privacy Policy | Terms and Conditions | About Us
Join Us | Contact Us