You are on page 1of 17
yy) SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini You got 33 of 40 possible points. Your score: 83 % Question Results Question: Which of the following are included as SAP S/4HANA Sales Simp! There are 3 correct answers to this question, Response: WO Settlement Management replaces ERP SD Rebates YK. sar sales Support replaces SAP CRM VO SAP Revenue Accounting replaces ERP SD Revenue Recognition YK sa? order Fulfillment replaces ERP SD Availability Checking v SAP GTS replaces ERP SD Foreign Trade Question: Score 1 of 1 What are properties of MRP Live? There are 2 correct answers to this question Response: Data is read sequentially from the database tables The code is written in SQL Script It uses the same BAdis as classic MRP WO itis executed on the database server Score 0 of 1 Question: What are benefits of the Engineering Workbench? There are 2 correct answers to this question Response: YK. undo/redo functionality of planned changes Simulation of planned changes for costing and mater all requirements planning WO Detailed selection of bill of materials (BOM)items and operations Simultaneous processing of different bill of materials (BOM) items and operations Score 1 of 1 Question: Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag? There are 2 correct answers to this question. Response: Production version VS Material SO Work center Plant Question: Score 1 of 1 d Scheduling Board have? Which functional capabilities does the Detai There are 2 correct answers to this question Response: Change sales order quantities Enter time-ticket confirmation for production orders MW Undo for drag & Drop planning activities VW Change planned order quantities Question: Which There are 2 correct answers to this question. Response: Work Center BOM VM Sales Order BOM Class BOM Functional Location 80M Score 1 of 1 ill of material (BOM) categories can you define in SAP S/4HANA? Question: What steps are possible in a PP/DS production planning run? There are 3 correct answers to this question. Response: MO Deteted senecutng functions optimization Demand consumption VM Heuristics Score 1 of 1 Backorder processing Score 1 of 1 Question: You run MRP for a material that was planned using Demand-Driven Replenishment. ‘Towards which buffer level does the MRP run create a replenishment proposal? Please choose the correct answer. Response: Top of Green Top of Red Base Top of Yellow Top of Red Score 1 of 1 Question: ‘ely, without moving other operations. Which You want to schedule an operation scheduling strategy do you select? Please choose the correct answer. Response: Insert operation Squeezing VS Find slot Scheduling working time only Score 1 of 1 Question: Which task list types can have parallel sequences? There are 2 correct answers to this question Response: Master recipes (2) SO Rate routings (R) Reference operation sets (S) VS Routings (N) Score 1 of 1 Question: In Make-to-order production, which field controls whether the components will be planned as sales order specific stock? Please choose the correct answer. Response: The item category of the component in the BOM The Planning Strategy of the finished product The Individual/Collective indicator of the component The MRP Type of the component Score 1 of 1 Question: How can SAP S/4HANA support a GMP compliant production process? There are 3 correct answers to this question Response: \C- Documentation of quality data with Quality Management Predefined GMP compliant process order types to meet audit requirements SO Recipe approval with Engineering Change Management Vv Use of the digital signature function to check and run business processes Use of the GMP compliant flag in relevant master data applications Question: Score 1 of 1 You want to integrate an existing planned order into Advanced Production Planning. Which report do you use? Please choose the correct answer. Response: \@_/SAPAPO/PPDS_DELTA_ORD_TRANS /SAPAPO/CURTO_CREATE /SAPAPO/UPD_LOC_SP_PL /SAPAPO/CREATE_LOCATION Score 0 of 1 Question: What are the possible categories for the Business Partner master data object in SAP S/4HANA? There are 3 correct answers to this question. Response: * Vendor Group Organization v v MO Person x Customer Question: Score 1 of 1 Which characteristics should a material have for re-order point planning? There are 2 correct answers to this question Response: Replenishment lead time is known and relatively constant. Seasonal demand is relatively volatile Demand remains relatively constant. Material replenishment is managed by the vendor (VMI). Score 0 of 1 Question: Which of the following objects can you release so that the business transactions for process order execution and process management can be executed? There are 2 correct answers to this question. Response: VW Individual operations Individual phases Individual process instructions YK individual contro! recipes Question: Score 1 of 1 ‘A material in your company is planned with planning strategy 70 (Planning at assembly level). The consumption mode has been set to backwards with a consumption period of 12 days. Starting from when are the 12 days counted backwards? Please choose the correct answer, Response: VO From the dependent requirement date of the material From the requested delivery date of the related finished good From the planned independent requirement date of the material From the availability date of the related finished good Question: Score 1 of 1 Which of the following is used by the MRP Live planning run in SAP S/4HANA? Please choose the correct answer. Response: Net change planning MRP list Planning horizon Parallel processing across servers Question: Which SAP solu' There are 2 correct answers to this question. Response: Integrated Business Planning (1BP) Material Requirements Planning (MRP) Capacity Requirements Planning (CRP) Supply Chain Management (SCM) Score 1 of 1 ns can be used for forecasting in Supply Chain Planning? Question: What new technology is used in SAP S/4HANA Embedded Analytics? Please choose the correct answer. Score 1 of 1 Response: ‘Smart Business Cockpit HANA Live Multidimensional Reporting client (MDRC) Apap Managed Core Data Services (CDS) Question: Score 1 of 1 If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement? Please choose the correct answer. Response: Fill up to the maximum stock level VW Fill up based on the lot size procedure Fill up to the reorder stock level Fill up to the safety stock level Question: Score 1 of 1 Your customer is using storage location is in SAP ECC and wants to switch to SAP S/4HANA. What do you have to consider? Please choose the correct answer. Response: You have to set one MRP area for every storage location. MRP Live does NOT support storage locations, but classic MRP still does. Storage location MRP is replaced by MRP area functionality. Storage locations are NO longer supported, Question: Score 1 of 1 You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place? Please choose the correct answer. Response: When the MRP results are saved When you deliver a sales order MO when you create a sales order When you create a planned order Question: Score 1 of 1 Which master data object governs the relationship between supply source and demand source in the Kanban process? Please choose the correct answer. Response: Rate routing Production supply area control cycle Replenishment strategy Score 0 of 1 Question: Which automotive-specific functionality is embedded in SAP S/4HANA? There are 3 correct answers to this question. Response: YK Enhanced characteristics based processes Equipment and Tools Management Parts interchangeability VM Packaging Logistics Enhanced Kanban Processing Question: Score 1 of 1 Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA, When can you use mode selection? Please choose the correct answer, Response: When multiple planned orders exist on one resource When multiple operations are maintained for one product When multiple production versions are maintained for one product When alternate resources are used within one operation Score 1 of 1 Question: SAP Which warehouse management functions are available in SAP EWM but NOT wn? There are 3 correct answers to this question. Response: Yard Management Labor Management Handling Unit Management SO Slotting Expected goods receipt Score 1 of 1 Question: You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place? Please choose the correct answer. Response: a9 THe Nem operation Is Inserted at the desired time the previously dispatched eperation is moved backward. The previously dispatched operation stays as is the new operation is inserted after the dispatched operation, The previously dispatched operation stays assist the new operation is inserted before the dispatched operation. The new operation is inserted at the desired time; the previously dispatched operation is moved forward. Score 1 of 1 Question: Which chart types does the tabular planning table provide in SAP S/4HANA? There are 2 correct answers to this question Response: VM capacity requirements chart Order (pool) chart WO Work center capacities chart Orders (dispatched) chart Score 1 of 1 Question: The production plan Is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question Response: Gh Mznually firm all planned orders for materials within the replenishment lead time of the material 9h ihe stock requirements Ist set a manual Arming fence for a date based on the replenishment lead time of the material In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material Question: Score 1 of 1 ive manufacturing relevant work In which data object is the production line (Repeti center) maintained? Please choose the correct answer. Response: MO Prosvetion version Bil of materia Cost collector Repetitive manufacturing profile Score 1 of 1 Question: What does it mean for the production planner when MRP works with infinite capacities? Please choose the correct answer. Response: MRP creates capacity requirements only if the work center has sufficient capacity. Opp creates capacity requirements without checking the capacity of a work center. MRP assigns capacity requirements automatically after the last scheduled order on a work center, MRP assigns capacity requirements automatically to work center is with the earliest available capacity. Score 0 of 1 Question: You define forecast consumption as an integral part of your Production Planning and Detailed Scheduling process. Which of the following order types consume the forecast? There are 2 correct answers to this question Response: MU sates order YK Pienned order Purchase order Dependent demand Score 1 of 1 Question: Which of the following business processes are controlled by production order type- dependent parameters? There are 2 correct answers to this question. Response: Engineering change management VM Planning Implementation Inspection during production Question: Score 1 of 1 How can you set up the supply source for the SAP Kanban process? There are 3 correct answers to this question Response: Using quotations for internal and external procurement Using stock transfer reservations for stock transfer Using run schedule quantities for in-house production VO using purchase orders for external procurement Using purchasing costs for automated source prioritization Score 1 of 1 Question: The method in which a production order is credited or debited depends on the variant of cost object controlling (COC). What basis can be used to carry this out? There are 2 correct answers to this question Response: Cost-related VO order-related Milestone-related VM Product-related Score 1 of 1 Question: Your project uses process orders for the production of Ii chemicals, What can you define to ensure that the production flow happens only in physically connected tanks? Please choose the correct answer. Response: Setup matrix Work center hierarchy Operation network MO Resource network Score 0 of 1 Question: Which advanced functionality has been embedded in SAP S/4HANA? There are 3 correct answers to this question, Response: VS pvailable-to-promise YK Demand planning Supply Network Planning Backorder processing capacity planning Question: Score 1 of 1 What is a typical transportation processing SAP Transportation Management? Please choose the correct answer. Response: Transportation Planning, Transportation Execution, Order Management, Freight Costing and Settlement, Analytics and Reporting Order Management, Transportation Planning, Freight Costing and Settlement, Transportation Execution, Analytics and Reporting VE _ Order Management, Transportation Planning, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting Transportation Planning, Order Management, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting Question: Score 1 of 1 An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master. What determines whether the storage location can be derived from the production version? Please choose the correct answer. Response: MRP Controller mee Group MRP Profile Plant Data Money Back Guarantee | Testimonial | Links | FAQs | Privacy Policy | Terms and Conditions | About Us Join Us | Contact Us

You might also like