You are on page 1of 18
yy) SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini You got 35 of 40 possible points. Your score: 88 % Question Results Question: You want to reduce planning efforts for B/C materials, WI do you recommend? Please choose the correct answer. Response: Forecast planning consumption-based planning Manual planning without check Material requirements planning Score 1 of 1 9 procedure Question: What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question Response: Real time decision support Comparison of current data with historical data to identify trends Automatic update of story boards Score 1 of 1 VO Strategic analysis Score 1 of 1 Question: What do you use to schedule operations from planned orders so that the production plan can be fulfilled? Please choose the correct answer Response: Demand Planning (DP) Supply Network Planning (SNP) Capacity Requirements Planning (CRP) Materia! Requirements Planning (MRP) Score 1 of 1 Question: A material has been set up as a phantom assembly by entering the special procurement key in the material master, How can you switch off the phantom assembly in a specific bill of material (BOM)? Please choose the correct answer. Response: Change the item category of the phantom assembly in the BOM Change the phantom item indicator for the phantom assembly in the BOM. Change the explosion type of the phantom assembly in the BOM. Change the special procurement key of the phantom assembly in the BOM. Score 1 of 1 Question: To ensure that the warehouse operator only stages large components in the exact required quality for each production order, wi method would you recommend? Please choose the correct answer. Response: VS Pick parts Kanban Crate parts Release order parts Question: Score 1 of 1 In the Schedule Production app, which settings can you make in the planning strategy? There are 3 correct answers to this question Response: Scheduling control (finite/infinite) Planning mode (bucket/sequence) Finiteness level (0...1) Direction (forward/backward) Fixed pegging (on/off) Score 1 of 1 Question: Which options are available for an SAP S/4HANA deployment? There are 2 correct answers to this question Response: SAP S/4AHANA Enterprise Management cloud 0 sap S/aHANA on premise SAP S/4HANA private cloud SAP S/4HANA Professional services cloud Score 0 of 1 Question: The method in which a production order is credited or debited depends on the variant of cost object controlling (COC). What basis can be used to carry this out? There are 2 correct answers to this question. Response: Milestone-related VC Product-related KK cost-reiated VO Order-related Question: Score 1 of 1 a production order? When can the material availability check occur automatically There are 2 correct answers to this question Response: At order settlement At order confirmation Oe order creation WO Aorder release Score 1 of 1 Question: You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place? Please choose the correct answer. Response: When the MRP results are saved When you create a planned order When you deliver a sales order WC when you create a sales order Score 0 of 1 Question: Which material-specific information can be transferred to a transportation lane in PP/Ds? There are 3 correct answers to this question Response: VO outline agreement Special procurement keys WM Purchasing info records Quota arrangements YK Production versions Question: Score 1 of 1 Aresource was created in SAP S/4HANA PP/DS through the internal CIF integration and named “W1904_1000_001”, What does the suffix 001 in the resource name represent? Please choose the correct answer. Response: Work center category Number of individual capacities Available capacity version capacity category Question: Score 1 of 1 What new technology is used in SAP S/4HANA Embedded Analytics? Please choose the correct answer. Response: Smart Business Cockpit HANA Live apap Managed Core Data Services (CDS) Multidimensional Reporting client (MORC) Question: Score 1 of 1 What are the three transition scenarios for an S/4HANA implementation? There are 3 correct answers to this question. Response: System activation New implementation VM Landscape transformation System upgrade system conversion Question: Score 1 of 1 9 of a product on order? Which time elements are relevant for lead time schedul There are 2 correct answers to this question. Response: Float after production VO Planned delivery time Total replenishment lead time Setup time Score 1 of 1 Question: What are the possible results of a production planning run in Advanced Planning (PP/OS)? There are 3 correct answers to this question Response: Production order VM Planned order Purchase requisition Stock transport order VW Scheduling agreement schedule line Question: Score 1 of 1 What is a work center hierarchy in SAP S/4HANA capacity planning? Please choose the correct answer. Response: ‘A group of work centers in a production line being used in sequence for production ‘A group of alternative work centers for production, structured in hierarchy levels by priorities A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel Ao“ 2Foup of alternative work centers providing a cumulative available capacity for production Score 1 of 1 Question: What are examples of assignment objects you can maintain in the Engineering Workbench? There are 3 correct answers to this question Response: VO Component assignment Material to routing assignment MO Material to bill of materials (BOM) assignment Material to production version assignment Routing to sequence assignment Score 1 of 1 Question: Which capabilities does the Alert monitor have? There are 3 correct answers to this question. Response: Automatically send alerts with Alert Notification Engine WC Nominate time-dependent substitutes for a planner Automatically reschedule in case of overload alerts Vv Generate alerts based on defined threshold values Automatically predict alerts in future planning cycles Score 1 of 1 Question: The pegging situation was changed because of an MRP heuristic run, What is a capability of dynamic pegging? Please choose the correct answer Response: Vv It links receipts from an alternative location in case of a shortage in the default location It propagates changed sales order priorities to the pegged planned orders It replaces fixed pegging relationships unless they have been created for stock It enables the propagation of network alerts across the bill of materials structure Question: Score 1 of 1 A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake. What impact would this have to other users for this specific production order? Please choose the correct answer. Response: The warehouse clerk still carry out goods issue transactions The buyer can still see component reservations The production manager can still see the capacity requirements VO The production operator cannot enter additional confirmations Question: Score 1 of 1 You want to procure your materi ished material derived from historical sales, When customers order, you produce the ished product and reserve it for that particular order. | components based on a forecast for the fi Which is the appropriate planning strategy to use? Please choose the correct answer. Response: 40 Planning with final assembly 30 Production by lot size 50 Planning without final assembly 20 Make to order production Question: Score 1 of 1 ic material statuses in the 2 When working with both cross-plant and plant-speci material master, which status has the highest pri Please choose the correct answer. Response: The cross-plant status The most restrictive status The plant-specific status The least restrictive status Score 0 of 1 Question: In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? There are 2 correct answers to this question. Response: use a specific MRP controller. Use a specific material group Muse a specific material status. JK Use a speci HRP type Question: Score 1 of 1 Which transaction code can you use in SAP S/4HANA to enter and display goods movements? Please choose the correct answer. Response: MBNL MBo2 MMBE Mico Score 1 of 1 Question: An issue storage location was NOT found through the work center, bill of mate (BOM) item, or material master, What determines whether the storage location can be derived from the production version? Please choose the correct answer. Response: MRP Controller MRP Profile MRP Group Plant Data Question: Score 1 of 1 Which of the following data objects are updated when a user confirms an operation? Please choose the correct answer Response: Production order total order quantity Production order header status Warehouse transfer order status Shop floor information system Score 0 of 1 Question: A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system. Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts? Please choose the correct answer. Response: EO Finite resource and infinite strategy Infinite resource and infinite strategy Infinite resource and finite strategy YK Finite resource and finite strategy Question: Score 1 of 1 Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use? Please choose the correct answer. Response: Planning with final assembly (40) Make-to-order production (20) Make-to-stock production (10) Planning without final assembly (50) Score 1 of 1 Question: Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP? There are 2 correct answers to this question: Response: Setup time VM Goods receipt processing time VM opening period Float before and float after production Question: Score 1 of 1 The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA? Please choose the correct answer. Response: WO Production Version Contract Purchasing Info Record Selection Method Score 1 of 1 Question: n order is created from a planned order. The system should determine a n version. What must you doing the system for the selection to product occur? Please choose the correct answer. Response: Create several production versions with valid dates. WW sexthe customizing setting Automatic Selection of Production Version active Change the production version assignment in the production order using the Read Master Data function. Set the customizing setting Manual Selection of Production Version active. Score 1 of 1 Question: A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question Response: VM Production scheduling profile Scheduling margin key ‘Confirmation profile VS operat control key Question: Score 1 of 1 What does forecasting in the demand planning cycle include? There are 3 correct answers to this question Response: Past sales order quantities one-off events Past procurement quantities VM Market intelligence Past quotation quantities Question: Score 1 of 1 Which of the following processes lead to an entry in the MRP planning file? There are 3 correct answers to this question, Response: VO Creation of dependent requirements Change of the material's procurement type Change of the storage bin Creation of a purchasing contract Creation of a sales order Question: Score 0 of 1 Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability. Which information is required to the scope of check? plement t There are 2 correct answers to this question. Response: The ATP category for restricted-use stock \@ The checking rule from the business application YK The checking control for the order type The checking group from the material master Score 1 of 1 Question: What are properties of MRP Live? There are 2 correct answers to this question Response: ata is read sequently from the database tables Wis executed onthe database server It uses the same BAdis as classic MRP MO The code is written in SQL Script Score 1 of 1 Question: You want to triggering-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material? Please choose the correct answer. Response: Planning without final assembly (50) Planning with final assembly (40) Planning at assembly level (70) Make-to-order production (20) Question: Score 1 of 1 In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy? Please choose the correct answer. Response: WO vixed MRP indicator Individual/Collective Indicator Storage Location MRP Indicator Dependent Requirements indicator Question: Score 1 of 1 You are using heu! SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created? Please choose the correct answer, Response: Delivery date Costs Component availability Vendor rating Quota arrangement Money Back Guarantee | Testmonia | Links | FAQs | Privacy Poi | Terms and Conditions | About Us Join Us | Contact Us

You might also like